ML20207N642
From kanterella
Jump to navigation
Jump to search
ML20207N642 | |
Person / Time | |
---|---|
Site: | Wood River Junction |
Issue date: | 12/09/1986 |
From: | Berger J OAK RIDGE ASSOCIATED UNIVERSITIES |
To: | Crow W NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS) |
References | |
27694, NUDOCS 8701140331 | |
Download: ML20207N642 (3) | |
Similar Documents at Wood River Junction | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20137W9061997-04-15015 April 1997
[Table view]Forwards Drafts of Policy Memo Re Submissions to Us NRC, Settlement of Us NRC NOV & Proposed Imposition of Civil Penalty & $99,000 Check.W/O Check ML20133E2841996-12-0909 December 1996 Forwards 1996 Groundwater Monitoring Rept for Unc, Charleston,Ri. Workscope Listed ML20059J8951993-10-28028 October 1993 Forwards Results of Nitrogen Analyses Performed by USGS on Samples,Recently Obtained from Wells Near Former Unc Facility in Wood River Junction,Ri.Notifies That Old Wells Riw 667 & Riw 670 Replaced by Wells Riw 789 & Riw 790 ML20062J3421993-10-25025 October 1993 Forwards Results of Radiological Analyses Performed on Water Samples,Including 3 Replicates Collected from Wells in Vicinity of Unc Scrap Recovery Facility,Wood River Junction, Ri,By USGS During Sept 1993 ML20056H4561993-07-19019 July 1993 Advises That Rept Entitled Groundwater Monitoring Plan:Unc Site,Charlestown,Ri, Satisfies Criteria for Monitoring Plan W/Two Exception.Provides Listed Comments on Deficiencies Re Plan ML20125C2991992-12-0202 December 1992 Forwards Map of Unc Wood River Junction,Ri Site,Showing Relation of Site Boundaries to Amtrak Line & Areas of Site Where Nuclear Matl Utilized or Stored,Per 921014 Request ML20141M0831991-12-23023 December 1991 Responds to 911219 Telcon Requesting Vol II of Oak Ridge Associated Univs Confirmatory Radiological Survey of Unc Site,Wood River Juction,Rhode Island & Map Showing Location of All Known Burials ML20247P5241989-09-19019 September 1989 Forwards Safety Insp Rept 70-0820/89-01 on 890824-26.No Violations Noted ML20247Q8081989-09-13013 September 1989 Comments on NRC Re Final Survey Repts for Unc Recovery Sys Operation in State of Ri.Addl Excavation of Area Conducted & Addl Samples Taken,Per NRC Request.Residual Matl in Area of Sample 7 Will Be Removed ML20246F7721989-08-22022 August 1989 Forwards Oak Ridge Associated Univs Final Survey Repts.W/O Encl ML20247P7401989-07-26026 July 1989 Forwards Orau 89/G-25, Confirmatory Radiological Survey of United Nuclear Corp Site Wood River Junction,Ri, Vol I-Restricted Zone, Final Rept.Rept Describes Restricted Zone ML20246J0641989-06-26026 June 1989 Forwards Orau 89/F-10, Confirmatory Radiological Survey of United Nuclear Corp Site,Wood River Junction,Ri:Vol II-Areas Outside Restricted Zone, Final Rept ML20248D8071989-03-22022 March 1989 Expresses Concern Re Inconsistency in Third & Fourth Quarter Groundwater Results for Well 77-B.Licensee Should Review Procedures for Nitrate & Sr-90 Analyses to Determine Reasons for Inconsistent Results ML20206A6551988-11-0404 November 1988 Forwards Safeguards Insp Rept 70-0820/88-02 on 880915.No Violations Noted ML20206C1761988-10-28028 October 1988 Forwards Safety Insp Rept 70-0820/88-03 on 880914-16.No Violations Noted ML20196J8381988-06-27027 June 1988 Forwards Safety Insp Rept 70-0820/88-01 on 880524.No Violation Noted ML20245D4101988-05-16016 May 1988 Discusses Decommissioning & License Termination for Rhode Island Facility & Forwards Preliminary Assessment of United Nuclear Corp Wood River Junction,Ri. Concern Expressed Re Applicability of Super Fund