Georg'a Power Company -
Pbst Office Box 282 Waynesbora Georgia 30830
- Telephone 404 554-9961
, 404 724-8114 Southern Company Services, Inc.
Post Office Box 2625 Birmingham, Alabama 35202 Telept.one 205 870-6011 -
g January. 13, 1987-Director of Nuclear Reactor Regulation File: X7BC35 Attention:
Mr. B. J. Youngblood Log:
'GN-1328 PWR Project Directorate #4 Division of PWR Licensing A U. S. Nuclear Regulatory Commission Washington, D.C.
20555 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 l
V0GTLE ELECTRIC. GENERATING PIANT - UNITS 1 AND 2 SER CONFIRMATORY ITEM 27:
BYPASS AND INOPERABLE STATUS PANEL
Dear Mr. Denton:
The resolution of the subject confirmatory item as stated in the SER is based upon " confirmation of the installation and FSAR revision." The referenced letter confirmed,that the FSAR was changed for both Units 1 and 2.
Clarification was, however, requested by your staff on the installation status. The hardware modifications necessary to implement this design change have been installed on Unit 1.
The Unit 2 installation has not been completed. Georgia Power Company will advise your staff when the Unit 2 installation is completed.
If your staff requires any additional information, please do not hesitate to contact me..
S ce rely, l -
3 J. A. Bailey Project Licensing Manager JAB /sm xc:
R. E. Conway NRC Regional Administrator R. A. Thomas NRC Resident Inspector J. E. Joiner, Esquire D. Feig B. W. Churchill, Esquire R. W. McManus M. A. Miller (2)
L. T. Cucwa B. Jones, Esquire Vogtle Project File G. Bockhold, Jr.
9 ok 0992V 1 D 8701200369 870113 i