Monthly Operating Repts for Feb 1987
ML20207T347
Person / Time
Site: Calvert Cliffs  
Issue date: 02/28/1987
From: Behnke C, Lemons J
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 8703230464
Download: ML20207T347 (9)


Text

,, [

'{ y OPERATING DATA REPORT'

.cocce***********************************************************************

Docket-No. 50-317 March 7,1987 Prepared by C. Behnke Tel. (301) 260-4871

-1. UNIT NAME Calvert Cliffs Unit 1

2. REPORTING PERIOD February 1987

'3.

LICENSED THERMAL POWER (MNT) 2700

.4. NAMEPLATE RATING (GROSS MWe) 918

5. DESIGN ELECTRICAL RATING (NET MWe) 845 6.. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) 860
7. MAXIMUM DEPENDABLE CAPACITY (NET MWe) 825

, 8. CHANGE IN CAPACITY RATINGS none

9. POWER LEVEL TO WHICH RESTRICTED n/a
10. REASONS FOR RESTRICTIONS n/a Cumulative This Month Year to Data to Date
11. HOURS IN REPORTING PERIOD 672 1,416 103,549
12. NUMBER OF H0!JRS REACTOR WAS CRITICAL 658.4 1,292.1 81,099.8
13. REACTOR RESEaVE SHUTDOWN HOURS 0.0 0.0 3,019.4
14. HOURS GENERATOR ON LINE 638.9 1,007.9 79,223.8
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0 16.: GROSS THERMAL ENERGY GENERATED (MWH) 1,687,286 2,585,563 198,115,958
17. GROSS ELECTRICAL ENERGY GEN'TED(MWH)

~ 571,974 873,166 65,563,159

18. NET ELECTRICAL ENERGY GENERATED (MWH) 547,644 824,866 62,571,964
19. UNIT SERVICE FACTOR 95.1 71.2 76.5
20. UNIT AVAILABILITY FACTOR 95.1 71.2 76.5
21. UNIT CAPACITY ~ FACTOR (USING MDC NET) 98.8 70.6 73.5
22. UNIT CAPACITY FACTOR (USING DER NET) 96.4 68.9 71.5
23. UNIT FORCED OUTAGE RATE 3.0 3.0 8.5
24. SHUTDOWNS SCHI:DULED OVER THE NEXT SIX MONTHS'(TYPE, DATE AND DURATION):

None s'

)

k 0703230464 070

(\\{

DR ADOCK 050 7

AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-317 Calvert Cliffs Unit No. 1 Date: March 7,1987 Completed by C. Behnke Telephone: (301) 260-4871 FEBRUARY Average Daily Power Level Average Daily Power Level Day (MWe-Net)

Day (MWe-Net) 1.0 48.7 17.0 876.6 2.0 847.8 18.0 861.1 3.0 871.5 19.0 842.2 4.0 871.8 20.0 872.9 5.0 871.6 21.0 872.6 6.0 873.3 22.0 872.4 7.0 790.7 23.0 874.5 8.0 199.8 24.0 875.0 9.0 869.3 25.0 874.2 10.0 872.1 26.0 873.9 11.0 874.0 27.0 872.0 12.0 877.2 28.0 875.4 13.0 877.3 14.0 876.6 15.0 877.4 16.0 876.9

l l

IINIT SINTI1N1WNS AND I4RW3C REINKXIDNS INICKET Nil. 50-317 IINIT MAPG? _CALVERT CLIFFS U-1 DAll'. March 9, 1987 CHpW'IRI13 IW C. Behnke RElYlRT PEMff11 February 1V.I.EI1NINI' (301) 260-4871 ro f

O O

C-e o be o C

1 o{

g C.g I.icensee

{

g'Q C;its e & Correriive y

h yg y

Jyy I;sesst.

y, y

%s.

Datc

~J k~t iens t o

s. 3 g

gy Reiwn i. #

g.3 H

u l'revent Reenrivnce 5

<. us.s u

8 i

l 87-03 870201 F

19.5 G

4 87-04 HA GENERA Trip due to Stator Cooling Runback during H2 Purifying operation:

1.

change procedure 2.

setpoint change review 3.

review with operators.

87-04 870207 S

13.6 B

N/A N/A HB VALV0P

. Outage to replace 0-ring leaking EHC fluid on #3 Turbine Intercept valve.

l 1

i l

l I

I 3

l':

l'oireil Reaseni:

H iluwl:

I:xliilait. G Inst rinct.iewis S: Selw ehileil A-lipiigwnent l'ailtier (Explain) 1 -M;uu ta l f or l'orpai at.insi of Dat.a D-Maint enance or Test, 2-M unsal Scrani.

I:nt ry Slurt s for I.iresise l

C-Refueling 3-Ant ownat.ic Scram.