After License Termination ML20154K7961988-05-0303 May 1988 Forwards Complete Sets of Well Analyses for 1986 & 1987,per 880426 Request ML20154G2991988-05-0202 May 1988 Forwards Soil Analysis Results for Grid Block B-126,per 880426 Request.Scheduling of Verification Survey Requested as Soon as Possible Since Results Constitute Analysis of Last Grid Block of Concern ML20151W8431988-04-26026 April 1988 Advises of NRC Concern Re Delay in Decommissioning of Unc Recovery Sys Facility.Response to Listed Items Including Soil Analysis Results for Grid B-126 & Sample Analysis for All Wells for 1986 & 1987 Requested within 60 Days ML20151W8771988-01-25025 January 1988 Submits Results of Oak Ridge Associated Univs Analysis on Portions of Three Composite Unc Soil Samples,Provided to Idaho for Referee Evaluation.Values Differ Slightly from 871103 Correspondence ML20149D3041988-01-0404 January 1988 Submits Updated Chain of Communications for Licensee,Per NRC Request ML20236R6801987-11-18018 November 1987 Forwards Safety Insp Rept 70-0820/87-02 on 870827-28.No Violations Noted ML20237G2631987-08-11011 August 1987 Issues Amend 4 to License SNM-777,authorizing Quarterly Collection of Well Samples & Analyses for Gross Alpha & Beta Radioactivity,Ph,Nitrate & Fluoride.Ser Encl ML20216H6761987-06-22022 June 1987 Forwards Insp Repts 70-0371/87-03 & 70-0820/87-01 on 870518- 22.No Violations Noted ML20235F0611987-06-12012 June 1987 Forwards Clarifying Info Re Deletion of Wells from Sampling Requirements,Per 870512 Request ML20236D3721987-05-15015 May 1987 Discusses WT Crow Issuing Amend to Reduce Authorized Possession Limits of License SNM-777 in Response to KA Helgeson 870306 Request.Safeguards Amend MPP-2,dtd 820405,withdrawn ML20213G1801987-05-12012 May 1987 Forwards Request for Addl Info Based on Review of 870130 Application for Amend to License SNM-777 & 870413 Suppl. Response Requested by 870615 ML20209D2881987-04-24024 April 1987 Issues Amend 3 to License SNM-777,authorizing Change in Corporate Name & Site Mgt.Condition 1 Revised to Read Unc Recovery Sys & Condition 9 Revised to Include New Pages for Subsections 101,102,103,201,202 & 206.SER Encl ML20215L1911987-04-13013 April 1987 Forwards Nitrate & Radiological Analysis for Nov 1986,per 870304 Request for All Well Data for 1986.All Data Not Sent for Reasons Listed ML20205E9711987-03-16016 March 1987 Notifies of Proposed Activities to Review & Further Decontaminate Grid Blocks Identified by NRC at Feb 1987 Meeting.Nrc Concerns Re Status of Listed Grid Blocks Arising from Results of Soils Analyses Ack & Addressed ML20212L3271987-03-0404 March 1987 Requests Analytical Data for All Wells from Jan 1986 to Present.Info Needed to Continue Review of 870130 Amend Request to Change Monitoring Requirements ML20207S1461987-03-0303 March 1987 Informs That J Velasquez Assigned by Unc Corporate to Complete Remainder of Work Leading to Termination of License.Site Continues Under Day to Day Operational Mgt of K Helgeson ML20211D5721987-01-28028 January 1987 Forwards Proposed Agenda for 870204 Meeting in Silver Spring,Md & Analytical Results of Soil Samples Taken from Areas of Addl Decontamination Since 850906 Meeting.Areas in Question Now Meet NRC Decontamination Guidelines for Soil ML20207N3171987-01-0909 January 1987 Forwards Jd Berger s to WT Crow & M Horn Providing Addl Info for Soil Results Provided in Orau & Forwarding Bldg Survey Results,Respectively.W/O Encls ML20207N6421986-12-0909 December 1986 Forwards Isotopic U Analyses for Six Soil Samples Collected During 860926 Followup survey.U-234/U-235 Average