ML20207T127
| ML20207T127 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 12/08/1986 |
| From: | Corder A AFFILIATION NOT ASSIGNED |
| To: | Zech L NRC COMMISSION (OCM) |
| Shared Package | |
| ML20207B356 | List: |
| References | |
| FOIA-86-885 NUDOCS 8703230227 | |
| Download: ML20207T127 (3) | |
Text
[
.[wisee6 07:31 NRC-M&ti-ftBB W.005 003
&a a 7} o ~ A gL l December 8, 1986 M
Nr. Iando Zeok, Chaiman Nuclear Regulatory Commission Washington, D. C.
30555 subject:
South Texas Nuclear Power Plant Copies:
Distribution (attached)
Dear Mr. Zack,
I feel it is my duty to inform you that since I reapended to your Regional Cffice agent's interview l
on November 6,1986, my two (2) inspection trips with two (2) of your site operational agents on Nov-ember 7th 412th 1986, and having contacted your Region IV Complakuts Coordinator on November 7,1986
--- I have heard nothing from those agents, I en extemely concerned that no corrective action t
I has been initiated concernin6 the design and install-stion defenoies.
The " Hot Functional Test ( s)" sched-ule needs to incorporate all known defenoies and the work completed before the test (s) are conducted.
Furthermore, an engineer who has identified some of his concerns on plant documentation / installation, called me and told me that your agent, Mr. Donald D.
Driakill has told him that my concerns were ' cosmetic".
Is is a practice of your agents to give his opinions to others before a report is given to one who has given a sworn deposition to the Government?
Addi itionally, I was promised a copy of my deposition by atr. Driskill on November 6,1986 -
I.have not receiv-l od it.
Neither have I received any telephone calla or reports on my inspection trips with your agents or Complainta Coordinator.
kg32pg7870329 l
l k
0
~>'
s a
R..
'3249<86 07:32 tRC-Pi&ti-t1NBB NO.005 004
.~
In addition to making two (2) separate inspection trips with the Houston Light & Power Company's site Safeteam Management, an inspection trip with a Bechtel Corporation Vice-President, Project ranager, Assistant Site Project Engineer, and Lead Retrofit Design Engin-eer -. I have had no informational response that-so.
over.
Nor have I received an answer to my second letter to the President of the Bechtel Group of Companies.
I am talking about a nuclear power plant that is required to demonstrate systems that are installed cor-rootly prior to receiving nuclear fuel on site.
Because of no response from your agency, and in order to identify the problems at the South Texas Nuolour Power Plant. I have met with the State of Texas office of Public Utility Counsel, the fim of Fulbright.
Jaworski, and the Austin, Texas American Statesmen news-paper.
Also, I have been in contact with the Government Accountability Project in Washington, D. C..
Next. I have an appointment with another state of Texas Public Utility represonative, Senator I,loyd Bentsen of Texas has been prompt in reporting to me of your need to keep him informed'..
My employer, Bechtel, has terminated my employment since I first contacted you, and therfore I have no direct way of being informed if any coreotive action is being implemented on the defenoies at the plant.
Under these serious circumstances pursuant to the configuration of the plant systems, I sincerely recommend that you consider issuing a stop Work Ozter to the project.
My telephene number is Please feel free to call me at any tim.
Very truly
- urs,
^
s W
John A. Corder J~T_
n,,,__.,,.p..
- - - -.. ~
2
}12/19/86 07:32 HRC-M&ti-t1 NEB NO.005 005 Distribution:
(Corder to Zack letter 12/8/86)
Senator Lloyd Bentsen
- United States Senate Washington, D. C.
80510
.., [
(f Chairman Rosson Publie Utility Commission of Tozas 7800 Shoal Creek Boulevard suite 400N Austin, Texas 78757 Billie P. Ge14e Citizen's Clinio Direc*,or Goverstent Accountability Project 1901 Que Street, N. W.
Washington, D. C.
20009 Jeff Wolff, Attorney Fultr18ht - Jaworski M Bank Building Houston, Texas 77002 John Harris, Reporter Austin American statesnien Austin, Texas 78710 Geoffrey Gay, Attorney Office of Public Utility Counsel for the State of Texas Westpark III, suite 120 (8140 Mopeo)
~
.