ML20207N665

From kanterella
Jump to navigation Jump to search
Gpu Nuclear Corp Proposed Corrections to Transcripts of Prehearing Conferences & Hearing Sessions.* Proposed Corrections to 860307-1112 Transcripts of Prehearing Conferences & Hearings Listed.Certificate of Svc Encl
ML20207N665
Person / Time
Site: Crane 
Issue date: 01/09/1987
From: Nassikas J
GENERAL PUBLIC UTILITIES CORP., SHAW, PITTMAN, POTTS & TROWBRIDGE
To:
References
CON-#187-2179 86-519-02-SP, 86-519-2-SP, LRP, NUDOCS 8701140343
Download: ML20207N665 (21)


Text

,.

.g 2/79 4

00LKETEP USNi C UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION 87 JAN 12 Pl2:13 BEFORE THE PRESIDING BOARD 6FFut O T.0Chii:{

)

In the Matter of

)

)

Docket No. LRP TOND l

INQUIRY INTO THREE MILE

)

ISLAND UNIT 2 LEAK RATE

)

ASLBP No. 86-519-02 SP DATA FALSIFICATION

)

)

GPU NUCLEAR CORPORATION'S PROPOSED CORRECTIONS TO TRANSCRIPTS OF PRE-HEARING CONFERENCES AND HEARING SESSIONS 1

I I.

Pre-Hearing Conferences A.

March 7, 1986 Page No.

Line No.

Reads Should Read 7

15 in and 13 8

Martin Marvin 14 17 that.

That that, that

~

i 15 17 Stier's Stier 28 10 Fagar Faegre

(*t

    • S-)

37 4

rules ruled 37 16 will testimony will hear testimony 37 17 that said, that he said, 49 14 as falsification was falsification 8701140343 870109

~

PDR ADOCK 05000320 PT PDR 4

D$U2

\\

Page No.

Line No.

Reads Should Read 49 18 Baylor Mehler 49 24 I don't either Do you 50 3

parties come on parties comment on 58 11 cached couched 61 20 Board Staff B.

April 11, 1986 (Telephone) 79 5

to a state to state C.

April 24, 1986 87 19 On behalf of Committee Appearing Pro Set on Health Aspects and Management of Nuclear Power 88 16 Herbine Herbein (et seg.)

103 12 naot not 112 9

06870 0680 116 1

not Stier, not in Stier, 117 23 cut have could have 121 17 now long how long 121 22 perceive receive 124 12 engaged in opposed i

i 139 9

Coon's Kuhn's 139 9

Diekamp Dieckamp 151 17 noncomformist nonconformance i

i t

Page No.

Line No.

Reads should Read 180 12 NLV NOV D.

July 31, 1986 (Telephone) 206 19 On behalf of Committee on Health Aspects and Management of Nuclear Appearing Powert Pro Se 207 17 confession questions 208 11 Salinger Seelinger (it agg.)

210 20 Rambeau Rambo (St s3g.)

211 14 and an attempt in the capacity.

212 20 once until 214 20 courts.

records.

214 22 user use or 216 23 as a principal has a principal consultant is consultant who is 217 6

would ask asked 217 10 call called 217 11 explain explained 218 3

putting these putting questions to these 218 20 You We 218 24 You We 219 18 Vermier Wermiel (it agg.)

221 9

Havercamp Haverkamp Page No.

Line No.

Reads Should Read (ft se2-)

238 9

describing subscribing to 239 19 Kline Flynn 241 11 drip strip 247 22, 24 sub Supp.

252 4

He She E.

August 25, 1986 255 19 Jack Fred 257 3

Fagrant Faegre 257 12 MBR MPR 266 21 who and 274 14 to through,

277 16 knowledge problem 287 12 5th 25th 287 13 in all cases, as well, 287 13 12.

12 days.

288 19 sought received 288 20 were of an were an 330 13 and that and then 330 15 or some or on some 330 18 And as approximate And in as proximate 332 1

Knowing Not knowing 334 10 In Any

6 0-Page No.

Line No.

Reads should Read 336 18 might be give Mr.

might give me Mr.

343 4-we way 343 5

make back 343 25 decontamination information 344 3

proposed opposed II.

Hearing Sessions A.