Ratio in Good Agreement W/Previously Reported Values ML20207N6271986-12-0909 December 1986 Forwards Tables Summarizing Contamination Surveys of Bldg Interior Surfaces at Unc Wood River Junction Plant,Per Discussion.Surfaces Now Satisfy NRC Guidelines for Release from Licensing Restrictions ML20215N9681986-11-0404 November 1986 Forwards J Berger (Oak Ridge Associated Univs) Rept to Nrc.Soil Analyses Are for Info & Action Per NRC Target Soil Criteria.Response to Awaited to Enable Completion of Requested Licensing Action.W/O Encl ML20215N6721986-10-30030 October 1986 Forwards Safety Insp Rept 70-0820/86-02 on 860821-22.No Violations Noted ML20213E3121986-10-15015 October 1986 Forwards Results of 860926 Followup Survey of Outside Areas at United Nuclear Corp Facilities in Wood River Junction. Areas of U-235 Surface Soil Contamination Indicate Total U Concentrations Exceeding Branch Technical Position Levels ML20212M8971986-08-22022 August 1986 Advises of Issuance of Amend 1 to License SNM-777,reflecting Change in Corporate Name.Condition 9 Revised to Include New Pages for Subsections 100,101,102 & 201,replacing Pages for Subsections 101,102 & 201,dtd 840510 ML20206H6561986-06-24024 June 1986 Responds to 860502 Request for Confirmatory Survey of Property.Analytical Results for Soil & Dates When All Licensed Matl Will Be Removed from Site Requested to Facilitate License Termination ML20206E0651986-05-19019 May 1986 Forwards Groundwater Transport of Sr-90 in Glacial Outwash Environ, Describing Development of one-dimensional Transport Model Used to Predict Sr-90 Cleanout from Groundwater ML20198D8301986-05-0202 May 1986 Responds to NRC Re Soil Sample Isotopic U Analysis & Request for Action & Schedule for Completion of Soil Decontamination Efforts.Addl Soil Removal Being Conducted.Details of Effort Encl.W/O Schedule ML20204A0291986-04-30030 April 1986 Forwards Safety Insp Rept 70-0820/86-01 on 860304.No Violation Noted ML20137X4581985-11-20020 November 1985 Forwards Abbreviated History of Recovery Sys Facility from 1964 to Present,In Response to Request ML20133Q3931985-10-29029 October 1985 Forwards J Berger Re Isotopic U in Soils.Requests Specific Actions & Schedules for Completion of Soil Decontamination Effort.Appropriate Confirmatory Surveys Will Be Performed Upon Receipt of Info ML20138R0091985-10-24024 October 1985 Advises That Update of Status of Decommissioning Efforts Will Be Provided Periodically ML20138R0011985-10-18018 October 1985 Expresses Appreciation for Update on Decommissioning Efforts at Wood River Junction.Inclusion in List of Relevant Informational Documents Re Decommissioning of Facility Requested ML20133Q4051985-10-16016 October 1985 Forwards Results of Analysis of Isotopic U Content of Soil Samples from Restricted Area,Confirming That U-234 Major Contaiminant in Residues at Wood River Junction Site & U-234/U-235 Ratio on Order of 30 or Greater 1997-04-15 Category:INCOMING CORRESPONDENCE MONTHYEARML20137W9061997-04-15015 April 1997
[Table view]Forwards Drafts of Policy Memo Re Submissions to Us NRC, Settlement of Us NRC NOV & Proposed Imposition of Civil Penalty & $99,000 Check.W/O Check ML20059J8951993-10-28028 October 1993 Forwards Results of Nitrogen Analyses Performed by USGS on Samples,Recently Obtained from Wells Near Former Unc Facility in Wood River Junction,Ri.Notifies That Old Wells Riw 667 & Riw 670 Replaced by Wells Riw 789 & Riw 790 ML20062J3421993-10-25025 October 1993 Forwards Results of Radiological Analyses Performed on Water Samples,Including 3 Replicates Collected from Wells in Vicinity of Unc Scrap