ML20207N176
ML20207N176 | |
Person / Time | |
---|---|
Site: | 05000433 |
Issue date: | 01/05/1987 |
From: | Profio A CALIFORNIA, UNIV. OF, SANTA BARBARA, CA |
To: | Dosa J NRC |
Shared Package | |
ML19292G608 | List: |
References | |
NUDOCS 8701140030 | |
Download: ML20207N176 (1) | |
Similar Documents at 05000433 | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20073B9901991-06-18018 June 1991
[Table view]Forwards Rept Summarizing Findings of Orau Review of 59 Docket Files for Terminated Research & Test Reactors ML20070U0301991-03-0606 March 1991 Forwards Ltr from Constituent Je Loder,Requesting Info as to Tightened Security at Nuclear Power Plants,Particularly at Seabrook Station in Light of Middle East Crisis & Accompanying Threats of Terrorism ML20005E3671989-12-21021 December 1989 Forwards Executed Amend 7 to Indemnity Agreement E-58, Terminating OL R-124 for L-77 Research Reactor at Univ of California at Santa Barbara ML19327B4971989-10-26026 October 1989 Resubmits Matl Balance Rept for Period Ending 890331 & 0930 to Clarify Pu-Be Neutron Source Status at Reactor. Inconsistency in 890330 Ltr to NRC Resulted from Bookkeeping Error ML20245B4531989-06-0808 June 1989 Forwards Encl Listed Info on Decommissioned & Shutdown Reactors Requested During Discussions at Saxton on 890511 ML20248E6841989-03-30030 March 1989 Requests Termination of License R-124 for 10-watt L-77 Nuclear Training Reactor.Fuel Returned to DOE & Reactor Decommissioned.Final Radiation Survey Performed in Sept 1986.Pu/Be Neutron Source Transferred to State of CA ML20155B9841988-10-0404 October 1988 Forwards Responses to Issues Identified in FEMA 880901 Exercise Rept of Offsite Emergency Organization.Provides Listing of Activities Planned to Resolve Issues Identified in Rept & Intended Completion Schedule ML20151A0311988-03-30030 March 1988 Informs That Info Provided in Response to NRC Bulletin 87-001 Being Used to Determine Extent of Industry Participation & Implementation of Erosion/Corrosion Insp Programs & to Obtain Data on Observed Pipe Wall Thinning ML20150D8641988-03-18018 March 1988 Informs of Relocation of NRR to Rockville,Md.Official Mailing Address Still Remains Same & Project Managers Have New Locations & Phone Numbers.Ts Michaels Still Lead Project Manager for Facility & a Adams Will Serve as Backup ML20215F6131987-06-11011 June 1987 Informs of Recent Reorganization of Nrr.Ofc Now Standardization & Non-Power Reactor Project Directorate, Under Div of Reactor Projects,Iii,Iv,V & Special Projects. T Michaels Designated Project Manager for Facility ML20207A3441987-04-21021 April 1987 Responds to Re Decommissioning of Facility. Reactor Must Be Dismantled,Appropriate Disposition of Component Parts & Radioactive Matls Made & Site Decontaminated Prior to Conclusion of Decommissioning ML20207A3511987-02-19019 February 1987 Requests Review & Comment Re Interim Storage of Reactor Vessel in Secure,Isolated Area.Space Occupied by Vessel Required for Expansion of Free-Electron Laser Research Program ML20207N1761987-01-0505 January 1987 Forwards Proprietary Final Survey Rept for Univ of California,Santa Barbara,L-77 Reactor Dismantling. No Contamination Noted.Permit for Burial of Radioactive Core vessel-shield Assembly Needed.Encl Withheld IR 05000433/19860011986-10-0808 October 1986 Forwards Proprietary Safeguards Insp Rept 50-433/86-01 on 860922 (Withheld Ref 10CFR2.790).No Violations Noted ML20212N4981986-08-26026 August 1986 Forwards Order Authorizing Dismantling of Facility & Disposition of Component Parts.Finding of Significant Environ Impact,Ser & Environ Assessment Also Encl ML20202D3931986-06-27027 June 1986 Forwards Response to NRC 860613 Request for Clarification of Earlier Replies to NRC Questions on Decommissioning of L-77 Training Reactor.Expedited Action Requested,As Other Groups Await Release of Space ML20206F7841986-06-13013 June 1986 Forwards Questions Re 860324 Response to NRC 860220 Request for Addl Info Re Decommissioning Plan.Response Requested within 30 Days of Ltr Date ML20210H9191986-03-27027 March 1986 Lists Change in Telephone Number for H Bernard,Facility Project Manager,Due to NRR Reorganization.D Tondi New Nonpower Reactors & Safeguards Licensing Section Leader. Correspondence Should Be Sent to Listed Address ML20205L0841986-03-24024 March 1986 Forwards Responses to NRC 860220 Followup Questions Re License R-124.Matl W/Radioactivity Below Limits of Reg Guide 1.86 Will Be Disposed of as Radwaste or Released for Unrestricted Use Following NRC Confirmatory Survey ML20153G9261986-02-20020 February 1986 Requests Documented Responses to Encl Questions Re Decommissioning Plan,In Support of Application to Decommission L-77 Research Reactor,Per 860113 Telcon W/ Rocketdyne.Response Requested within 30 Days of Ltr Date ML20153F2141986-02-14014 February 1986 Informs of Intent to Assist Univ of California Personnel in