September 8, 1986 374 13-14 STIER, and STIER, MOMAN COLE, and 379 9

in an I

394 24 Including Included 395 20 understanding sanding understanding 404 4

By My 418 3

Unit 12 Unit 2 419 1

us use 427 18 I

a 494 15 limiting additions limiting conditions 501 4

Muller Moeller 543 6

73:

Judge Kelley: 73:

B.

September 9, 1986 596 7

operation.

operation?

609 4

larger err error 650 8

1:30 11:30 a.m. _ _ _. _ - _.

I Page No.

Line No.

Reads should Read 654 23 you'xd you'd 708 22 How How 725 11 invalid invalidated C.

September 10, 1986 840 23 err error 841 16,20 err error 846 4

err error 848 14 therfore thereafter 850 19 decisions conditions 864 20 makeup followup 871 14 understanding understating 925 21 for by 934 23 that's one one 948 10 bounding boundary 949 11 err error 951 19 sub Supp.

974 4

mechahicL mechanical D.

September 11, 1986 1030 8

1 12 1031 7

1 12 1032 10 Goldberg McBride 1073 8

may made.

O Page No.

Line No.

Reads Should Read 1078 11 leak loop 1135 22 don't it's don't think it's 1154 20 8

10 1157 13 Edmund Edwin 1160 1

Mr.

Mrs.

1160 23 McBride Blake 1169 23 within sight with insight 1180 15 Sidney Parsippany E.

September 16, 1986 1335 1

proposed propose 1355 20 1-A 12-A 1387 2

Faegre & Benson NRR 1410 7

to for 1422 13 a1 a good 1 1448 2

case who case and who 3

supoenned are subpoenaed 1455 25 remained rem.ain 1468 8

told it not told not 1471 9

owe to 1485 12 Condid Congdon 15 Condid Congdon 1487 1

Illje Illjes 1487 15 were where 1491 1

at a.

Page No.

Line No.

Reads Should Read 1500 24 sump such 1503 15 I

Mr. Russell: I F.

September 17, 1986 1589 11 at as 1646 7

been out been our 1668 14 NPR MPR G.

September 18, 1986 1833 6

sugestas suggests 1875 7

Judge Kelley Mr. McBride H.

September 19, 1986 1910 1

Havercamp Haverkamp (at agg.)

1939 21 Mr. Stier Judge Kelley 1969 22 Steers Stier 2017 18 Mr. Stier Judge Kelley I.

September 24, 1986 2061 12 marriage Narrative 2088 11 Mr. Reading Reading 2092 17 then thin 2109 5 (et seg.)

LER 78-62/IT LER 78-62/1T

1 o

-o Page No.

Line No.

Reads Should Read 2131 4

writing rounding 2143 15 would have would not have 2154 19 Commission.

It Commission." It i

2154 24 "At the same At the same 2155 2

specific issues."

specific issues 2198 21 competely Branch 1-completed during December 11 October 1-December 11 2210 10 Holtz Boltz J.

September 25, 1986 2279 5

proscess process 2300 4

speck spec K.

September 30, 1986 2316 9

specific specification 2316 11 for within 2324 4

1 11 2360 17 something nothing 2374 14 shifts (sic) test 2409 22 certain certainty 2437 8

in if 2471 20 pressure pressurizer 2478 6

realm real 2479 4

a compensation an exception i. -. -. -.....

Page No.

Line No.

Reads Should Read L.

October 1, 1986 2538 24 seven four 2542 8-9 mike / row phones microphones 2543 9

available availability 2558 5

Hugh Ed 2564 2

returning running 2574 6

CR CRO 2618 8

over-evaluation overall evaluation 2649 11 decision discussion M.

October 2, 1986 2682 16-17 for getting forgetting 2695 18 pidgin math pigeon math 2731 18 NRC to allege 4-inch NRC-2 Alleg. 4" hydrogen addition H2 Add.

2732 3

Steve Stier 2733 8

experiments experiment N.

October 3, 1986 2762 23

" Answer:

A i

2801 14 7862 78-62 2802 14 has as i

2824 19 form from

i l

Page No.

Line No.

Reads Should Read O.

October 6, 1986 2855 3

1250 120 2883 19 12 2

2888 18 from for 2927 4

Joel Joe 2964 5

TF30 Tab 30 2965 20 box book 2974 21 COR CRO 2978 22 now no 2992 7

employers lawyers P.

