ML20207T673
| ML20207T673 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 01/09/1987 |
| From: | Rice P GEORGIA POWER CO. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| GN-1296, IEB-86-002, IEB-86-2, NUDOCS 8703240235 | |
| Download: ML20207T673 (2) | |
Text
.
I
' Georgia Power Company Y
'4 Post Othee Box 282 Waynestora Georg a 30830
' Telephone 404 554 9961, Ext 3360 404 724 8114. Ext. 3360 o 7 J AN 20 P 3
- O '3 " P
- f I
' P. D. Rice Vce Pres: cent F" " " *'" E' d"'~ "'"
Vogtie Project January 9, 1987 United States Nuclear Regulatory Consnission Region II
Reference:
Suite 2900 RII: JNG:
101 Marietta Street, Northwest 50-424 Atlanta, Georgia 30323 50-425 File: X7BC24 Log:
GN-1296 Attention:
Mr. J. Nelson Grace The following information is submitted further to our letter of October 15, 1986 (File: X7BC24, Log:
GN-1123), in response to USNRC I & E Bulletin 86-02, " Static
'O' Ring Differential Pressure Switches."
Per the request of USNRC Region II, Georgia Power Company wishes to clarify our earlier response. As indicated in our response to FSAR question 260.63 Georgia Power Company considers the terms " safety-related" and "important to safety" to be synonymous.
The only Static "0" Ring model 102 4
or 103 differential pressure switches in use at the Vogtle Electric Generat-ing Plant are in non-safety-related applications.
Their failure under pos-tulated environmental conditions would not affect the ability of safety-related equipment to perform safety-related functions.
There fore, these switches do not come within the definition of 10 CFR 50.49(b).
This response contains no proprietary information and may be placed in the NRC Public Document Room.
Yours truly, I
P. D. Rice l
CWH/PDR/jl l
xc:
U. S. Nuclear Regulatory Commission 1
Document Control Desk Washington, D. C. 20555 H. G. Baker J. A. Bailey L. T. Gucwa l
J. P. O'Reilly D. R. Altman C. W. Hayes G. F. Head G.
Bockhold G. A. McCarley R. E. Conway J. F. D'Amico R. W. McManus R. H. Pinson W. D. Drinkard Sr. Resident (NRC)
- 8. M. Guthrie C. C. Garrett (OPC)
J. E. Joiner (TSLA)
R. A. Thomas D.
Feig(GANE)
NORMS l
8703240235 870109
[DR ADOCK 05000424 3 f0 W
PDR N
p LEH
.o.
.v Page 2 USNRC GN-1296 1
P. D. Rice states that he is the Vice President, Vogtle Project Engineering and is authorized to execute this oath on behalf of Georgia Power Company and that to the best of his. knowledge and belief the facts set forth in this letter are true.
GPC:
Sworn to and subscribed before me this 9
of January, 1987.
n>>>$ YO Gewel Lewis, Notary Public Georgia State at Large My Commission Expires 1/17/89 4