Responds to to Chairman Jackson Which Expressed Number of Concerns Re Proposed Rule That Would Amend NRC Environ Review Requirements for Renewal of NPP Operating Licenses,Which Was Published in Fr on 990226
ML20209B157
Person / Time
Issue date: 06/28/1999
From: Travers W
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Porter J
NEVADA, STATE OF
Shared Package
ML20209B162 List:
References
NUDOCS 9907060285
Download: ML20209B157 (13)


Text

j k

pa as49 y  % UNITE] STATES g j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20066 4001

          • June 28, 1999 The Honorable Jon C. Porter Nevada State Senator 401 S. Carson Street Carson City, Nevada 89701-4747

Dear Mr. Porter:

I am responding to your letter of April 27,1999 to Chairman Jackson. Your letter expressed a number of concerns about the proposed rule that would amend the U.S. Nuclear Regulatory Commission's (NRC's) environmental review requirements for the renewal of nuclear power plant operating licenses, which was published in the Federal Reaister on February 26,1999 (64 FR 9884). This rule is intended for the specific purpose of determining the generic environmentalimpacts of the transportation of high-level waste to be included in evaluations of applications to renew nuclear power plant operating licenses. Although it is based on assumed future use of a geologic repository at Yucca Mountain, it does not approve or authorize such use. Because of the generic scope a/J applicability of this rulemaking and for the other reasons described below, we have not granted your requests to extend the public comment period and to hold a public hearing in Southern Nevada.

The comment period ended April 27,1999; however, as stated in the Federal Register notice, comments received after the end of the comment period will be considered to the extent practicable. We will include all of the specific comments you provided in your letter in the record of public comments on the proposed rule, and will address them as such.

The licensing process for Yucca Mountain requires the Department of Energy (DOE) to submit, for NRC review and approval, an application to receive and possess source, special nuclear, and byproduct material at a geologic repository. Along with the application, DOE must submit an environmentalimpact statement (EIS). In accordance with the Nuclear Waste Policy Act of 1982, the NRC staff will review the DOE EIS to determine whether it is sufficient to satisfy the NRC National Environmental Policy Act (NEPA) requirements. In the EIS, the DOE staff will evaluate the environmental impacts, including transportation associated with the construction and use of a geological repository. The draft DOE EIS is scheduled to be avr.ilable for public review and comment by July 1999. You and your constituents are encouraged to comment on it at that time.

Given the discrete issues covered by this propcsed rule change, the Commission believes that the 60-day public comment period, which extended from February 26 to April 27,1999, was reasonable, and does not believe that a public hearing was warranted. Although we were not q able to grant your requests in this instance, the NRC takes seriously its responsibility to keep /g/

T@//I mm 9907060285 990628 acmfcansCWY PDR STPRG ESONV h ~~ {

X' t o 2-

v

. The Honorable Jon C. Porter 2-the public informed and to facilitate public participation in its regulatory development and change process. We are constantly working to improve public confidence and our public information activities. We value your comments and will strive to improve'our effectiveness in this area.

Sincerely, William D. Travers Executive Director for Operations i

i I

I l

l

9 The Honorable Jon C. Porter the public informed and to facilitate public participation in its regulatory development and change process. We are constantly working to improve public confidence and our public information activities. We value your comments and will strive to improve our effectiveness in this area.

Sincerely, Orig!nal Signed by I Willbrn D. Travers William D. Travers Executive Director for Operations l

l

  • See previous concurrence Document Name:G:\GT227-99 OFFICE *RGEB 'SC:RGEB *BC:RGEB *BC:RLSB *D: DRIP NAME AMarkley:sw MMalloy CCarpenter CGrimes DMatthews DATE 5/07/99 5/07/99 5/20/99 5/10/99 5/10/99 OFFICE *OGC AD: DIP * *D:OSP *D:NMSS *D:NRR NAME SBurns WKane PLohaus CPaperiello SColl:os DATE 5/M 5/14/99 5/11/99 5/11/99 5/13/99 OFFICE EDOkf NAME WTrtMr s )

DATE [99 OFFICIAL OFFICE COPY l

e J

e DISTRIBUTION: Green Ticket 19990227 Ltr. J. Porter fm W. Travers Dated June 28, 1999

- Central File (w/ incoming)(GT19990227)

PUBLIC (w/ incoming)(GT19990227)

EDO r/f(w/ incoming)(GT19990227)

RGEB r/f (w/ incoming)(GT19990227)

RLSB (w/ incoming)(GT19990227)

NRR Mailroom (w/ incoming)(GT19990227)

WTravers MKnapp FMiraglia PNorry JBlaha SBurns, OGC PLohaus, OSP CPaperiello, NMSS EMerschoff, RIV SCollins/RZimmerman WKane BSheron DMatthews/SNewberry.

CGrimes CCarpenter MMalloy DCleary AMarkley '

MManahan SJackson  !

)

9

PJ ]

The Honorable Jon C. Porter 2- J I

.Given the discrete issues covered by this proposed rule change, the Commis ' n believes that )

' the 60-day public comment period, which extended from February 26 to Apr' 27,1999, was reasonab'e. Furthermore, for the reasons set forth above, the Commissi does not believe

' that a public hearing was warranted. As previously stated, however, c ments received after the end of the comment period will be considered to the extent practi ble.

