Summary of 861209 Meeting W/Util in Bethesda,Md Re Design Baseline Verification/Configuration Control Mgt Program.List of Attendees & Agenda Encl
ML20207Q070
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 01/20/1987
From: Grotenhuis M
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8701220045
Download: ML20207Q070 (6)


Text

. . _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

Jcnuary 20, 1987 Y

Docket No. 50-260 LICENSEE: Tennessee Valley Authority FACILITY: Browns Ferry Nuclear Plant, Unit 2.

SUBJECT:

DECEMBER 9, 1986 MEETING WITH THE TENNESSEE VALLEY AUTHORITY (TVA)-T0 DISCUSS THE BROWNS FERRY-(BFN) DESIGN BASELINE VERIFICATION / CONFIGURATION CONTROL MANAGEMENT PROGRAM i (DBVP/CCMP)

On December 9, 1986, representatives of TVA met with representatives of the NRC staff in Bethesda. The purpose of the meeting was for TVA to present to the staff the DBVP/CCMP as presently developed. The attendees are listed in Enclosure 1. The agenda for the meeting is given in Enclosure 2.

The meeting consisted of a presentation of information by TVA regarding the DBVP/CCMP as outlined in the agenda. The DBVP is outlined briefly as follows:

  • DESCRIPTION OF ISSUE:

-UNRECONCILED DESIGN CONTROL ISSUES CREATED NEED TO RE-ESTABLISH BASELINE AND VERIFY OF DESIGN

-REQUIRED LEVEL OF CONFIDENCE NEEDS TO BE DEVELOPED THAT PLANT IS READY FOR RESTART

-ACTUAL PLANT CONFIGURATION DIFFERS FRDM AS-CONSTRUCTED DRAWINGS AND BOTH DIFFER FROM AS-DESIGNED DRAWINGS

  • PLAN FOR RESOLUTION:

-TWO PHASE PROGRAM PHASE I: PRE RESTART PHASE II: POST RESTART

  • ' DESIGN CONTROL

-TVA ISSUE

-TVA RESOLUTION

-VOL I, II, III COMMITMENTS

  • SEQUOYAH(SON) PROGRAM

-LEAD PLANT

-REFINE PROGRAF.

1. RESOLVE PROBLEMS
2. EA OVERSIGHT
3. NRC REVIEW

~

0701220045 870120 PDR ADOCK 03000260 P PDR

i l

I

i

-EMULATE SQN PROGRAM PLAN

-EMULATE SQN PROCEDURES

  • PRODUCT I

-THE SAME-PLANT VERIFIED BY PHYSICAL WALXDOWN AND RECONCILIATION OF DISCREPANCIES

-INITIATE ONG0ING PROGRAM TO MAINTAIN BASELINE The Configuration Control Management Program was outlined briefly as a program to assure the following:

  • The physical (as-built) status of a facility is accurately reflected in the design, operation, maintenance, and training documents.
  • Management processes are in place to:

- Control changes to the facility

- Ensure adequate evaluations for changes have been performed

- Ensure consistency is maintained among all documents required for the design, operation, and maintenance of a facility Auditing and statusing systems are in place to provide management with information to assure configuration is maintained.

During the presentation questions were asked by the NRC staff and the questions were discussed fully. The following questions were discussed: 1)Theextent of the program, (i.e., does it cover all components or only modifications since the plant was licensed); 2) Does the program include the reverification of all TVA comitments (licensee to NRC and/or internal); 3) What systems or sub-systems will be verified prior to restart; and 4) The schedule for those to be verified after restart. These and other issues will be the subject of formal submittals and meetings in the future.

1

TVA will make a formal submittal of the DBVP most likely in January,1987. A more in-depth' technical meeting will be held, preferably at the site after this formal submittal.

