July 2,.

1999 MEMORANDUM TO:

Richard P. Corr;im, Chief Reliability and Maintenance Section Quality Assurance, Vendor Inspection, Maintenance And Allegations Branch Original signed by:

Gregory C. Cwalina FROM:

Gregory C. Cwalina Reliability and Maintenance Section Quality Assurance, Vendor Inspection, Maintenance And Allegations Branch

SUBJECT:

INSPECTION PLAN - GENE Attached is the proposed inspection plan for the followinq vendor inspection:

VENDOR:

GENE 175 Curtner Ave.

San Jose, CA 95127 DOCKET / REPORT NO:

99900403/1999201 INSPECTION DATES:

July 20-21,1999 Distribution:

lOMB Reading File JLee FTobler MMitchell KWichman BBateman TQuay Central Files Docket Files PUBLIC DOCUMENT NAME: G:\\ DRAFT \\CWALINA\\ GENE _insp_ Plan.wpd To receive a copy of this document, Indicate in the box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy OFFICE IOMBOJRM E

CMCB:DE E

lOMB:DIPM C

NAME GCCGliher

- MMitchell#1her RPCorreia %ff-DATE 7/T/99 7/.//99 7/A /99 OFFICIAL RECORD COPY Wi!J p

' '] O Q ) y 9907090162 990702 PDR GA999 ENVGOE IJ)4 b b-99900403 PDR G,Mvll.9Yfw405)

s INSPECTION PLAN E.QB GENE CONTACT:

- Kenneth Brayman DATES July 20-21,1999 REPORT NO:

99900403/1999201 TEAM MEMBERS:

Gregory Cwalina, lOMB Matthew Mitchell, EMCB PURPOSE:

To perform an inspection of GENE activities with regard to the supply of nuclear reactor vessel material surveillance capsules.

BACKGROUND:

The staff is assessing the adequacy of documentation supporting the preparation of nuclear reactor vessel surveillance capsules to assure the materials used in the surveillance capsules are representative of the reactor vessel materials.

SCOPE AND ASSIGNMENTS:

j Review the supporting documentation associated with the supply of the reactor vessel surveillance capsules for vessels manufactured by Chicago Bridge and Iron (CB&l), including the following documents, as available:

CMTR from vessel material manufacturers (e.g., Lukens) to the vessel manufacturer (CB&l).

Traceability of surveillance capsule material to reactor vessel material.

Shop traveler documents that record the relationship of the surveillance capsule materials to the reactor vessel and parent material.

Work package documents showing weld information, including welding procedures used, weld material, heat flux, etc.

Quality assurance of surveillance capsules.

Documentation relating to preparation of materials into surveillance capsule specimens.

Shipping documents to facility (GE Wilmington) assembling the materials into surveillance capsules.

Final work packages documenting placing correct materials in capsules.

Shipping documents to licensees.

/

.\\

(

ADMINISTRATIVE ISSUES I

l l

INSPECTION SCHEDULE Entrance Meeting:

8:30 a.m., Tuesday, July 20,1999 Exit Meeting:

4:00 p.m., Wednesday, July 21,1999 i

RITS INFORMATION i

Docket #: 99900403 l

Inspection Report: 1999201 l

IMI Code: IVEN -

Procedure Number: 43001

\\

l I