ML20207N895
| ML20207N895 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 10/13/1988 |
| From: | Hukill H GENERAL PUBLIC UTILITIES CORP. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| C311-88-2140, NUDOCS 8810190450 | |
| Download: ML20207N895 (2) | |
Text
e s
e GPU Nuclear Corporation Nuclear accma=
o Middletown, Pennsylvania 17057 0191 717 C44 7621 TELEX 84 2386 Writer's Olrect Olal Number October 13, 1988 C311-88-2140 US Nuclear Regulatory Commission Attn:
Document Control Desk Washington, DC 20555
Dear Sir:
Three ittle Island Nuclea.' Station, Unit 1 (TMI-1)
Operating License No. DPR-50 Docket No. 50-289 Report of Reactor Building Purging Activities During Cycle 6 Operation As committed to in our letter of February 25, 1987, GPUN is submitting a summary of Reactor Building purging activities during Cycle 6 operation.
Cycle 6 is defined as the time period between the start of plant heatup following the refueling outage (3/20/87) and achieving cold shutdoun for the Cycle 7 refueling outage (6/19/88).
Date Length Reason 03/22/87 13 hrs.
With the reactor shutdown, purging was initiated to support end of outage maintenance.
06/12/87 289 hrs.
Purging commenced approximately 6 hrs, prior to the plant shutdown for the Letdown Cooler replacerxnt outage. The purge was secured prior to heatup from this outage.
02/16/88 69 hrs, Purging commenced approximately 9-3/4 hrs, prior to plant shutdown for the Stator Coolant Flush Outage. The purge was secured prior to Reactor Startup from this outage.
06/17/88 27-1/4 hrs.
Purging commenced approximately 21-1/4 hrs. prior to shutdown for the 7R Refueling Outage.
This purge was secured en 06/18/88 af ter the reactor shutdown, but prior to having the plant in cold shutdown.
06/18!88 17-3/4 hrs, Purging was initiated in support of the pending 7R Outage. At the termination of this purge, the plant was essentially in cold shutdown.
pol GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation 1 0 0G10190450 GS1013 PDR ADOCK 05000289 P
o C311 2140 October 13, 1988 The total number of purging hours during Cycle 6 was 416 hours0.00481 days <br />0.116 hours <br />6.878307e-4 weeks <br />1.58288e-4 months <br />.
Data for the present and future cycles will be made available as requested.
Sincerely, i
H. D. Nucill Vice President & Director, THI-1 HDH/SM0/spb:1276A cc:
R. Hernan R. Conte W. Russell I