OriginalelenedW M.Grotenhule -

Marshall Grotenhuis, Project Manager BWR Project Directorate #2 Division of BWR Licensing

Enclosures:

As stated cc: w/ enclosures See next page TAC N0. 62258 DISTRIBUTION igbcket Ftle SRConnelly, OIA NRC PDR GZech, RII Local PDR BJYoungblood PD#2 Reading File JHolonich OGC-Bethedsa CStahle EJordan TKenyon BGrimes WLong ACRS(10) TAlexion NRC Participants Aignatonis, RII HDenton RWessman HThompson GGears SRichardson, IE MGrotenhuis JTaylor. IE DMuller BHayes, 01 RBernero NGrace, RII WECampbell, OIA (Mail Stop EWS 461)

LSpessard, DI HGilpin KBarr, RII DBL:PD#2 DBL:PD#2 MGrotenhu s Wherr DBL DR5 8 fl *PN'et4 1/ p /87 '1/;d /87 1/ w /787 0FFICIAL RECORD COPY

i Mr. S. A. White, Manager of Nuclear Power Browns Ferry Nuclear Plant Tennessee Valley Authority Units 1, 2, and 3 i

cc:

General Counsel Resident Inspector Tennessee Valley Authority U. S. Nuclear Regulatory Commission 400 Commerce Avenue Route 2, Box 311 E 118 330 Athens, Alabama 35611 Knoxville, Tennessee 37902 R. W. Cantrell Acting Director, Nuclear Engineering Tennessee Valley Authority 400 West Summit Hill Dirve, W12 A12 Knoxville, Tennessee 37902 R. L. Gridley Tennessee Valley Authority SN 157B Lookout Place Chattanooga, Tennessee 37402-2801 M. J. May Tennessee Valley Authority Browns Ferry Nuclear Plant Post Office Box 2000 Decatur, Alabana 35602 H. P. Pomrehn Tennessee Valley Authority Browns Ferry Nuclear Plant Post Office Box 2000 Decatur, Alabama 35602 Chairman, Limestone County Commission Post Office Box 188 Athens, Alabama 35611 Ira L. Meyers, M.D.

State Health Officer State Department of Public Health State Office Building Montgomery, Alabana 36130 Regional Administrator, Region II U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 2900 Atlanta, Georgia 30303 Mr. Steven Roessler U. S. Nuclear Regulatory Commission Reactor Training Center Osborne Office Center, Suite 200 Chattanooga, Tennessee 37411

ENCLOSURE 1 ATTENDANCE M. Grotenhuis DBL /PD#2/NRC M. Campagnone NRC E. V. Imbro NRC/IE R. E. Architzel NRC/IE Michael J. May TVA/Mgr Lic BFN T. G. Chapman TVA/ Acting Project Engineer BF J. P. Stapleton TVA/ Advisor W. J. Pattison TVA/BFNP M. B. Holland TVA/BFNP N. K. Trehan NRC/NRR J. C. Tsao NRC/NRR/EB Don Katze NRC/RSB Bob Stevens NRC/EICSB/ DBL M. Srinivasan NRC/EICSB/ DBL D. B. Vassallo NRC/F08/ DBL D. A. Walker TVA/ Baseline /Knocville H. E. Crisler TVA/BFNP A. P. Capozz1 TVA/DNE Advisor James F. Murdock TVA Leav Emgr Baseline BFNP Frank J. Witt NRC/NRR/PSB J. D. Wolcott TVA Licensing BFNP A. J. Ignatonis NRC/RI!

Hugo Pomrehn Site Director, BFN, TVA J. Fredrick Weinhold TVA/DNE Mgr Eng Assurance Jerry Hulman NRC/ DBL /PSB D. R. Muller NRC/ DBL /PD#2 Brian Grimes NRC/DQAUT/IE Bob Herman NRC/ DBL /EB

f.

" ENCLOSURE 2 AGENDA NRC/IVA BFN NEETING '

4 December 9, 1986

  • CONFIGURATION MANAGEMENT Purpose Nanagement Process Monitoring Objectives Procedures
Design Basis Plant configurations BFN Policies Construction Operations Plant Systems Reviews t

~

Training Record Retention (Nanagement)

  • Changes

, Procedures Volume 3 Documented Design Basis Configuration Control Operations and Maintenance Natorial Control Manual Information System Na3or Elements of Browns Ferry's Configuration Manatoment Configuration Identification Change Control

! Document Control / Records Management Input Requirements Materials Management

Status Accounting Configuration Verification

. . _ . . . . _ . _ _ _ . - _ - _ _ _ _ _ _ _ _ . _ . . . , . . , . . . _ _ _ _ _ , _ _ _ _ , . . . _ _ _ . _ . . . . _ . _ _ . .