Submits Schedule for Addressing plant-specific Design Features Discussed in NRC SER of WCAP-10858, AMSAC Generic Design Package & Implementation of Final Design,Per 861031 Commitment
ML20207P880
Person / Time
Site: Surry, North Anna, 05000000
Issue date: 01/07/1987
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
85-316D, GL-85-06, GL-85-6, NUDOCS 8701200364
Download: ML20207P880 (2)


Text

.

y VINGINIA ELucrHIC AND POWER COMPANY Hicnwoxn,Vinoixir unerI January 7, 1987 Vacs Passinswr Nucaman orsmarrows U. S. Nuclear Regulatory Commission Serial No.

85-316D Attn: Document Control Desk Docket Nos.

50-280 Washington, D. C.

20555 50-281 50-338 50-339 License Nos. DPR-32 DPR-37 NPF-4 NPF-7 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT NOS. 1 AND 2 NORTH ANNA POWER STATION UNIT NOS. 1 AND 2 ANTICIPATED TRANSIENT WITHOUT SCRAM - ANSAC DESIGN Your letters of September 23, 1986 requested a schedule for addressing the plant specific design features discussed in your Safety Evaluation of Topical Report (WCAP-10858) "AMSAC Generic Design Package," and a schedule for implementation of our plant specific design.

In our letter of October 31, 1986 Virginia Electric and Power Company committed to provide a schedule for submitting plant specific design features, and a schedule for implementation of the final design.

It is our intention to submit the plant specific design features for the ATWS Mitigation systems by July 31, 1987. The schedule for installation of the ATWS mitigation systems is consistent with our three-year outage forecast and is as follows:

Surry Unit 1 Refueling Outage End of Cycle 10 (05/89 - 06/89)

Surry Unit 2 Refueling Outage End of Cycle 10 (10/89 - 12/89)

North Anna Unit 1 Refueling Outage End of Cycle 7 (09/88 - 12/88)

North Anna Unit 2 Refueling Outage End of Cycle 6 (03/89 - 04/89)

Due inpart to the delay in issuance of Generic Letter 85-06 " Quality Assurance for ATWS Equipment that is not Safety-Related" and the staff's Safety Evaluation Report on Topical Report WCAP 10858, "AMSAC Generic Design Package",

installation of the ATWS mitigation systems at our nuclear stations is now scheduled beyond the date designated in 10 CFR 50.62(d).

As noted in our October 31, 1986 letter, the identified schedule also addresses the added time due to our selection of a different functional design since the issuance and as a result of the staff's SER. The installation schedule is based on the time requirements to complete the engineering design and lead time necessary for equipment delivery consistent with our three-year refueling outage forecast.

Very truly,yours,

/

mA fN'b*8"*""#

k[yo 8701200364 870107 PDR ADOCK 05000280 j

P PDR

.V-cc:

U. S. Nuclear Regulatory Commission Marietta Street N.W.

Suite 2900 Atlanta, Georgia 30322 l

Mr. W. E. Holland NRC Senior Resident Inspector Surry Power Station 4

Mr. J. L. Caldwell NRC Senior Resident Inspector North Anna Power Station Mr. Chandu P. Patel NRC Surry Project Manager PWR Project Directorate No. 2 Division of PWR Licensing-A Mr. Leon B. Engle NRC North Anna Project Manager PWR Project Directorate No. 2 Division of PWR Licensing-A i

e i

s I

t y_-

y.

._m..,,,.. _

,__m.

y-,--, _,,,,,._..c.c,y.,-. -.., ~. - _, _..

rm.,__.~,.y7,.e.