ML20209B634

From kanterella
Jump to navigation Jump to search
Part 21 Rept Re Chemical & Vol Control Sys Centrifugal Charging Pump hold-down Bolts.Review Continuing.Nrc Will Be Informed of Results of Condition Evaluation by 860926
ML20209B634
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 08/20/1986
From: Foster D
GEORGIA POWER CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-PT21-86, REF-PT21-86-321-000 GN-1046, PT21-86-321, PT21-86-321-000, NUDOCS 8609080282
Download: ML20209B634 (1)


Text

rr Georgia Power Company Post Office Box 28?

' Waynesboro Georgia 30830 Telephone 404 554-9961 Ext. 3360 404 724-8114. Ext. 3360 GeorgiaPower D. O. Fost.,

gel HM sou 'Em etwtic syswm August 20, 1986 I

S United States Nuclear Regulatory Commission E

I Region II File: X78G03GR111 Suite 2900 Log:

GN-104G l

b3

}

ta a or a

Reference:

VogtleElectricGeneratingPlant-Units 1and2;50-424,50]25; CVCS Centrifugal Pump Hold-Down Bolts; e

Letter GN-901 dated May 6,1986; Letter GN-992 dated July 11, 1986 Attention: Mr. J. Nelson Grace Georgia Power Company is continuing its review of the cor.dition-concerning the CVCS centrifugal charging pump hold-down bolts.

Georgia Power Company now expects to inform the NRC of the results of the evaluation of this condition by September 26, 1986.

This response contains no proprietary information and may be placed in the NRC Public Document Room.

Yours truly, I

l}

D. O. Fostee l-REF/D0F/tdm xc:

U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C.

20555 J. H. Miller R. A. Thomas L. T. Gucwa J. P. O'Reilly D. R. Altman C. W. Hayes G. F. Head P. R. Bemis G. A. ficCarley R. E. Conway J. A. Bailey D. S. Read J. T. Beckham

0. Batum Sr. Resident (NRC)

R. H. Pinson G. Bockhold C. S. ficCall (OPC)

P. D. Rict.

C. E. Belflower J. E. Joiner (TSLA)

B. M. Guthrfe J. F. D'Amico D. C. Teper (GANE)

D. E. Dutton E. D. Groover NORMS

% [

Db k

h S

ff 7%

~

_ _____ _ - _____ _