ML20207N691

From kanterella
Jump to navigation Jump to search
Third Supplemental Response of Gpu Nuclear Corp to NRC Staff First Set of Interrogatories.* Related Correspondence
ML20207N691
Person / Time
Site: Crane 
Issue date: 01/09/1987
From: Doris Lewis
GENERAL PUBLIC UTILITIES CORP., SHAW, PITTMAN, POTTS & TROWBRIDGE
To:
NRC OFFICE OF THE GENERAL COUNSEL (OGC)
Shared Package
ML20207N694 List:
References
CON-#187-2171 CIV-PEN, EA-84-137, NUDOCS 8701140363
Download: ML20207N691 (4)


Text

-

ll?l O

  • EtATED CORRESWH4%

00LMETED January 9, 198yNRC 2 P2 58 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION CFF..

Before the Administrative Law Judge CCC In the Matter of

)

GPU Nuclear Corporation Docket No. 50-320 - 68 U EEA

)

EA-84-137 (Three Mile Island Nuclear

)

Station, Unit No. 2)

)

THIRD SUPPLEMENTAL RESPONSE OF GPU NUCLEAR CORPORATION TO NRC STAFF'S FIRST SET OF INTERROGATORIES In supplemental response to NRC Staff's First Set of Inter-l rogatories to GPU Nuclear Corporation (Oct. 9, 1986), GPUN identifies the following documents:

Interrogatory 3(b)-(c):

Transcript of Tape Recording of March 9, 1983 Meeting between Lawrence P. King and Robert C.

Arnold Typed notes of Interview of R.

Arnold, May 16, 1983 by D. Aulick and E. Stier; Typed notes of R. Arnold Interview by D. Aulick May 23, 1983; Typed notes of Interview with B.

Austin by D. Aulick on May 18, 1983; Typed notes of Interview with B.

Austin by D. Aulick on May 24, 1983; Typed notes of Interview of Steve Babczak, May 3, 1983; DOhk$500h320

}$01b PDR

6 Memo from T. Brown to File re May 19, 1983 Interview with Blaine Ballard; Typed notes of Interview with John Barton by D. Aulick on June 23, 1983; Typed notes of Interview with Darrell Blizzard, May 24, 1983, by D. Aulick; Typed notes of Interview with Mr.

Bruner by D. Aulick, May 23, 1983; Typed notes of Interview with D.

Buchanan by D. Aulick on May 18, 1983; Typed notes of Interview of J.

Chwastyk by D. Aulick on May 9, 1983; Typed notes of Interview with Joe Chwastyk by D. Aulick, June 28, 1983; Typed notes of Interview May 19

[1983] with P. Clark; Typed notes of telephone conversa-tion with P. Clark, June 21 [1983],

by D.

Aulick; Typed notes of telephone conversa-tion with P. Clark by Dean Aulick, June 23 [1983);

Memo from T.

Brown to File re May 18, 1983 Interview with Ron Freemerman; Typed notes of Interview with R.

Gallagher by D. Aulick, May 23, 1983; Memo from T. Brown to File re May 19, 1983 Interview with Carl Hrbac; v

Memo from T. Brown to File re May 17, 1983 Interview with Bahman Kanga; Memo from T. Brown to File re May 18, 1983 Interview with Ed Kitler; Memo from T. Brown to File re May 19, 1983 Interview with Mark Kobi; Memo from T. Brown to File re May 18, 1983 Interview with E. Mummert; Typed notes of Interview with Terry Myers, May 5 [1983], by D. Aulick; Memo from T. Brown to File re May 16, 1983 Interview with J. Perry;

' Typed notes of telephone conversa-tion with Milt Pollack on June 20,

[1983] by D. Aulick; Typed notes of telephone conversa-tion with Milt Pollack by D.

Aulick, June 22 [1983];

Typed notes of Interview with Larry Santee, by D. Aulick, May 23, 1983; Typed notes of Interview with Ben Slone, July 15, 1983 by D. Aulick; Typed notes of Interview of B.

Smith by J. Wilson, July 13, 1983; Typed notes of Interview of Dr. J.

Thiesing by D. Aulick, May 20, 1983.

Memorandum from Travis Brown to Files re Preliminary Interview of James Troebliger on April 25-26, 1983; Memorandum from Travis Brown to Files re Interview with James F.

Troebliger on May 2-3, 1983.

With the exception of the transcript of the tape recording, the documents above are part of the Stier investigation.

These --

l b

documents have been identified upon review of case files in the King proceeding and are being produced.

The Stier documents and backup material, however, have previously been made available to the NRC Staff.

These materials are currently located at Three Mile Island and remain available to the NRC Staff for inspection.

Interrogatory 8(b):

Letter from R. Arnold to E. Gischel (April 9, 1983);

Memorandum from B. Ballard to B.

Kanga (Feb. 23, 1983) (" Polar Crane Safety Evaluation," with handwritten distribution list);

Memorandum from D. Lake to L. King (Feb. 28, 1983) (" Resolution of Comments: Polar Crane Load Test Procedure");

Letter from R. Arnold to E. Gischel (July 1, 1983);

Three Mile Island Info / Update (April 5, 1983);

Memorandum from R. Arnold to E.

Gischel (April 4, 1983) (re "Mr.

Gischel's Memorandum of April 4, 1983 and Attached Affidavit");

Memorandum from R. Arnold to E.

Gischel (April 4, 1983) (re "Mr.

Gischel's Memorandum of April 4, 1983 and Attached Affidavit," with handwritten annotation).

Respectfully submitted, SHAW, PITTMAN, POTTS & TROWBRIDGE

/

I By: David R.

Lewis Counsel for GPU Nuclear Corporation Dated: January 9, 1987. _ -

. -..