9 Pubhc SeMce Electric and Gas Company St: yen E. Millenberger Pub c Serv,cc E%ctnc and Gas Company F.O. Box 236. Hancocks Brege, NJ 08038 609 339 4199 r
vue us e a cv ue, c*
OCT15 W NLR-N88162 i
i l
United States Nuclear Regulatory Commission Document control Desk Washington, DC 20555 Gentlemen HOPE CREEK VALIDATION AND VERIFICATION REPORT DOCKET NO. 50-354 Attached is a copy of the Hope Creek Generating Station Safety f
Parameter Display System (SPDS) Validation and Verification (V&V) report.
This report documents the results of p,rformance valida-tion tests and field verification tests performed to ensure that the Hope Creek SPDS is acceptable and meets the applicable requirements of NUREG-0737, Supplement 1.
i The results of the dynamic portion (man-in-loop) of the performance validation test are not included in this report.
Also, a number of discrepancy reports are included with this l
document.
The majority of these discrepancies have been resolved l
j as indicated in the enclosed reports, and will be closed upon the j
issuance of updated PSE&G documents.
The appropriate document
)
updates will be completed by December 31, 1988.
Nine discrepancies remain open.
Of the nino, four require minor system retesting to close.
Retesting of three of these items will be completed by October 15, 1988.
The remaining retest requires a shutdown to complete.
This retest will be performed during the mid-cycle outage scheduled for January 1989.
These four items are not considered to be operability concerns as discussed with D. Allsopp, Hope Creek Resident Inspector.
Three j
other items are open pending receipt of vendor documents and incorporation of these documents into PSE&G documents.
This is i
anticipated by October 30, 1988.
The last two item Will be addressed with completion of the man-in-loop test, t o 1.- c a
i completed by December 31, 1988, as discussed above.
A revised l
V&V report will be submitted by February 1989 which will document I
the resolution of the aforementioned items.
I
\\
0(
9 l
i
'\\'
G810200072 881013 PDR ADOCK 05000334 P
Document Control Desk 2
DCT 13 gag Should you have any questic.s, please feel free to contact us.
Sincerely, f
I i
1 Attachment i
C Mr.
G. W. Rive' bark I
Licensing Proje.ct Manager i
Mr.
G. W. Mever Senior Resident Inspector Mr. W. T. Russell, Administrator Region I Mr.
D. M. Scott, Chief j
Bureau of Nuclear Engineering Department of Environmental Protection l
380 Scotch Road Trenton, NJ 08628 l
1 l
l i
I
{L,
-