ML20207Q995
| ML20207Q995 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 03/06/1987 |
| From: | Agosti F DETROIT EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| VP-NO-87-0044, VP-NO-87-44, NUDOCS 8703110008 | |
| Download: ML20207Q995 (1) | |
Text
,-
-l p
- Nucleat Operations Fermi 2 Edison Eisni "
W em.
March 6,1987 '
VP-lO-87-0044 U. S. Itaclear Regulatory Cannission '
Attn Docum m t Control Desk Washington, D. C. 20555 L
Reference:
Fermi 2 NIC Docket No. 50-341 NIC License No.1@F-43 Subje' ct:
Oroanhation Channes As previously discussed with your Staff, Detroit Edison is providing supplemental information for the Technical Specification change request -
dated January 7,1987 (VP-NO-87-0003).
'the following represents the current Onsite Review Organization conposition reflecting recent organizational changes ard does not change any functional
' responsibility. As such, this does not represent a stbstantive change to the previous submittal.
VP-ND-87-0003 New Organization Chairman Plant Manager Plant Manager Vice-Chairman Superintendent-Operations Director, Plant Safety Vice-Chairman Superintendent-Maintenance Assistant Director,
& Modification Plant Safety i~
Member Operations Engineer Operations Engineer l
Member Technical Engineer Technical Engineer Member-Maintenance Engineer Superintendent-Operations l
Member Radiation Protection-Radiation Protection-Engineer l
Chenical Engineer j
Meuber Supervisor, Operational Superintendent-Maintenance Assurance
& Modification Member Reactor Engineer Reactor Engineer I
If you have any questions, please contact Mr. Steven Frost at (313) 586-4210.
l Sincerely DHL?d wY i
l cc: Mr. A. B. Davis u
Mr. E. G. Greenman Mr. W. G. Rogers j
Mr. J. J. Stefano ip 8703110000 870306 PDR ADOCK 05000341 PDR g
a
-