UNITED STATES
!)
')
i NUCLEAR REGULATORY COMMISSION l
WASHINoToN D. C. 20$$$
,/
October 5, 1988 MEMORANDUM FOR:
Victor Stello, Jr.
Executive Director for Operations l
FROM:
Edward L. Jordan, Chairman Committee to Review Generic Requirements
SUBJECT:
MINUTES OF CRGR MEETING NUMBER 146 i
The Committee to Review Generic Requirements (CRGR) met on Wednesday, September 14, 1988 from 1-5 p.m.
A list of attea. fees for this meeting is attached (Enchsure 1).
The following items were addressed at the meeting:
1 1.
J. Zwolinski (NRR) and D. Morisseau (NRR) presented for CRGR review a proposed Commission Policy Statement on Nuclear Power Plant Working L
Hours.
The Committee recommended in favor of forwarding the proposed policy statement to the Commission subsequent to several modifications
]
that are to be coordinated with the CRGR staff.
This matter is discussed
~
in Enclosure 2.
l 2.
A. Serkiz (RES) and F. Rosa (NRR) presented for follow-up CRGR review a i
draft Reg. Guide 1.9. Rev. 3. "Selection, Design, Qualification. Testing and Reliability of Diesel Generator Units Used as Onsite Electric Power J
Systems at Nuclear Power Plants." The Committee recomtended in favor of issuing the proposed Reg. Guide for public comment subject to resolution i
of the remaining CRGR recommendations that are to be coordinated with the l
CRGR staff.
This matter is discussed in Enclosure 3.
}
3.
B. Morris (RES) and T. King (RES) presented for CRGR review a proposed rule on maintenance.
The Committee recommended in favor of forwarding the proposed rule to the Commission subject to incorporation of minor clarifications that are to be coordinated w'th the CRGR staff.
This j
matter is discussed in Enclosure 4.
4 In accordance with the ED0's July 18,1983 di,%ctive concerning "Feedback and Closure of CWGR Reviews," a written response is required from the cognizant 4
office to report agreement or disagreement with the CRGR recommendations in these minutes.
The response, which is required within five working days after receipt of these minutes, is to be forwarded to the CRGR Chairman and if there is disagreement ~ith CRGR recommendations, to the EDO for decisionmaking.
pF9 (O]m gla i
esto290422 esioos i
o aww
o Questions concerning these meeting minutes should be referred to Cheryl Sakenas (492-4148).
beb'ed Saad '*
L Q 1xden Edward L. Jordan, Chairman Committee to Review Generic Requirements
Enclosures:
As stated I
cc w/ enclosures:
Commission (5)
SECY Office Directors Regional Administrators CRGR Members W. Parler J. Zwolinski D. Morisseau A. Serkiz F. Rosa B. Morris T. King Distribution: (w/o enc.)
Central File,
PDR (NRC/CRGR)
- 5. Treby W. Little M. Lesar B. Doolittle (w/ enc.)
CRGR SF (w/ enc.)
M. Taylor (w/ enc.)
E. Jordan (w/ enc.)
J. Heltemes (w/ enc.)
i I
J. Conran (w/ enc.)
C. Sakenas (w/ enc.)
0FC
- AE00:CRGR :
AE00:DD
- C/CRGR: J00 :
.p,,..f
.........,xC,y g
12.....................................................
..... 7 p...
NAME :
a ena :cg : CJ temes :
- an 9/2I/88
$ ip/Sy/88 f09/j'/88 DATE :
OFFICIA'. RECORD COPY