ML20207R708

From kanterella
Jump to navigation Jump to search
Forwards Jm Farley Nuclear Plant Unit 1,Cycle 8 Startup Test Rept, Per RP Mcdonald to LS Rubenstein
ML20207R708
Person / Time
Site: Farley 
Issue date: 03/13/1987
From: Mcdonald R
ALABAMA POWER CO.
To: Rubenstein L
Office of Nuclear Reactor Regulation
Shared Package
ML20207R709 List:
References
NT-87-0084, NT-87-84, NUDOCS 8703180049
Download: ML20207R708 (1)


Text

NT 87-0084

~

~ AlibIm3 Power Company 600 North 18th Street '

' Post Office Box 2641 Birmingham, Alabama 35291-0400 Telephone 205 250-1835 R. P. Mcdonald AlabamaPower Senior Vice President the southern electnc system March 13, 1987 Docket No. 50-348 Director, Nuclear Reactor Regulation U. S. Nuclear Regulatory Comission-Washington, D. C. 20555 Attention: Mr. L. S. Rubenstein Joseph M. Farley Nuclear Plant - Unit 1 Cycle 8 - Startup Report Gentlemen:

Enclosed is the Startup Report for Unit 1 Cycle 8 as outlined in the October'29, 1986 letter from Mr. R. P. Mcdonald to Mr. L. S.

Rubenstein.

If you have any questions, please advise.

77

]f Yours ve ly, (H

R. P. Mcdonald RPM /MDR:emb Enclosure cc: - Mr. L. B. Long Dr. J. N. Grace Mr. E. A. Reeves Mr. W. H. Bradford f

0703180049 B70313 6,

PDR ADOCK 05000348 PDR jg P

.