ML20207R972
| ML20207R972 | |
| Person / Time | |
|---|---|
| Issue date: | 12/30/1986 |
| From: | Little M NRC OFFICE OF ADMINISTRATION (ADM) |
| To: | Moran D, Speis T NRC, Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20207R973 | List: |
| References | |
| CON-FIN-D-1751, CON-NRC-03-86-057, CON-NRC-3-86-57 SB-08610210, SB-8610210, NUDOCS 8703180373 | |
| Download: ML20207R972 (1) | |
Text
P
'b @
Q ()ly 1
~>
NRC FORM 255 CONT R ACI NUM8E R SB08610210 flRC-03-86-057 DIVIS10N OF CONTRACTS MOOlF IC ATION NUMBE R i
U.S. NUCLE AR REGUL ATORY CCMMISSION WASHINGTON, D C. 20655 ONtw 6 MOOirlCATION OTHE R ($pecsfri e
NOTIFICATION OF CONTRACT EXECUTION C NTRACT sAstO ON j
TO:
Themis P. Speis, Director AUTHORIZ ATION NUMBE R I
g 7,,,,j Division of Safety Review and Oversight i
Office of fluclear Reactor Regulation flRR-86-057 l
OATE I
tO,,,aa,t ar 11-13-86 FROM:
AA'J L J
l1 )
8-/b-W catract Spec Ast)
(Datel Define oral reporting Mary ttle, Contract Administrator requirements.
Lontract Administration Orancn Extend period of t
performance.
I I
DIVISION OF CONTRACTS ADM l
CONTR ACTOR i%me A E ocareal EXECUTION DATE SBA/Scientech,Inc.
DEC 3 01986 PO Box 1406 Idaho Falls, ID 83403-1406 TvrE OF CONTRACT l
CPFF l
PROJECT TITLE PE RIDO OF PERFORM ANCE g
Independent Assessment of the Advanced Light 8-18 1-31-87 l
Water Reactor Requirements Document PRINCIPAL INVESTIG ATOR L. Ybarrondo NRC AUTHORIZED R*PRESENT ATIVE David Moran B&R NUMBE R F IN NUMQ_t 4 20-19-50-547 D1751 AMOUNT NEW NRC FUNDS s No Change FUNDING TOTAL FY8__ FUNDING s No Change TOTAL NRC OBLIGATIONS s 74,502.00 GOVE RNMENT PROPE RTY AT T ACHME NT(5) 0703100373 061230 JN-ON6057 CoNTR ACT OOCUME NT I PDR NRC F ORM 2bb (1076) m