October 7, 1986 3052 15 i

I Q.

October 8, 1986 3164 17 obtained occurred R.

October 9, 1986'-

3258 15 If Is 3270 17 Conoway Conaway 3274 14 same safe 3290 22 of or 3312 24 fact face 3319 24 law log -

Page No.

Line No.

Reads Should Read 3325 1

they these 3351 3

amouant amount 3352 3

steer Stier 3353 14 Steer Stier 3353 19 Mr. Capper Mr. Capra 3354 3

Mr. Capper's Mr. Capra's 3370 3

steer Stier 3371 5

saa says 3380 8

usp up 3387 11 Al Hal 3398 3

specis specs S.

October 10, 1986 3409 7

Caper Capra 3411 11 it your it to your 3463 11 be been 3466 1

class what classic example of what 3497 20 a

an 3503 9

you got a got you got a good a good 3512 9

assistance assistants 3531 19 may made 3553 24 with which -

-O I

e Page No.

Line No.

Reads Should Read 3470 17 No. 18 for No. 18 for identification identification and received T.

October 14, 1986 3622 9

as least at least 3635 17 3655 3

give given 3735 S-6 new regular NUREG-0680 0680 sub 5 Supp. 5 7

evaporative factor evaporative loss factor 3740 1

'85-81

'80-81 3760 8

He We 14 Chwatsyk Chwastyk l

3763 14 Unger Kunder i

i U.

October 15, 1986 I

3805 18 there theirs 3861 17 Dthat D that 3866 19 sinking singing i

3878 12 DiBase DeVesa i

V.

October 16, 1986 3948 17 The Production Introduction i

3949 12 see say 3959 18 POV POD r L l

1 i

O Page No.

Line No.

Reads Should Read 3979 3

Pp.m.

ppm 4027 13 a part apart W.

October 17, 1986 4041 14 Steer Stier (3t s3g.)

4043 12 1975 1979 4110 18 reporter operator 4123 15 Herbine Herbein (gt sgg.)

4132 4

PF TF 4136 4

destruction instruction 4141 9

plan plant 4161 5

Chun Chung (3t agg.)

X.

October 28, 1986 4173 23 Mr.

Mrs.

4176 17 Boyd Hoyt 4211 17 142 147 4245 5

quantify quantified 4251 9

liked looked 4253 18 seek seeing 4285 11 May my Page No.

Line No.

Reads Should Read Y.

October 29, 1986 4321 4

gmp gpm 4326 3

NUREG-680 Sub 4 NUREG-0680 Supp. 5 4383 18 3.4.6-2 3.4.6.2 4407 14 LER 78-62/IT LER 78-62/1T (et seg.)

4407 18 in in '78 in '78 4415 23 motion most 4417 1

foremen foreman Z.

October 30, 1986 4434 18 come came 4448 25 them grading them then grading them 4456 20 in until 4490 3

Bolts' Boltz's 4497 11 progress process 4507 1

came come 4512 11 78-62/IT 78-62/1T 4520 7

Harold Charles AA.

October 31, 1986 4549 15 what was i

4572 22 A

a I

Page No.

Line No.

Reads Should Read 4573 3

A a

4595 2

exemption exception BB.

November 3, 1986 4646 5

ces cc's 4659 18 the then 4667 10 Arnold around 4679 25 Is It 4682 4

Bright Kelley 4711 25 check it, looks check, it looks 4712 25 Documentary View Document Review 4718 18 staisfied satisfied 4728 12 And and 4738 21 programs perhaps 4751 9

valves values 4780 14 17 19 4788 7

reasonable reason,

4791 25 at, the at the 4792 3

opposed Mr.

opposed to Mr.

CC.

November 4, 1986 4822 15 "The Production

" Introduction 4842 2

prim number Crim. No.

4892 6,

14 James P.

James R. s

Page No.

Line No.

Reads Should Read 4898 18 Bryan Brian 4915 17 5:13/02 15:13:02 4917 21 to tha fact this to Mr. Seelinger Mr. Seelinger was as Floyd's 4924 5

again to question again question 4935 17-calls cause DD.

