ML20207Q928

From kanterella
Jump to navigation Jump to search
Forwards Revs to Emergency Plan,Including Page Corrections to Body of Plan (Pages 5-2,8-1,8-3 & 8-4) & Revs to Emergency Response Procedures SOP-B.1 & SOP-B.2
ML20207Q928
Person / Time
Site: 05000083
Issue date: 03/03/1987
From: Vernetson W
FLORIDA, UNIV. OF, GAINESVILLE, FL
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
Shared Package
ML20207Q929 List:
References
NUDOCS 8703100236
Download: ML20207Q928 (1)


Text

.

NUCLEAR ENGINEEltlNG SCIENCES DEPARTMENT Nuclear Reactor Facility University of Florido

" I t.o.vanus n oimei e e m ma,,,, March 3, 1987 , ,-

Gelnovas,Florlds 33611 Phone (904392-1439 Teles56330 Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention: Document Control Desk Re: University of Florida Training Reactor (UFTR)

Facility License: R-56; Docket No. 50-83 Gentlemen:

The enclosed package contains ten (10) copies of two revisions to the ap-proved UFTR Emergency Plan. The first revision consists of page corrections to the body of the Plan (Pages 5-2, 8-1, 8-3 and 8-4). All changes are marked with a vertical bar in the margin and have been reviewed by UFTR management and the Reactor Safety Review Subcommittee to assure they do not decrease the effectiveness of the Plan.

The second revision consists of changes in the Emergency Response Pro- l cedures contained in Appendix III of the Plan. Page 9 of SOP-B.1, "Radiologi-cal Emergency" is changed to reflect a pager number for the Radiation Control Officer. SOP-B.2, " Emergency Procedure - Fire" is rewritten to assure better classification and response to fire events. These changes have also been re-viewed by UFTR management and the Reactor Safety Review Subcommittee to assure they do not decrease the effectiveness of the Plan.

The entire enclosure consists of:

1. Three (3) signed originals and seven (7) copies of this letter of transmittal.
2. Ten (10) copien of the UFTR Emergency Plan Revisions.

Sincerely,

.4 i William G. Vernetson Director of Nuclear Facilities WGV/ps Enclosures cc: Reactor Safety Review Subcommittee P.M. Whaley Ara bw a.

~

w..

,(Notary Qblic) )f(. Date) r > %. I&

~

G703100236 870303 3 PDR ADOCK 0500