Evesit. Regwirt. (I.I.R) File D-RegnIat ory Rest.rietioen 4-0t Iw r- (I:xplaiii)

( NURI U-016I )

E-Ogx rat or Training & l.irense Examinat.ior F-klminist rat.ive 5 E 'I ' I I ' I ' ' I -

8"""' 8"' " *"

G-Ogw rat.ional I; raver (Explain)

II-Ot lier (Explain)

~

OPERATING DATA REPORT COC*************************************************************************

Docket No. 50-318 March 7, 1987 Prepared by C._Behnke Tel. (301) 260-4871

.c

1. UNIT NAME Calvert Cliffs Unit 2'
2. REPORTING PERIOD February 1987 3.- LICENSED THERMAL POWER (MWT) 2700 i
4. NAMEPLATE RATING (GROSS MWe) 918
5. DESIGN ELECTRICAL RATING (NET MWe) 845
6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) 860 i

t

7. MAXIMUM DEPENDABLE CAPACITY (NET MWe) 825
8. CHANGE IN CAPACITY RATINGS none e
9. POWER LEVEL TO WHICH RESTRICTED n/a l
10. REASONS FOR RESTRICTIONS n/a Cumulative This month Year to Date to Date i
11. HOURS IN REPORTING PERIOD 672 1,416 86,904
12. NUMBER OF HOURS REACTOR WAS CRITICAL 672.0 1,416.0 73,402.0
13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1,296.6
14. HOURS GENERATOR ON LINE 672.0 1,416.0 72,236.0 4
15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0

'0. 0

16. GROSS THERMAL ENERGY GENERATED (MWH) 1,783,442 3,762,266 182,079,121 i
17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 605,290 1,272,866 60,110,378
18. NET ELECTRICAL ENERGY GEN'TED(MWH) 581,170 1,221,865 57,378,788
19. UNIT SERVICE FACTOR 100.0

'100.0 83.1 4

20. UNIT AVAILABILITY FACTOR 100.0 100.0 83.1
21. UNIT CAPACITY FACTOR (USING MDC NET) 104.8 104.6 80.0
22. UNIT CAPACITY FACTOR (USING DER NET) 102.3 102.1 78.1 23.-UNIT FORCED OUTAGE RATE 0.0 0.0 5.8

{

24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):

j Refueling Shutdown:

March 14, 1987 to May 13, 1987 (61 days) 1 i

25. IF UNIT IS SHUTDOWN AT END OF REPORT PERIOD, ANTICIPATED DATE OF STARTUP j

March 1, 1987 i

}

l b

1 i

a m

- ~ - - - - * - -.,, w w w w-w.

.__ww-,mm_..

e..

-,e e

.- y

\\

3.,.~

< ! ;, r

..t 1

u g

,/

fi

/

[.

j.

'1 q{p i, s.;-

  • R:

s A

AVERAGE DAILY UNIT POWER LEVEL b d.

's.

f i

. l

[/

(2 'L i

Docket No. 50-318."i.

p /-

Calvert Cliffe UnicMo. 2

  1. 4./

Date ' March 7, 1987 Completed by C. Behnke r

s Telephones (301)'260-4871

.j f

FEBRUARY x;

c:

4 Average Daily Power Level Average Daily Powef Level Day-(MWe-Net)

Day (MWe-bet).

j

.____________._______________________________________________._______________.J.4 1

868.3 17 870.8 t-

/.!

?

2 872.2 18 871.3 -

-e t.

n; 87[.3i 3

872.3 19 t

'- /

[

4 874'.4 20 868.9,'

1

^

5 872.8 21 865.7

/

/

6 873.4 22 862.4 i

7 874.3 23 856.9 8

873.6 24 849.5 9

871.4 25 844.0 10 871.6 26 840.0 4

!. j 11 871.3 27 834.3 a

12 871.1 28 820.7 l

13 871.3 14 871.3 15 871.9 16 870.8 i

i i

.___......m.,,,.c

>m

-.1,,-

^

_t x -

s m>.>

- ~

^

~

v.

.ml IJNIT SRmMC AND FUWIR RI'lltX'TIONS I1OCKET_.JWe. D O-31[

~dD[

L'1

' UNIT MAPG'.

CALVERT' CIFFS U-2' N qe 4-DATE March 9, 1987 -

~..

'O Mt.FTED BY C. Behnke 1

REI'URT PEWill February

'IT.I.EI'ININE (301) 260-4871 r")

C.

C O

a c-es O te O C

oe

=

co I.iresisce

.E L'c l '. in i st - & Costwrtive Q

~< t.

O

~ % -*4 d

. L ~t O

I' t nf

'u O

t Ar t is sin i t o

%).

