Application for Amend to License SNM-1168,authorizing Listed Exemptions for 870615-0831 Shutdown,Including Retraining of Radiation Workers & Monthly Audit of Plant Status Re Nuclear Radiological Safety.Fee Paid
ML20207T056
Person / Time
Site: 07001201
Issue date: 03/06/1987
From: Watters J
BABCOCK & WILCOX CO.
To: Crow W
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
27965, NUDOCS 8703230134
Download: ML20207T056 (5)


Text

_ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ -

RETURN TU 393-55 W 28/

s.bc.ek h

.,=.::::L a McDer any % 4ETED P.O. Box 11646 US g

\\\\

Lynchburg, VA 24506 1646 (804) 522 6000 9

W1619gO

-12 March 6, 1987 C

T n'%

e lElg,Q e

RECEIVED t.a 3

Q United S;ates Nucle egulatory Commission MAR 161987 )-

Attn:

Mr. W. T. Crow, Acting Chief

9. u.Amina etcuurony 'l Uranium Fuel Licensing Branch

,toMMrsnog s

Division of Fuel-Cycle and Material Safety ME d

9 9

Washington, D. C.

20555 A

(A

REFERENCES:

(1)

SNM-ll68, Docket 70-1201 (2)

Letter from J. T. Ford to R. G. Page dated 1/28/83 (3)

Letter from J. T. Ford to R. G. Page dated 2/22/83 Gentlemen As you are aware, the Babcock & Wilcox Company, Commercial Nuclear Fuel Plant will shut down fuel fabrication activities this summer from June 15 through August 31 inclusive.

During the shutdown period, we plan to do no fabrication work or movement of SNM, except that fuel assemblies may be shipped to customer sites or received at the CNFP.

The fuel assembly shipments and receipts will be handled in accord with our license.

In addition, we will continue to perform maintenance on our EClio-330 system during the shutdown period.

There will be non-SNM work continuing in plant during the shutdown period, and as such there will be a crew of authorized B&W employees present (including management and necessary llealth-Safety personnel) during normal working hours.

Since the plant status with regard to SNM will be that of a storage facility, we request approval of the license exemptions and modifications listed in Attachment I to this letter, for the shutdown period.

We have kept the ECI!O-330 controls and requirements intact (Section V, Pages 67-75) due to its operational status during the shutdown period.

In the unforeseen event that it should become necessary to initiate activities including SNM (other than fuel assembly shipments or receipts), we will send a written notification of renewed licensed activity to the NRC Uranium Fuel Licensing Branch and to NRC Region II prior to, or within one working day of the start of the activity.

The notification shall include the start date of the activity, anticipated duration of the activity, and the type of activity.

A cleanup and survey will be performed and recorded after each such activity, with records maintained for subsequent NRC inspection.

ni Ap plica nt.............. * * * *

  • 0703230134 070306 Check d o. /?9.7, )./.9........ -

PDR ADOCK 07001201 At.w avTca Ct

. l W~.

C PDR 5

W '

% D.D W X.'.'.'.

C

?

MM=

79//I a

N

k o

United States Nuclear Regulatory Commission Page 2 March 6, 1987 If such activity during the shutdown period should become necessary, all quarterly license commitments, which would normally fall in the shutdown period, all monthly license commitments for that or each month, all weekly license commitments for that or each" week, and all daily commitments for that or each day during which the activity takes place shall be performed.

s These changes are virtually the same as that requested for the June 18, 1983 to October 16, 1983 shutdown (see References 2 and 3 noted above) including the clarification of intent paragraphs included with the 2/22/83 letter (Reference 3).

If questicns arise during your review, please feel free to call me at (804) 522-6202.

A check for $150.00 is included with this letter to cover the administrative licensing fee.

Thank you for your prompt attention to this request.

Sincerely, BABCOCK & WILCOX COMPANY COMMERCIAL NUCLEAR FUEL PLANT b.G. W$%

J. P. Watters License & Control Administrator JPW:cmr Attachments t

i

a

((

\\

o BABCOCK & WILCOX COMMERCIAL NUCLEAR FUEL PLANT SNM-116 8, March' 6, 1987 ATTACHMENT I We request a license condition approving the following license exemptions

  • and modifications ** for the shutdown period of June to August.

SNM-1168 Section V Part 6.2 The calendar year 1987 retraining of radiation workers

  • shall be conducted when the workers return to work after the end of the shutdown period.

6.6 Regulatory Control personnel shall conduct, at least **

week 4y/ monthly, a formal audit of plant status relative to nuclear and radiological safety, except during plant shutdown of a week or longer.

8.1.1 (A)

Differential pressure shall be checked weekly / quarterly and filters replaced when damage is evident, or when the differential pressure exceeds 4 inches of water.

8.1.1 (B)

Gaseous effluents shall be representatively sampled **

on a continuous basis, and when the facilities are in operational status, the samples shall be collected daily / weekly and counted after allowing for decay of radon and its daughters.

8.2.2 Exemption from performing weekly measurement of glovebox negative pressure, hood face velocities, and elephant trunk velocities.

8.2.3 Exemption from collecting daily samples at work stations and periodic lapel samples.

fmm J' '

p

~g.-

s

~ BABCOCK.y WILCOX_

~

COMMERCIAL 1 NUCLEAR FUEL PMNT.

_ SNM-1168,iMarch 6,:1987 SNM-ll68 Section V Part 8.~4.5 Survey n:

Area Action Level Frequency

1. Controlled Removable:

5,000 DPM/100 cm "rrhly/

pelle'.

Tot'al 50,000 DPM/ 50 cm ' monthly fabrication /

rod loading change room (hot area)

2. Change Room Removable:

500 DPM/100 cm des 4y/

2 (Inter-Total 2,000 DPM/ 50 cm weekly mediate)

3. Clean Removable:

200 DPM/100 cm men 6hly/

    • ~

(Remainder Total 500 DPM/ 50 cm not done of plant and office area) 8.7.5

. Tours shall be made according to our Security Plan.

SNM-ll68 Section VI Need:

The CNFP Emergency Response Orgald zation shall remain intact during the planned shutdow.-

However, the Emergency Team may need to be supplemented by NNFD and/or LRC Emergency Team personnel.

The supplemental Emergency Team personne1~shall receive CNFP specific training before becoming a member of the CNFP Emergency Team.

Request:

lWe request approval of our plan to utilize NNFD and/or LRC Emergency Team personnel to supplement the CNFP Emergency Team during this shutdown period.

>