Recovery Facility,Wood River Junction, Ri,By USGS During Sept 1993 ML20247Q8081989-09-13013 September 1989 Comments on NRC Re Final Survey Repts for Unc Recovery Sys Operation in State of Ri.Addl Excavation of Area Conducted & Addl Samples Taken,Per NRC Request.Residual Matl in Area of Sample 7 Will Be Removed ML20247P7401989-07-26026 July 1989 Forwards Orau 89/G-25, Confirmatory Radiological Survey of United Nuclear Corp Site Wood River Junction,Ri, Vol I-Restricted Zone, Final Rept.Rept Describes Restricted Zone ML20246J0641989-06-26026 June 1989 Forwards Orau 89/F-10, Confirmatory Radiological Survey of United Nuclear Corp Site,Wood River Junction,Ri:Vol II-Areas Outside Restricted Zone, Final Rept ML20245D4101988-05-16016 May 1988 Discusses Decommissioning & License Termination for Rhode Island Facility & Forwards Preliminary Assessment of United Nuclear Corp Wood River Junction,Ri. Concern Expressed Re Applicability of Super Fund After License Termination ML20154K7961988-05-0303 May 1988 Forwards Complete Sets of Well Analyses for 1986 & 1987,per 880426 Request ML20154G2991988-05-0202 May 1988 Forwards Soil Analysis Results for Grid Block B-126,per 880426 Request.Scheduling of Verification Survey Requested as Soon as Possible Since Results Constitute Analysis of Last Grid Block of Concern ML20151W8771988-01-25025 January 1988 Submits Results of Oak Ridge Associated Univs Analysis on Portions of Three Composite Unc Soil Samples,Provided to Idaho for Referee Evaluation.Values Differ Slightly from 871103 Correspondence ML20149D3041988-01-0404 January 1988 Submits Updated Chain of Communications for Licensee,Per NRC Request ML20235F0611987-06-12012 June 1987 Forwards Clarifying Info Re Deletion of Wells from Sampling Requirements,Per 870512 Request ML20215L1911987-04-13013 April 1987 Forwards Nitrate & Radiological Analysis for Nov 1986,per 870304 Request for All Well Data for 1986.All Data Not Sent for Reasons Listed ML20205E9711987-03-16016 March 1987 Notifies of Proposed Activities to Review & Further Decontaminate Grid Blocks Identified by NRC at Feb 1987 Meeting.Nrc Concerns Re Status of Listed Grid Blocks Arising from Results of Soils Analyses Ack & Addressed ML20207S1461987-03-0303 March 1987 Informs That J Velasquez Assigned by Unc Corporate to Complete Remainder of Work Leading to Termination of License.Site Continues Under Day to Day Operational Mgt of K Helgeson ML20211D5721987-01-28028 January 1987 Forwards Proposed Agenda for 870204 Meeting in Silver Spring,Md & Analytical Results of Soil Samples Taken from Areas of Addl Decontamination Since 850906 Meeting.Areas in Question Now Meet NRC Decontamination Guidelines for Soil ML20207N6421986-12-0909 December 1986 Forwards Isotopic U Analyses for Six Soil Samples Collected During 860926 Followup survey.U-234/U-235 Average Ratio in Good Agreement W/Previously Reported Values ML20207N6271986-12-0909 December 1986 Forwards Tables Summarizing Contamination Surveys of Bldg Interior Surfaces at Unc Wood River Junction Plant,Per Discussion.Surfaces Now Satisfy NRC Guidelines for Release from Licensing Restrictions ML20213E3121986-10-15015 October 1986 Forwards Results of 860926 Followup Survey of Outside Areas at United Nuclear Corp Facilities in Wood River Junction. Areas of U-235 Surface Soil Contamination Indicate Total U Concentrations Exceeding Branch Technical Position Levels ML20206E0651986-05-19019 May 1986 Forwards Groundwater Transport of Sr-90 in Glacial Outwash Environ, Describing Development of one-dimensional Transport Model Used to Predict Sr-90 Cleanout from Groundwater