ML20209B396

From kanterella
Jump to navigation Jump to search
Responds to 860219 Request for Incorporation of Periodic Insp of Maint & Testing of Seismic Instrumentation Into Routine Insp planning.One-time Insp at All Region III Facilities Will Be Completed by 860930
ML20209B396
Person / Time
Issue date: 09/04/1986
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Partlow J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20209B402 List:
References
NUDOCS 8609080226
Download: ML20209B396 (2)


Text

-

po8 SEP O 4 gg MEMORANDUM FOR: James G. Partlow, Director, Division of Inspection Programs, Office of Inspection and Enforcement FR0!!:

Charles E. Norelius, Director, Division of Reactor Projects, Region III

SUBJECT:

PERIODIC INSPECTION OF SEISMIC MONITORING INSTRUMENTATION By memorandum dated February 19, 1986 you requested Region III to incorporate periodic inspection coverage of maintenance and testing associated with seismic instrumentation into our routine inspection planning. This is being done in the following fashion:

1.

A one time inspection at all Region III facilities will be completed by September 30, 1986 to establish the type of instrumentation at each facility, applicable surveillance requirements - both licensee originated and in the Technical Specifications, applicable preventive maintenance performed, and recent failure history.

2.

Annual inspections to ascertain equipment, testing, and maintenance status.

The results of item 1. above will be documented on a survey form provided to the resident inspectors. Copies of these forms will be forwarded to you on or before October 30, 1986. The results of item 2. above will be documented in routine Resident Inspector reports.

As implementation of a periodic inspection program via memorandum is somewhat unwieldy, Region III recommends that IE incorporate periodic inspection of seismic instrumentation into an existing MC2515 minimum program Inspection Procedure (IP).

In this regard, please find attached a copy of page 5 of IP 71707, marked up for your use in implementing this recommendation.

Your cooperation in incorporating seismic instrumentation inspection requirements into an existing IP in a timely manner would be appreciated.

If you have any questions in this regard, please contact W. Guldemand (FTS 388-5574) of my staff.

4.

  • d,.i

.1 Charles E. Norelius, Director Division of Reactor Projects

Attachment:

Marked up copy of page 5 of IP 71707 RI!!

RII T

7 Gu enond/cs N

}U ql ius

$ }h $ll 06090aon26 060YO4 PDH I&E MISC PDR t

r

'lDourill n as,.:C eeau es US.C:pCLt An da CULCTORYcomumsiO4 I...,

ACTION ITEM CONTROL FORM A. INITIAllNG OFFICE AS$1GNE D TR ACKINGAuMetR 83-

84. All
05. DATE OF RE PORT 06.DATE OF TRANSACTION
01. SE NDING 02.5t OVE NCE NWMSE R PRIORITV. TYPE OF F ICE MONTH DAY TEAR MONTH DAY VGAR FC30

/; 0 /

f 6 h

D a s 7 f 6

~

~~

00. RE OUE5TED
07. F ACILITY L ION DAW W. REOUESTER WONTH DAY VSAR D '3 3 / [ b d d f E L / b 5 6 3
10. DESCRIPTION S

E-l 5 m I

C-I n 5 T f u m f

h r + r o n p

A I

L O

l' f

G

8. ACT60N OFFICE Di.RE CE mNG OF,,CE IChoreanorerrke e* fee ee61 s
02. PtR$0N ASSIGNED ESTABLISHE D COMPLETION DATE o

a =c, e la C E

E n na lh h O 3 0 3 % /

9 4 T R ANS F E R INF ORM ATION

05. TR ANSFIR ACTION 07.TR ANSFE R D ATE OC.TR ANSF E R CODE
uom, CLO$t Duf INF ORMATION 06.CLDEIOtff ACTION
09. MAN. 10. CLOtt. 11.CLOSEOLTT DATE
12. REQUEST HOURS.

OUT CODE woww ma' M **

ACNNOWLE DGEO M

)I C-m o

A C

F h)

F W G L f,

f

'4 l Q ]

Q tj l' &

7 e

k B

O en

=

9 O

.