Sincerely, William D. avers Executive irector for Operations

  • See previous concurrence Document Name:G:\GT227-99 OFFICE *RGEB */C:RGEB *BC:RGEB *BC:RLSB 'D: DRIP NAME AMarkley:sw [MMalloy CCarpenter CGrimes DMatthews DATE 5/07/99 / 5/07/99 5/20/99 S/10/99 5/10/99 OFFICE *OGC [' ADA@{j *D:OSP *D:NMSS *D:NRR [

NAME SBurns[ Wbb PLohaus CPaperiello gh,ollins l DATE 5/12/h 5//I/99- 5/1i!99 5/11/99 ' 5/13/99 OFFICE' EDg' NAME Wfravers f

DATE [/ /99 OFFICIAL OFF E COPY L

l L

The Honorable Jon C. Porter Given the discrete issues covered by this proposed rule change, the Commission believes that the 60-day public comment period, which extended from February 26 to April 27,1999, was reasonable. Furthermore, for the reasons set forth in the preceding, the Commission does not believe that a public hearing was warranted. As previously statedthowever, comments received after the end of the comment period will be considered to the extent practicable.

\

Sincer [/

\

l William D. Travers Executive Director for Operations 1

i l

i i

  • See previous concurrence Document Name:G:\GT227-99 OFFICE *RGEB *SC:RGEB *BC:RGEB *BC:RLSB *D: DRIP NAME AMarkley:sw MMalloy CCarpenter CGrimes DMatthews '

DATE. 5/07/99 5/07/99 5/20/99 5/10/99 5/10/99 OFFICE *OGC AD: DIP *D:OSP *D:NMSS D:NRR [>pQ NAME SBurns WKane PLohaus CPaperiello f T3 Collins DATE 5/12/99 5/ /99 5/11/99 5/11/99 5/ f 3/99 OFFICE EDO NAME WTravers DATE 5/ /99 OFFICIAL OFFICE COPY L.

The onorable Jon C. Porter Given ' discrete issues covered by this proposed rule change, the Commission believes that the 60-day pbblic comment period,'which extended from February 26 to April 27,1999, was reasonable. Fu'rthermore, since the proposed rule change applies to the specific aspects of license renewal, th'e Commission does not believe that a public hearing was warranted. As piaviously stated, hodever, comments received a*er the end of the comment period will be considered to the extent' acticable.'

Sincerely, William D. Travers xecutive Director f Operations q j

s

  • See previous concurrence Document Name:G:\GT227-99 OFFICE *RGEB *SC:RGEB *BC:RGEB *BC:RLSB *D: DRIP NAME AMarkley:sw MMalloy CCarpenter CGrimes DMatthews DATE 5/07/99 5/07/99 5/10/99 5/10/99 5/10/99 OFFICE *OGC AD: DIP *D:OSP *D:NMSS D:NRR NAME SBurns WKane PLohaus CPaperiello ISCollins DATE 5/12/99 5/ /99 5/11/99 5/11/99 5/ /99 OFFICE EDO NAME WTr ers DATE 5/ ,d9 OFFICIAL OFFICE COPY

w Th Honorable Jon C. Porter I Given the' discrete issues covered by this proposed rule change, the Commission believes that i the 60-day public comment period, which extended from February 26 to April 27,1999, was l reasonable. Furthermore, since the proposed rule change applies to the specific aspects of i license renewal, this Commission does not believe that a public hearing was warranted. As previously stated, however, comments received after the end of the comment period will be ,

considered to the extent p'rgticable. .

Sincerely, ,

1

)

\yVilliam D. Travers ecutive Director for Operations

\

Document Name:G:\GT227-99

~

OFFICE RGEB,__ SC:RGEB BC:RGEB BC:RLSB D: DRIP NAME / NrkyIsw N oy CCarpentN CGrimek-y[ DMadke[

DATE 5/1/99 5 9 /99 5/1D/99 5/10/99 5/10/99 OFFICE OG[M AD: DIP D:OSP D:NMSS D:NRR NAME SBum WKane PLohaus CPaperiello SCollins l DATE 5/N799 O 5/ /99 5/ /99' 5/ /99 5/ /99 OFFICE EDO NAME WTravers DATE 5/ /99 OFFICIAL OFFICE COPY

i ..

l 1

4 The Honorable Jon C. Porter \x N

Given the discrete issues covered by this proposed rule change, the Commission believes that the 60-day public'cqmment period, which extended from February 26 to April 27,1999, was reasonable. Furthermore, since the proposed rule change applies to the specific aspects of licenso renewal, the Com, mission does not believe that a public hearing was warranted. As previously stated, howeverscomments received after the end of the comment period will be considered to the extent practicable.