ML20198D8301986-05-0202 May 1986 Responds to NRC Re Soil Sample Isotopic U Analysis & Request for Action & Schedule for Completion of Soil Decontamination Efforts.Addl Soil Removal Being Conducted.Details of Effort Encl.W/O Schedule ML20137X4581985-11-20020 November 1985 Forwards Abbreviated History of Recovery Sys Facility from 1964 to Present,In Response to Request ML20133Q4051985-10-16016 October 1985 Forwards Results of Analysis of Isotopic U Content of Soil Samples from Restricted Area,Confirming That U-234 Major Contaiminant in Residues at Wood River Junction Site & U-234/U-235 Ratio on Order of 30 or Greater ML20198D9471985-10-0202 October 1985 Provides New Address ML20133K3871985-09-17017 September 1985 Forwards Geohydrologic Data for Low Level Radioactive Contamination Site,Wood River Junction,Ri & Two Articles Re Groundwater Contamination Problem at Wood River Junction Plant ML20132A3611985-08-27027 August 1985 Forwards Selected Papers in Hydrologic Sciences,1985, Dealing W/Usgs Studies Performed at Unc Recovery Sys Site ML20062A5661982-07-13013 July 1982 Forwards Comments on Revised State of Ri Draft Agreement, Submitted May 1982,re Decommissioning of United Nuclear Corp Recovery Sys.Apparent Goals of State of Ri Cannot Be Accommodated within Atomic Energy Act & NRC Regulations ML20058B3751982-06-22022 June 1982 Forwards Draft Memorandum of Understanding Between NRC & State of Ri Re Decommissioning of Unc Recovery Sys Facility. Encl Draft Reflects Input of General Public,State Officials & Citizens Advisory Committee ML20054M8141982-06-22022 June 1982 Forwards Attachment to United Nuclear Corp ML20054H3181982-05-13013 May 1982 Comments on Mar 1982 Draft Agreement Between NRC & State of Ri Re Decommissioning of Unc Recovery Sys.Substantive Requirements to Be Imposed Erroneous,Unjustified & Objectionable.Requests Notification Upon Formal Submittal ML20054F4721982-05-0303 May 1982 Forwards Survey Plan for Unrestricted Areas of United Nuclear Corp Facility in Wood River Junction,Ri.Plan Incorporates Comments from State ML20126J5761981-02-0606 February 1981 Responds to NRC Re Violations Noted in IE Insp Rept 70-0820/80-14.Disputes Violation.Presents Seven Reasons for Considering U Scrap to Have Been Unirradiated Matl ML20126J5351980-12-17017 December 1980 Discusses Tasks II-b & II-c of NRC-02-80-076 & Provides Comments Re Specs for Addl Deep Well to Be Drilled by licensee.Goldberg-Zoino Hydrological Rept Was Received ML20148P9541980-12-12012 December 1980 Submits List of Drums & Contents for Waste Shipment from Facility to Sc Burial Site ML20148D4001980-07-23023 July 1980 Lists Concerns of Client,Concerned Citizens of Ri Re Burial of Radwaste & Presence of Sr-90 at Site ML20148D4081980-07-0909 July 1980 Requests Consideration in Establishing Realistic Background Radiation Basis.Excerpt from Data Taken in Apr 1963 Encl ML20147B6901978-11-0202 November 1978 Requests 10 Day Extension for Resolution of 781002 Inventory Since Contractor Labs Mass Spectrometer Unit Failed ML20148A1331978-11-0101 November 1978 Provides Addl Info on Corrective Measures Taken in Response to IE Inspec 70-820/78-21.Oper Procedures for Contamination Control &/Or Health Physics Will Incl Handling Procedures for Contaminated Gloves ML20148A1381978-11-0101 November 1978 Forwards Response to 781012 NRC Ltr Re Deviation Noted in Inspec Rept 70-820/78-21.Corrective Actions:Assurance of Compliance W/Contamination Control Requirements,Institution of Vehicle Surveys,Formalization of Draft Procedures ML20148L1501978-10-27027 October 1978 Forwards List of Current Pages