Responds to Violations Noted in Insp Repts 50-348/86-13 & 50-364/86-13.Corrective Actions:Review Performed to Identify & Correct Drawing & Checklist Discrepancies & Procedure FNP-1-SOP-37.1 Revised
ML20209A980
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 08/21/1986
From: Mcdonald R
ALABAMA POWER CO.
To: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NT-86-0383, NT-86-383, NUDOCS 8609080143
Download: ML20209A980 (3)


Text

T b&

NT-86-0383 MsHeng Address Alabama Power Company 600 M rth 18t1 Street Post off6ce Box 2641

~

Birmingnam, Afabama 35291 Telephone 205 783-6090 B6 AUG 25 Pl?.: 3 i R. P. Mcdonald Senior Vice President Flintridge Building g3gggggp t% sout'wn wx:rc s, s:em August 21, 1986 Docket No. 50-348 Docket No. 50-364 Mr. D. M. Verrelli U. S. Nuclear Regulatory Comission Region II 101 Marietta Street, N. W.

Suite 3100 Atlanta, Georgia 30323

SUBJECT:

J. M. Farley Nuclear Plant NRC Inspection of June 11 - July 10, 1986 l

RE:

Report-Number 50-348/86-13 Report Ntmibar 50-364/86-13

Dear Mr. Verrelli:

This letter refers to the violation cited in the subject inspection reports which state:

"During the Nuclear Regulatory Comission (NRC) inspection conducted on June 11 - July 10, 1986, a violation of NRC requirements was identified. The violation involved administrative procedures in updating procedures and drawings after modifications. In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1985), the violation is listed below:

Technical Specifications 6.8.1 requires that the applicable procedures 4

recommended in Appendix A of Regulatory Guide 1.33, Revision 2, 1978, be established and implemented. Appendix A of Regulatory Guide 1.33 states that safety-related system procedures should include instructions or drawings for maintenance and operations.

Administrative Procedure (AP)-1, Review and Approval of Plant Procedures, requires reviews of procedures for current conditions and adequacy and the issuance of a temporary change notice for pen i

changes.

AP-8, Design Modification Control, requires procedures and drawings to be updated after modifications.

han 8609030143 860821 PDR ADOCK 05000348 G

PDR-l se */ 4

/

Mr. D. M. Verrelli August 21, 1986 Pap 2

. Contrary to the above:

1.

Single line drawings located in the control room were

'not revised to reflect specific changes in plant design as noted below:

f..

Unit 1 DC Distribution System drawing D-117082 shows SPACE at breaker #26 on 125 DC Distribution Panel 1D. Breaker #26 actually supplies a termination cabinet.

J b.

Unit 2 DC Distribution System drawing D-207082 shows breaker #22 on 125V DC Distribution Panel 2B supplying the Auxiliary Feed Water Pump Turbine control Panel. Breaker #22 is a spare breaker, c.

Unit 2 DC Distribution System drawing D-207083 shows breaker #21 on 125V DC Distribution Panel 2D as a spare breaker. Breaker #21 is actually supplying a termination cabinet.

2.

A temporary change notice was not issued to cover a pen change made to Unit 2 PNP-2-SOP 37.1, 125V DC Auxiliary Building Distribution System Checklist to indicate that breaker #22 on 125V DC Distribution Panel 2E is a spare i

breaker and not a space.

l 3.

We system checklist in INP-1-SOP 37,125V DC Auxiliary Building Distribution System, did not include the Unit i

1 DC breaker LB-15, a supply to a security inverter.

{

his is a Severity Level IV Violation (Supplement 1)."

Admission or Denial he above violation occurred as described in the subject report.

Reason for Violation i

I 1.

he first part of the violation was caused by personnel error in that design support personnel failed to update i

single line drawings following plant modifications.

2.

We second part of the violation was caused by l

personnel error in that personnel failed to comply with l

FNP-O-AP-1 for procedure change.

i j

3.

The third part of the violation was also caused by i

personnel error in that personnel failed to update the procedure following modifications.

4 i

i r-

  • y-,

r


r-,--

e

_-----m m - - --w,e-- - - - - - - -~ -

p g

,w-=

, wr e-ww c-we-------

,w--ewww w v-y%

--ew-o--

--'v-----wew+---

e-*

Mr. D. M. Verrelli August 21, 1986 Page 3 Corrective Action Taken and Results Achieved 1.

A review is being performed on all 125V DC and 120V AC single line drawings and comparing them to the appropriate connection drawings to identify and correct discrepancies.

2.

Pen changes to SOP checklists are being reviewed to ensure that they are in accordance with established administrative procedures. Changes will be made to procedures to correct discrepancies.

3.

FNP-1-SOP-37.1, 125V DC Auxiliary Building Distribution System Checklist has been revised to include breaker LB-15.

Corrective Steps Taken to Avoid Further Violations 1.

Alabama Power Company has communicated to Bechtel designers the need to ensure that single line drawings are considered and updated following design changes.

2.

This event will be reviewed with Operations personnel involved in performing and reviewing SOP Checklists.

3.

The failure to incorporate LB-15 into the system checklist as a result of the design changes occurred in 1978. Since 1978 FNP-O-AP-8 has been revised to include more formal means to ensure proper procedural changes are made following design changes.

Date of Full Compliance February _i, 1987 Affirmation I affirm that this response is true and complete to the best of my knowledge, information, and belief. The information contained in this letter is not considered to be i

of a proprietary nature.

l l

Yours very t ly, R. P. Mcdonald j

RPM:emb