N

\ Sincerely, William D. Travers ecutive Director for Operations N

Nx Document Name:G:\GT227-99 OFFICE RGEB,__ SC:RGEB BC:RGEB BC:RLSB D: DRIP NAME / Nrky$sw N oy CCarpenth CGrimek-${ DMadke[

DATE 5/1/99 Srj /99 5/)D/99 5/10/99 5/10/99 OFFICE OGC AD: DIP D:OSP D:NM,S,S, D;NRR NAME SBurns WKane PLohaus CPah/rfello SCollins DATE 5/ /99 5/ /99 5/ /99 i 5/ ///99 5/ /99 OFFICE EDO NAME WTravers DATE 5/ /99 OFFICIAL OFFICE COPY

( l The Honorable Jon C. Porter l Given the discrete issues covered by this proposed rule change, the Commissj'on believes that the 60-day public comment period, which extended from February 26 to Apf27,1999, was reasonable. Furthermore, since the proposed rule change applies to the ppecific aspects of license renewal, the Commission does not believe that a public hearingpas warranted. As previously stated, however, comments received after the end of the comment period will be considered to the extent practicable.

Sincerely,

/

William D/fravers Executi e Director for Operations Document Name:G:\GT227-99.

OFFICE RGEB,_ [ SC:RGEB BC:RGEB BC:RLSB D: DRIP NAME / Nrksw M oy CCarpenth CGrimek-${ DMadke[

DATE 5/"I/[9 5/1 /99 5/)D/99 , 5/10/99 5/10/99 OFFICE Ogb AD: DIP D:OSk 3 D:NMSS D:NRR NAME [ Bums WKane PLohaus[ CPaperiello SCollins DATE / 5/ /99 5/ /99 5/Ik/99 5/ /99 5/ /99 OFFICE / EDO NAME[ WTravers DAT[ 5/ /99 OFF IAL OFFICE COPY

/

r The Honorable Jon C. Porter

Given the discrete issues covered by this proposed rule ge, the Commission believes that the 60-day public comment period, which ext 3nded fr bruary 26 to April 27,1999, was reasonable. ' Furthermore, since the proposed rul nge applies to the specific aspects of license renewal, the Commission does not belie that a public hearing was warranted. As previously stated, however, comments recely after the end of the comment period will be considered to the extent practicable. /

Sincerely, William D. Travers Executive Director for Operations

/

/

v Document Name:G:\GT227-99 OFFICE RGEBn_ SC:RGEB BC:RGEB BC:RLSB D:CRIP NAME / Nrkky$sw .N oy CCarpenth CGrimeh-$[ DMa DATE 5/1/99 5/1 /99 5/1D/99 5/lD/S9 5/10/99

. OFFICE OGC AD: DIP D:OSP D:NMSS D:NRR NAME SBums WKane PLohaus CPaperiello SCollins DATE 5/ /99 5/ /99 5/ /99 5/ /99 5/ /99 OFFICE EDO NAME WTravers j DATE 5/ /99 OFFICIAL OFFICE COPY  ;

u

w a . ,. . . . .

?. ACTIOy \

/ 9 l

$f EDO Principal Correspondence Control 44 i FROMs .DUE .05/18/99 EDO CONTROL: G19990227 DOC DT: 04/27/99 h'jp/j"j

/

i

)

FINAL REPLY:

J n C. Porter.- j N3vnd2 State Senator TO 4 l

4 Chairman Jackson FOR SIGNATURE OF~: ** GRN ** CRC NO: 99-0403 L. Travers,-EDO DESC8~ ROUTING:

1 GENERIC EIS FOR' LICENSE RENEWAL OF: POWER PLANTS -- Travers REQUEST FOR PUBLIC HEARING AND' EXTENSION'FOR Knapp PUBLIC' COMMENTS Miraglia Norry Blaha Burns DATE: 05/04/99 Lohaus, SP Paperiello,NMSS ASSIGNED TO: CONTACT: Cyr, OGC NRR _  ; Collins

'SPECIAL INSTRUCTIONS OR REMA.RF.S:-

&((0l'bM: 100]kVllab%pd Y2et %ad: 96p/,MW -

  1. ACTION 9 )( & k ti e[ G L d /p iru m an d gO DUE TO NRR D' RECTOR'S OFFICE

, w' "y 8 /3 M

= .

-e

h... ,.

.. OFFICE OF THE SECRETARY CORRESPONDENCELCONTROL TICKET h ' PAPER' NUMBER:

CRC-99-0403 LOGGING DATE: Apr 29 99

. ACTION OFFICE: EDO

= AUTHOR':- JON PORTER '

-AFFILIATION: NEVADA

' ADDRESSEE: CHAIRMAN JACESON J i

[ LETTER'~DATE: Apr 27 99 FILE CODE: )

, i

SUBJECT:

EXPRESS CONCERNS OVER THE RECENT FRN COFIFYING AN J ADDENDUM TO THE " GENERIC EIS-FOR LIC RENEWAL OF

. POWER' PLANTS" ACTION: Appropriate i~ DISTRIBUTION: CHAIRMAN,.RF

.SPECIAL HANDLING: NONE l i CONSTITUENT:-

I NOTES: OCM #18189 DATE DUE:

]

SIGNATURE: . DATE SIGNED:

L -AFFILIATION:

I l-l  ?

i EDO --G19990227 j