Forwards Addl Info Per 861223 Discussion Re Plant Safety Monitoring Sys (Psms) Verification & Validation.Procedures Implemented Whereby Selected Control Board Displayed Data Compared W/Psms Data on Weekly Basis
ML20207N328
Person / Time
Site: Vogtle  
Issue date: 01/05/1987
From: Bailey J
GEORGIA POWER CO., SOUTHERN COMPANY SERVICES, INC.
To: Youngblood B
Office of Nuclear Reactor Regulation
References
GN-1283, NUDOCS 8701140132
Download: ML20207N328 (2)


Text

_

Georgia Power Company Post Offica Box 282 Waynesboro, Georgia 30830 Telephone 404 554-9961 404 724-8114 Southern Company Services, Inc.

Ibst Office Box 2625 Birmingham, Alabama 35202 Telephone 205 870-6011 Vogtie Project January 5, 1987 Director of Nuclear Reactor Regulation File: X7BC35 Attention:

Mr. B. J. Youngblood Log:

GN-1283 PWR Project Directorate #4 Division of PWR Licensing A U. S. Nuclear Regulatory Commission Washington, D.C.

20555 REF: BAILEY (GPC) TO DENTON (NRC), GN-1256, 12/22/86 NRC DOCKET NUMBERS 50-424 AND 50-425 CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 V0GTLE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 PLANT SAFETY MONITORING SYSTEM VERIFICATION AND VALIDATION

Dear Mr. Denton:

In a recent discussion, December 23, 1986, your staff requested clarification and additional information relative to the referenced letter. This request concerned plant operations staff actions during the interim period between licensing and completion of the plant safety and monitoring system (PSMS) V&V program.

The referenced letter committed Georgia Power to implement procedures whereby selected control board displayed data would be compared with the like PSMS data on a weekly basis. This includes the extended range neutron flux l

information that is displayed on a local panel rather than on the control board. GPC also committed to develop and implement procedures to determine information, independent of the PSMS, for which there was no direct displayed l

backup.

In addition to the above, GPC commits to develop and have available to the operations staff acceptance criteria which instructs the operator as to when r

the PSMS displayed information is unacceptable and therefore, when the control board or local panel displayed information or information derived from procedures should be used in place of PSMS dat.a.

l l

l l

8701140132 870105

~

PDR ADOCK 05000424 o\\

O PDR D

l

e

~n, Director of Nuclear Reactor Regulation File: X7BC35 January 5, 1987 Log:

GN-1283 Page 2.

If your staff requires any additional information, please do not hesitate to contact me.

S cerely, i

e e

J. A. Bailey Project Licensing Manager JAB /sm xc:

R. E. Conway R. A. Thomas J. E. Joiner, Esquire B. W. Churchill, Esquire M. A. Miller (2)

B. Joner, Esquire G. Bockhold, Jr.

NRC Regional Administrator NRC Resident Inspector D. Feig R. W. McManus L. T. Cucwa Vogtle Project File 0955V l

l

{