ML20207Q175

From kanterella
Jump to navigation Jump to search
Forwards B&W TMI-1 Power Level Cutoff Removal Analysis, in Response to NRC Request for Addl Info Re Section 8 of Cycle 6 Reload Rept to Verify Removal of Power Level Cutoff Hold Requirements of Tech Spec Sections 3.5.2.4 & 3.5.2.5
ML20207Q175
Person / Time
Site: Crane Constellation icon.png
Issue date: 01/16/1987
From: Hukill H
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF ADMINISTRATION (ADM)
Shared Package
ML20207Q176 List:
References
5211-87-2014, NUDOCS 8701230158
Download: ML20207Q175 (1)


Text

GPU Nuclear Corporation ew Je$sey 07054 a sipp y,

201 263-6500 TELEX 136-482 Writer's Direct Dial Number:

January 16, 1987 5211 2014 U.S. Nuclear Regulatory Connission Attention: Document Control Desk Washington, D.C.

20555 Gentlemen:

Three Mile Island Nuclear Station Unit 1 (TMI-1)

Operating License No. DPR-50 Docket No. 50-289 Cycle 6 Reload Report In response to your verbal request for further information concerning the analysis conducted to verify removal of the power level cutoff hold reauirements of Technical Specification Sections 3.5.2.4 and 3.5.2.5, referenced in the TMI-1 Cycle 6 Reload Report Section 8 (GPUN letter to NRC 5211-86-2182, dated November 3, 1986); attached is a copy of the TMI-l Power Level Cutoff Removal Analysis, September 1986, performed by Babcock

& Wilcox Company for GPUN.

If any further information is recuired, please contact us.

Sincerely,

. D.

ukill Vice President and Director, Unit 1 HDH/DJD/pa(1768g)

Attachment cc:

J. Stolz, USNRC T. Murley, USNRC Region I J. Thoma, USNRC F. Young, USNRC Region I D. Fieno, USNRC 870123015e 870116 ADOCK0500g9

'g PDR p

GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation