ML20209C123
| ML20209C123 | |
| Person / Time | |
|---|---|
| Site: | Vallecitos Nuclear Center |
| Issue date: | 06/21/1999 |
| From: | Murray B GENERAL ELECTRIC CO. |
| To: | Eresian W NRC |
| References | |
| NUDOCS 9907090160 | |
| Download: ML20209C123 (1) | |
Text
4.g 1
~
GE Nuclear Energy w
c.s e s u.a x a,w a:r j
VJlleatoi Nuclear Center I
rl0.h YdllMCllGS b$s)rK$, 00D0l {b $$b80 June 21,1999
)
i U.S. Nuclear Regulatory Commission ATTN: Warren Eresian
)
Mail Stop 11 D19 Licensing Examiner Washington, D.C. 20555-0001
Reference:
Lic:;nse R-33, Docket 50-73
)
Dear Warren:
Enclosed please find the following documents for the GE Nuclear Test Reactor, License R-33, Docket 50-73:
Standard Operating Procedures, Chapters 1-10 & 12 (there is no Chapter 11)
License and Technical Specifications Safety Analysis Report l
These materials are being transmitted to you in anticipation of the administration of a Senior Reactor Operator's licende examination for E.H. Ehrlich. His application will be forwarded separately. We would appreciate your scheduling this examination at your earliest
)
convenience. We are very tentatively looking at mid-August at the earliest. We will contact you M1 )
later to establish a mutually agreeable schedule for the examination. Thank you.
/*1 Sincerely, l
l Pw B. M. Murray l
Senior Licensing Engineer l
(925) 862-4455 l
Enclosures 9907090160 990621 PDR ADOCK 05000073 PDR I
-