7590-01 UNITED STATES NUCLEAR REGULATORY COMMISSICN TOLEDO FDISON COMPANY
'AND THE CLEVELAND ELECTRIC ILLUMINATING COMPANY DAVIS-PESSE NUCLEAR POWER STATION, UNIT NO. 1 DOCKET NO. 50-3d6 4
NOTICE OF DENIAL OF AMENDMENT TO FACILITY OPERATING LICENSE AND OPPORTUNITY FOR HEARING The U.S. Nuclear Pegulatory Comission (the Comission) has denied in part a request by the Toledo Edison Company for an amendment to Facility Operating License No. NPF-3, issued to Toledo Edison Company and The Cleveland E1.ectric 111 urinating Company (the licensees), for operation of the Davis-Besse Nuclear Power Station Unit No.1, located in Ottawa County, Ohio.
~
Notice of consideration of issuance of this amendment was published in the FEDERAL REGISTER on December 4, 1985 (50 FR 49793).
The proposed amendment, in part, would require verification that diesel I
generators can be synchronized (but not actually electrically connected) to offsite power during surveillance testing rather than the verification of diesel generator synchronization to offsite power and loadina to at least
(
Toledo Edison Company did l
1000 kw and operation for at least 60 minutes.
not present a substantial technical argument for this revision which does not meet the objective of the original testing to demonstrate the capability l
of the diesel to assume its designed load. Therefore, the Commission has l
detemined that this TS revision should not be granted.
l l
8703200068 8703lB PDR ADOCK 05000 46 P
7590-01
. ~
~
All other provisions of the amendment request have been approved by Amendment No. 97 dated February 10, 1987. Notice of Issuance of Amendment No.
97 will be published in the Commission's biweekly FEDERAL PEGISTER notice.
Toledo Edison Company was notified of the Ccmmission's denial of the proposed TS change by letter dated February 10, 1987.
By March 19, 1987, the licensees may demand a hearing with respect to the denial described above and any person whose interest may be affected by this proceeding may file a written petition for leave to intervene.
A request for hearino or petition for leave to intervene must be filad with the Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, D.C. 20555, Attention: Docketing and Service Branch, or may be delivered to the Commission's Public Document Room, 1717 H Street, N.W.,
Washington, D.C., by the above date.
A copy of any petitions should also be sent to the Office of the General Counsel /Bethesda, U.S. Nuclear Pegulatory Commission, Washington, D.C. 20555, and to Gerald Charnoff, Esq., Shaw, Pittman, Potts and Trowbridge, 2300 N Street, N.W., Washington, D.C. 20037, attorney for the licensees.
For further details with respect to this action, see (1) the application for amendment dated May 28,1985,(2) the Commission s letter to Toledo Edison Company dated February 10, 1987, and (3) the Commission's Safety Evaluation issued with Amendment No. 97 to NPF-3 dated February 10, 1987, which are available for
- ^.,
~
7500-01
_3 public inspection at the Commission's Public Document Room, 1717 H Street, N.W.,
Washington, D.C., and at the University of Toledo Library, Documen,ts Department, 2801 Bancroft Avenue, Toledo, Ohio. A copy of items (?) and (3) may be obtained upon request addressed to the U.S. Nuclear Regulatory Commission, k'ashington, D.C. 20555, Attention: Director, Division of PFP Licensing-B.
Dated at Bethesda, Marylard, this 10th day of February,1987.
FOR THE NUCLEAR REGULATORY COMPISSION n
'/)
\\
(WRSro,iectDirectorate#6,)
J hn F. Stolz, Director Di gsion of PWR Licensing-B i