i l
TABLE 3.3-11 (Continued)
TABLt NOTATION
- May be bypassed when steam pressure is below 650 psig.
Sypass shall be automatically removed when the steam pressure exseeds 650 psig, i The previsions of Specification 3.0.4 are not applicable.
ACTION STATEMENTS ACTION 13 - With the number of OPERABLE Channels one less than the Total Nurser of' Channels, startup and/or power operation may proceed until performance of the next required CHANNEL FUNCTIONAL TEST provided the inoperable sec-tion of the channel is placed in the tripped condition within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />.
ACTION 14 - With the number of OPERABLE Channels one less than the Total Number of Channels, restore the inoperable channel to 0.PERABLE status within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN
)
within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
i f
DAVIS-BESSE. UNIT 1 3/4 3-27 Amendment te. 37 0810200056 881013 PDR ADOCK 05000346 P
A.,
)
2 5
- s
?
E E
TABLE 3.3-12 I
l T
STEAM AND FEEDWATER RUPTURE CCNTRO'. SYSTEM g
INSTRUMENTATION TRIP SETPOINTS FUNCTIONAL UNITS TRIP SETPOINTS ALLOWABLE VALUES 1.
Steam Line Pressure - Low 1 591.6 psig 1 591.6 psig*.
h 586.6 psig**
2.
Steam Generator Level - Low (I}
2 16.4" 1 15.6"*
_ 12.9"**
3.
Steam. Generator Feedwater Differential Pressure - High (
$ 197.6 psid i 197.6 psid*
w4
-< 199.6 psid**
co 4.
Reactor Coolant Pumps - Loss of High $ 1354.6 amps
$ 1384.6 ampsi Low 1 106.5 amps 1 106.5 ampsi l
l l
(1) Actual water level above the lower steam generator tubesheet.
l l
- 2) Where dif ferential pressure is steam generator minus feedwater pressure.
p E
- Allowable Value for CHANNEL FUNCTIONAL TEST
- Allowable Value for CHANNEL CALIBRATION
- Allowable Value for CHANNEL FUNCTIONAL TEST and CHANNEL CALIBRATION
~
n
~
F 6
co e
.)
f
-e