4 4
- 1. CONTRACT 40 CODE WE OF NES AfilENOMENT OF SOUCITATIONMODIFICATION OF CONTRACT a
1 [2
- 5. AmeE.wdENT/meODIFIC AT 60N MO.
- 8. EFFECTIVE DATE
- 4. REQUISITION /PuRC 9ABE REG. NO.
S.PROJEC T NO. #f appaareMrs
'No M R I 7 1937 RES-85-124 dtd 10/30/87 4 '55"E O e v
- 7. Apu1NIStEREo ev atesher shen seem ss CODE U.S. Nuclear Regulatory Conunission Division of Contracts Washington, DC 20555 i
I
- d. N AME AND ADDRESS OF CONT R ACT OR (No., streei, county, Semte end 14P code) y)
SA. AMENDMENT OF SOLICIT ATION MO.
Scientech, Inc.
P.O. Box 1406
- e DATEO tsss srsm ssi Idaho Falls, ID 83403-1406 10A. MOOlF ICATION OF CONT R ACT/ORDEA NO.
NRC-04-85-124 y
sob. oATEo tsEE sisu 22)
CODE l FACILITY CODE 9/30/85
- 11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS The atme numbered solicitation is amended as set forth in IWm t4. The hour end dote specified for tocsipt of Offer is enwnded, is not ex-anded.
Otters must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or es amended, by one of the following methods le) By completing items B and t5.and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the otfer submitted; or Ic) By seperate letter or teleg'e'n which includes a refe'ence to the sohcitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG.
MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESJLT IN hEJECTION OF YOUR OFFER. If by virtue of this amendment you desire tochange en offer already wbmitted,such change may be made by Wiegre" lor
(
EtWr, provided each telegram or lette' makes reference to the soficitation and this amendment, and is receised prior to the opening hour and date specified
- 12. ACCOUNTING AND APPROPRIATION DATA (if required)
- 13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS / ORDERS, i
IT MODIFIESTHE CONTRACT / ORDER NO. AS DESCRIBED IN ITEM 14 y)
A.
HAN E ORDE 5
PUR$UANT TO: (Specify authority) THE CHANGES SET FORTH IN STEM 14 ARE MADE IN THE CON-
- 3. THE ABOVE NUMBER,ED CONTR ACT/ ORDER 15 MODIFIED TO REFLECT THE ADMINISTR ATIVE CHANGES (such as chansen in paying ofoce, approprietion date, etc. SET FORTH $N ITEM 14,PUR$UANT TO THE AUTHORITY OF F AR 43.103(b).
C. THIS SUPPLEMENT AL AGREEMENT IS ENTERED INTO PUR5UANT TO AUTHORITY OFs X
The changes clause under the contract and the contractor's proposal dated 2/23/87.
O. OTHER (specify type of modstscetton and authornty)
E. IMPORTANT: Contractor b is not, is required to sign this document and return Copies to the issuing of fice.
- 14. DLSCRIPTSON OF AMENOMENT/MOOsF ICATSON LOrganised b) UCF eretson heedings, nneludsnt solscitatnantcontract eutdect matter avhere (eenible.)
(SEE PAGE 2 0F MODIFICATION) 8703190536 870317 i
% oq g.-124 C0 PDR W
ts provioed herein, att terms and conditions of the document referenced in item 9A or SOA, as heretofore changed, remains unchanged and in f ull forte 1SA. NAME AND T 8T LE OF SIGNER (Type orprint) 16A. N AME AND TIT LE OF CONT R ACTING OF FICER (rype orpnnt)
ElOis J. Wiggins
!$s. CON T R AC T O R/OF F E RO R A SC. DATE SIGN ED 16 8. UNIT STATE 5 0F A E RIC A 16C.DATE 5tGNED
'0 5,~.r>
y,717 eY
. n.t.,e., -,..n.. 4.r.d t. o.,
, -,-.,c.,.
- n. 0 NSN 754o-ol.152 807o 30-105 STANDARD FORM 30 (REv.10-43)
PREt'qvnFr.R.h FMm&LW3tBE
~ "
CONTRACT Wo. MRC-04-85-124 M6dific: tion No. 2 3
Page 2 of 2 The purpose of this modification is to halt activity on Task 1 cnd Task 2 and replace these two tasks with Task 5, Task 6, and Task 7 at no additional cost to the Government in accordance with the Changes clause.under the contract and Scientech*s letter dated February 23, 1987.
Accordingly, the following changes are hereby niade:
1.
Incorporate Scientech's letter of Fet,ruary 23, 1987.
2.
The f ollowing changes are hereby made pursuant to the Changes clause under the contract.
a.
Drop the following tasks:
Task 1 - RESAR-3S NPDB Input Development Task 2 - B&W Lower Loop Plant Blank Forms Input Development b.
Start the following tasks:
(copy of tasks attached)
Task 5 - NPDB Blank Forms Manual Task 6 - NPDB Independent Sof tware Module (s) Testing Task 7 - NPDB Document Support All other terms and conditions of this contract remain unchanged, including the total amount of the contract which is $251,000.00.
4 4
i l
J f
4
~
TAKK 5:
Minimum Data Set Documentation.
This Phase 11 SBIR task will be to prepare a niiclear plant data blank forms manual.
l The content of this manual will be plant data entry forms
' required for the input of data into the Plant Data Entry System developed in Task 3.
The scope of the data will be that required for performing small break loss of coolant accident (SBLOCA) analysis.
The specific data items contained in these i
data entry forms will be defined by Los Alamos National Laboratories (LANL) under Task 2 of their NRC Nuclear Plant Data Bank (NPDB) Development contract.
The forms will' be designed such that they may be used by an engineer with a knowledge of plant components and systems.
This engineer need not have computer language knowledge nor knowledge of the analyticial codes such as TRAC, RELAP, and RETRAN.
TASK 6: Independent Software Module (s)
Testing.
This Phase 11 SBIR task will be to provide independent testing of the Nuclear Plant Data Bank (NPDB) software modules.
The NPDB software is being developed by Los Alamos National Laboratories (LANL) under an NRC contract.
This software is being develo' ped i,n a. modular mode, and, as part of the design phase, th'e functional description and interface will be dermed for each module.
As pan of the NPDB development, approximately 5 tests will be defined for a group of one or more modules.
The purpose of these tests will be to verify software complience with the module functional descriptions, and to verify software source code transportability.
These tests will be performed under this task by transporting the source code to another computer, recompiling with another FORTRAN 77 compiler, and j
performing the defined test.
Upon successful completion of cach test, a test results letter will be prepared for the NRC.
i f
j
t TASK 12 Nuclear Plant Data Bank Document Plan. This Phase 11 SBIR task will be to prepare the Nuclear Plant Data Bank (NPDB) documentation plan.
The purpose of this documentation plan will be to identify doeaments, specifications, and schedules required for the proper development, change control, maintenance, and usage of the NPDB.
The approach will be to define documentation requirements, identify existing software development life cycle documentation standards, compare the requiremchtii to these standards, develop an efficient but functional documentation plan, and schedule the implementation of this plan.
Necessary pieces of documentation will be assembled under this task during Phase I of the NPDB development.
The final l
documentation will be generated during Phase II of the NPDB 1
. development.
DELIVERY SCHEDULE Deliverables under Tasks 5, 6, and 7 are due by September 30, 1987.
l
'e O
6 9