November 5, 1986 4948 13 we need we do not need 4951 11 extent extend 4951 21 MR. CAPRA:

MR. MCBRIDE:

4967 25 classical classroom 4991 9

the running the running the EE.

November 6, 1986 1

5103 17 stage status 5107 16 statemens statements 5108 2

simply it simply enclosed it l

5110 9

1980 1986 l

5110 10 1986 1980

?

5110 10 war warp 5118 4

novo nolo 5119 14 Morthlan Morck 5137 5

particular particulate j

5137 5

pump, activations pump activations i

8

,-n--

--w..,e, n.v a.


w.-

.,,,,--,.n,.,-.

wo-,.+,-,-v.,

-rm,w_vm,m----,,_,me, men _,,,--r..n--.,,ry,,

,~v

l l

Page No.

Line No.

Reads Should Read 5145 20 forminiting formaniting (at seq.)

5146 16 forminite furmanite (gt agg.)

5149 18 are the are at the 5150 7

Absence Absent 5151 19 done down 5155 8

swich switch 5157 13 or nor 5162 16 Feldes Fels 5169 24 tests test 5170 12 Iljes' Illjes' 5181 4

More Morck 5185 5

give given 5185 6

give given 5188 17 assumaing assuming 51'92 1

forminizing furmaniting 5193 10 78-62/1E 78-62/1T 5194 10 week weeks 5195 9

one a one and a 5197 2

Havercamp Havercamp (at agg.)

5212 4

many an 5221 19 striken stricken 5226 22 particuarly particularly.

i Page No.

Line No.

Reads Should Read 5227 6

conversation Reading conversation with Reading FF.

November 12, 1986 5252 1

inspections inspection 5301 4

KELLEY BRIGHT 5318 17 Hartman Harbin 5333 15 matters parties Dated:

January 9, 1987 Respectfully submitted, SHAW, PITTMAN, POTTS & TROWBRIDGE 2300 N Street, N.W.

Washington, D.C.

20037 (202) 663-8000 By:,

  1. ohn N. Nassikas C '

Counsel for GPU Nuclear Corporation __

00LKEIEE UNITED STATES OF AMERICA UNC NUCLEAR EEGULATORY COMMISSION BEFORE THE PRESIDING BOARD T

JM 12 R233 f0C'iYb A

I

)

BRANCH j

In the Matter of

)

)

Docket No. LRP INQUIRY INTO THREE MILE

)

ISLAND UNIT 2 LEAK RATE

)

ASLBP No. 86-519-02 SP DATA FALSIFICATION

)

)

CERTIFICATE OF SERVICE 4

I hereby certify that on January 9, 1987, I served the fore-going "GPU Nuclear Corporation's Proposed Corrections to Tran-scripts of Pre-Hearing Conferences and Hearing Sessions" by hand-delivering a copy thereof to the following persons marked with an asterisk and by raailing, first class, postage prepaid, a copy thareof to the remaining individuals and office on the fol-lowing list:

  • Administrative Judge James L. Kelley, Chairman Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, D.C. 20555
  • Administrative Judge Glenn 0. Bright Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, D.C. 20555
  • Administrative Judge James H. Carpenter Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, D.C. 20555 l

2 w--=

.--7,-

- - - - + -,., - -. - - - _, -.

..--r-

.w-,,--.e-.-.--ww_.,-------wcy-

---,,--.7

1 r

Mary E. Wagner, Esq.

Office of General Counsel U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Docketing and Service Branch (3)

U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Harry H. Voigt, Esq.

James W. Moeller, Esq.

LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Avenue, N.W.

Suite 1100 Washington, D.C. 20036 Smith B. Gephart, Esq.

Jane G. Penny, Esq.

Killian & Gephart 216-218 Pine Street Box 886 Harrisburg, Pennsylvania 17108 James B. Burns, Esq.

Isham, Lincoln & Beale Three First National Plaza Suite 5200 Chicago, Illinois 60602 Michael W. Maupin, Esq.

Hunton & Williams P.O. Box 1535 Richmond, Virginia 23212 Mrs. Marjorie M. Aamodt Box 652 Lake Placid, New York 12946 and Mrs. Marjorie M. Aamodt 200 N. Church Street Parkesburg, Pennsylvania 19356 C

gohn N. Nassikas :-11

.