D.nl e*

C.

o :3 M

'O4 b N

cO d

.c a !<

ft C

l M

L. "O 0

u3 Regun l. #

>> C U

l'evve nt Hertir:11H c wU o

a.t.c c oc e

!> J 5 O

Q O

87-02 870228 F

0.0 A

3 87-02 CH INSTRU Trip on low S/G water level due'to failure of dynamic compensator (lead / lag unit) for 21.FRV cont-roller (FIC 1111): 1. Replaced lead /

lag unit, 1

I I

'3 4

F:

Forecci Reason:

M llHwl:

INIlil8il U-Instt18C'i"'IS

'l S: Selw <lu t eil A-Dynigmw?nt, Failure (Explain) 141antial for l'reparat. ion of' Dat a

.l 11-Maint enance or Test, 241ainial Scram.

I:nt.ry Slu ets for I.irense C-Refueling 3-Ant emiat.ie scram.

I:vi nt, Reixn t. (II:R) l'ile D-Regniat ory Restrict, ion 4-01 lien- (ExplainI

( NURI X;.0161 ).

E-Ogxraton Training & I,irense INaminat. inn l

F-Acimin i st. rat,i ve 5 Extilisit. I - Simwr Soinre -

G-Operat.innal Error (I.,xpla.in) 11-0t lier (Explain)

-. =.

'A

~

' [

~

^~

g7 7

g g'p'*

i v;

y 3

).

x 8

y f,

~

) l{

vi March 3,'1987 t L

f RSFUELING INFORMATION REQUEST e

..i h, 7., ' y )

f 4

I 1.

Name of Facility's Calvert Cliffs Nuclear Power Plant, Unit No.' 1

? i' 2.

Scheduled date for next Refueling Shutdown: March 26,1988 r

~

3.

Scheduled date for restart following refueling: May 12,1983 4.

Will refueling or resumption of operation thereafter require a technical specification E

change or other license amendment?

Resumptiod.of operation after refueling will not require changes to Technical Specifications.

i 5.

Scheduled date(s) for submh ting proposed licensing action and supporting information.

t February 5,1988.

i i 6.

Important licensing considerations associated with the refueling.

L.

. Reload. fuel will be similar to that reload fuel inserted into Calvert Cliffs Unit 2.

eighth cycle.

7.

The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.

,. 1 (a) 217 (b) 1050 Spent Fuel Pooh are common to Units 1 and 2 g

8.

(a) The present licensed spent fuel pool storage capacity, and (b) the size _of any x

increase in licer. sed storage capacity that has been requested or is planned, in number.

. [

of fuel asremblies.

(a) 1830 (b)0

- 9.

The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.

~ April,1991 9

f 4

i o

i

/,,,.

.,. ~,,.,,,...

..Em.

-,,--s.,_

, ~, - - -..

,-r-

-c----

=---

-ee

[ o; :'

r gX March 3,1987 REFUELING INFORMATION REOUEST

~ 1. ~ Name of Facility:.. Calvert Cliffs Nuclear Power Plant, Unit No. 2..

L 2.'. Scheduled date for next refueling shutdown: March 14,1987.

  • 3. Scheduled date for restart following refueling: May 13,1987.

4.' Will refueling or resumption of operation thereafter require a technical specification; change or other licensed amendment?

Resumption of operation after refueling will require changes to Technical

, Specifications. The changes will be such as to allow operation of the plant with a.

- fresh reload batch and reshuffled core.

5. Scheduled date(s) for submitting proposed licensing action and supporting information.

February 13,1987

6. 'Important licensing considerations associated with refueling.

Reload fuel will be similar to that reload fuelinserted in the previous cycle.

7. The number of fuel assemblies (a) in the core and (b) in the Spent Fuel Storage Pool.-

<-1 (a)' 217 (b) 1050 Spent Fuel Pool is common to Units I and 2.

8. (a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been required or is planned, in number of fuel assemblies.

(a) 1830 I

(b)0

9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off F

load.

April,1991

  • Changed since last report.

1-4 p,

id 1

4.,

] Y'

,e BALTIMORE GAS AND ELECTRIC CHARLES CENTER + P. O. BOX 1475. BALTIMORE, MARYLAND 21203 JAnaEs R. LEh00Ns uANaoen NUCLEAR OrtnArsoNe OgmuernstNT March 9, 1987 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20055 Attention:

Document Control Desk

Subject:

February Operating Data Reports for Calvert Cliffs Units 1 and 2 (Dockets 50-317 and 50-318)

Gentlemen:

The subject reports are being sent to you as required by Technical Specification 6.9.1.6.

If there are any questions, please contact Carl Behnke, (301) 260-4871.

Sincerely, 1.f so w s W J

R.

Lemons Manager-Nuclear Operations Department JRL/CB/tyk Enclosures cc:

M. Beebe (NRC)

V. P. O'Grady (BG&E)

E. K. Bowley (BG&E)

D. Reilly (INPO)

T. Foley (NRC)

P. Ross (NRC)

K. Gibbard (DOE)

J. A. Tiernan (BG&E)

S. A. McNeil (NRC)

E. Wenzinger (NRC)

W. J. Lippold (BG&E)

Technical Librarian T. Magette (DNR)

File K. Gromack (CE)

Ih f6d

-.