Now in Review Re Subj Facil, Formal Statements That Info Is No Longer Proprietary,Added Pages to Section 925.17 Re Fire Safety Aspects of Extraction Process & Revised Page for Section 407.1 ML20197B6181978-10-23023 October 1978 Submits Addl Info & Action Plan in Response to 781016 NRC Ltr Re Physical Protec Plan.Corrective Actions:Firearms Requalification,Security Guard Training Record Audit,Maint of Journl,Unc Audit,Immediate Personnel Changes Made ML20197B6441978-10-20020 October 1978 Forwards Lic Fee of $150,under Protest,To Amend Lic SNM-777 to Raise the Source Matl Possession Limits to Add 80,000 Lbs of Depleted U ML20197B6571978-10-18018 October 1978 Responds to 781016 NRC Ltr Re Physical Protection Program at Subj Facil.Finds No Evidence of Deficiency.Forwards Established Procedures Which Are Believed Adequate.Sees No Need to Change Procedures ML20148F5951978-10-13013 October 1978 Forwards Addl Info Re an Alternate Form of Constr of Sidewall of a Lagoon Using Ring of Sheet Steel Braced by Steel Posts & Supported W/An Impermeable Barrier of Betonite Clay.Additions Do Not Constitute Any Basic Changes ML20147A9691978-09-21021 September 1978 Request Admin Amend to Lic SNM-777,clarifying Language in Health Physics Section to Assure Compliance During Planned Shutdown of Ventilation Equip.Forwards Check for $150 ML20205H9621976-02-0202 February 1976 Forwards Petition for Adoption of Emergency Safeguards Measures Or,Alternatively,For Revocation of Licenses ML20141E5231972-05-16016 May 1972 Requests Registration as Users of Model BB-250-2,GE Models BU-4 & BU-5,Kerr Mcgee Corp Model NPd-1-528 & United Nuclear Models UNC-2400 & UNC-2901 1997-04-15 Category:RESEARCH INSTITUTION/LABORATORY TO NRC MONTHYEARML20247P7401989-07-26026 July 1989
[Table view]Forwards Orau 89/G-25, Confirmatory Radiological Survey of United Nuclear Corp Site Wood River Junction,Ri, Vol I-Restricted Zone, Final Rept.Rept Describes Restricted Zone ML20246J0641989-06-26026 June 1989 Forwards Orau 89/F-10, Confirmatory Radiological Survey of United Nuclear Corp Site,Wood River Junction,Ri:Vol II-Areas Outside Restricted Zone, Final Rept ML20151W8771988-01-25025 January 1988 Submits Results of Oak Ridge Associated Univs Analysis on Portions of Three Composite Unc Soil Samples,Provided to Idaho for Referee Evaluation.Values Differ Slightly from 871103 Correspondence ML20207N6421986-12-0909 December 1986 Forwards Isotopic U Analyses for Six Soil Samples Collected During 860926 Followup survey.U-234/U-235 Average Ratio in Good Agreement W/Previously Reported Values ML20207N6271986-12-0909 December 1986 Forwards Tables Summarizing Contamination Surveys of Bldg Interior Surfaces at Unc Wood River Junction Plant,Per Discussion.Surfaces Now Satisfy NRC Guidelines for Release from Licensing Restrictions ML20213E3121986-10-15015 October 1986 Forwards Results of 860926 Followup Survey of Outside Areas at United Nuclear Corp Facilities in Wood River Junction. Areas of U-235 Surface Soil Contamination Indicate Total U Concentrations Exceeding Branch Technical Position Levels ML20133Q4051985-10-16016 October 1985 Forwards Results of Analysis of Isotopic U Content of Soil Samples from Restricted Area,Confirming That U-234 Major Contaiminant in Residues at Wood River Junction Site & U-234/U-235 Ratio on Order of 30 or Greater ML20054F4721982-05-0303 May 1982 Forwards Survey Plan for Unrestricted Areas of United Nuclear Corp Facility in Wood River Junction,Ri.Plan Incorporates Comments from State 1989-07-26 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20207N642&oldid=3610950"