Responds to Violations Noted in Insp Rept 50-382/86-26. Corrective Actions:Operations Group Reviewed Appropriate Vendor Manuals & Procedure OP-903-109 Being Issued to Require Monthly Diesel Generator Operability Checks
ML20207Q693
Person / Time
Site: Waterford Entergy icon.png
Issue date: 01/22/1987
From: Cook K
LOUISIANA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
W3P87-0511, W3P87-511, NUDOCS 8701280586
Download: ML20207Q693 (2)


Text

  • .

+ P. O. BOX 60340 Louisiama POWER / 317 BARONNESTREET

& L1GHT NEW ORLEANS. LOUISIANA 70160 +

(504) 595-3100 I$?ONEvsYIU January 22, 1987 W3P87-0511 A4.05 QA U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555

Subject:

Waterford 3 SES Docket No. 50-382 License No. NPF-38 NRC Inspection Report 86-26 Attached is the Louisiana Power and Light Company (LP&L) response to Violation No. 8626-01 which is cited in the subject Inspection Report.

If you have any questions on the response, please contact G.E. Wuller, Operational Licensing, at (504) 464-3499.

Very truly yours, a

K.W. Cook Nuclear Safety and Regulatory Affairs Manager KWC:KLB:ssf cc: R.D. Martin, NRC Region IV G.W. Knighton, NRC-NRR J.H. Wilson, NRC-NRR ,

NRC Resident Inspectors Office E.L. Blake W.M. Stevenson 8701280586 870022 Oj PDR ADOCK 05000382 G PDR p2 "AN EQUAL OPPORTUNITY EMPLOYER

u Attechncnt to W3P87-0511 Sheet 1 of I LP&L Response to Violation No. 8626-01 VIOLATION NO. 8626-01 Failure to Test and Maintain Security-Diesel Generator 10CFR73.55(g)(1) states that "All. . . security related devices or equipment shall be maintained in operable condition."

Waterford 3 Surveillance Procedure OP-904-001, Revision 2, " Security Diesel Generator Operability Check," states, "This procedure provides instructions for verifying the security diesel generator's operability in accordance with vendor recommendations. This surveillance will be performed weekly."

Contrary to the above, the NRC inspector determined that during the period May through November 1986, the licensee did not perform the operability check weekly as recommended by the vendor and required by Surveillance Procedure OP-904-001.

This is a-Severity Level IV violation.

RESPONSE

1. Reason for the Violation This procedure had been transferred from Electrical Maintenance responsibility to the Operations group. During this process an error was made during procedure preparation such that the procedure and tracking systems periodicities did not agree (procedure - weekly; task card - monthly). The procedure OP-904-001 Revision 2 should have stated, "This procedure provides instruction for verifying the security diesel generator's operability in accordance with vendor recommendations. This procedure will be performed monthly".
2. Corrective Action That Has Been Taken Operations has reviewed the appropriate vendor manual (s) and have determined that there are no specific periodicity recommendations by the vendor for the periodic testing. The procedure is being issued as Procedure OP-903-109 to require monthly operability checks.
3. Corrective Action To Be Taken No further action has been identified.
4. Date When Full Compliance Will Be Achieved Full compliance will be achieved when the new procedure is approved.