Performing Defueling of L-77 Research Reactor on 860218-21. Two Small Check Sources of Less than 0.01 Uci Tc-99 & Th-230 Each Will Be Used ML20214C5251986-02-0707 February 1986 Advises That Defueling Equipment Will Be Setup & Predefueling Radiation Survey Performed on 860218.Shipment of Final Two Containers Will Be Made on 860226 ML20137G4841986-01-0303 January 1986 Advises That Motion Detector Repaired on 860102 & Security Alarm Sys Back to Normal ML20137G6031985-12-31031 December 1985 Informs That Review of Defueling Procedures Delayed Until 860102.Motion Detector in Reactor Area Discovered Inoperative on 851227.Campus Police Increased Patrols of Facility.Detector Will Be Repaired by 860103 ML20136J4211985-12-11011 December 1985 Forwards Answers to Questions Raised in Re Defueling Procedure for License L-77.Approval Requested as Registered User of Fuel Shipping Packages.Final Procedure Will Be Submitted Following Rev & Review ML20138F7921985-12-0909 December 1985 Forwards Reply to 851115 Request for Addl Info Re Decommissioning of L-77 Research Reactor ML20137R2011985-11-26026 November 1985 Forwards Co Thomas to Ae Profio at Univ of California,Santa Barbara,Believed to Have Been Sent in Error to City of Santa Clara Rather than City of Santa Barbara ML20136H6491985-11-20020 November 1985 Responds to 851011 Request for Addl Info Re L-77 Research Reactor Decommissioning Plan ML20136G1621985-11-15015 November 1985 Requests Written Responses to Encl Questions by 851209 to Continue Evaluation of L-77 Research Reactor Decommissioning Plan ML20136H5111985-10-25025 October 1985 Forwards Rockwell Intl Defueling Procedure to Be Included in Licensee Operations Manual as Section 4.6 ML20138K5011985-10-24024 October 1985 Informs That Commission Requested Ofc of Fr to Publish Encl Notice of Proposed Issuance of Orders Authorizing Disposition of Component Parts & Terminating License R-124, Per 850909 Application ML20138L9141985-10-14014 October 1985 Responds to 850927 Order to Show Cause Re Removal of Spare Highly Enriched U to More Secure Storage Environ.Storage of Spare Fuel Solution in Locked Cabinet in Facility Requested Until Entire Fuel Inventory Returned to DOE ML20205E8071985-10-11011 October 1985 Forwards Request for Addl Info Re Decommissioning Plan. Response Requested by 851121 ML20138C5831985-10-0707 October 1985 Responds to 850927 Order to Show Cause Re Removal of Spare Highly Enriched U to Locked Storage Environ.Reactor Scheduled to Be Decommissioned.Less than 20 G Spare Fuel Solution Exists Outside Reactor Core ML20132B2741985-09-0909 September 1985 Forwards Decommissioning Plan for L-77 Research Reactor, Per Request ML20132B2631985-09-0909 September 1985 Forwards Decommissioning Plan for L-77 Research Reactor, Per Request.Notarized Ltr Sent on 850827 ML20135A4731985-08-23023 August 1985 Forwards Duplicate of Rj Kroes Per NRC Request Re Decommissioning Plan & Environ Rept ML20135A5061985-08-23023 August 1985 Forwards Decommissioning Plan for L-77 Research Reactor & Environ Rept in Support of Decommissioning Plan for L-77 Research Reactor. Application Made to Decommission L-77 Nuclear Training Reactor & Terminate License R-124 ML20128N4011985-07-19019 July 1985 Advises That 850606 Revised Physical Security Plan Consistent W/Provisions of 10CFR50.54(p) & Acceptable ML20126E2791985-06-0606 June 1985 Forwards Updated Revised Physical Security Plan.Plan Withheld (Ref 10CFR2.790) ML20127H3901985-05-16016 May 1985 Ack Receipt of Encl Informing NRC of Steps Taken to Correct Violations Noted in Physical Security Insp.Encl Withheld (Ref 10CFR2.790) IR 05000324/20040101985-04-19019 April 1985 Forwards Safeguards Insp Rept 50-433/85-01 on 850324-0410 & Notice of Violation ML20094F8271984-07-13013 July 1984 Responds to NRC Re Violations Noted in IE Insp Rept.Corrective Actions:Application for Operator Requalification Submitted & Written & Operating Exam Will Be Administered in Aug ML20091B4301984-05-14014 May 1984 Responds to NRC Re Violations Noted in IE Insp Rept.Corrective Actions:Review & Audits by Reactor Operations Committee Accomplished.Items Under D Written Procedures & Records, Completed by 840701 ML20084D2081984-04-18018 April 1984 Forwards Response to NRC Re Violations Noted in Insp on 840123-25.Corrective Actions:Calibr Procedures Revised to Apply to Eberline Area Radiation Monitors & Technical Assoc Monitor ML20080Q7621984-01-26026 January 1984 Forwards 1982 Annual Rept of Reactor Operations ML20069K8401982-10-28028 October 1982 Forwards Public Version of Revised Emergency Plan ML20054L3881982-06-16016 June 1982 Ltr to All Research & Test Reactor Licensees Requesting That Reg Guide 2.6 (for Comment) & ANSI/ANS-15.16 (Draft II Dtd 811129) Be Used to Meet Requirement of Final Amend to 10CFR50.54(r) Re Emergency Planning.Fr Notice Encl ML20041B6771982-02-17017 February 1982 Forwards IE Info Notice 80-32,Revision 1, Clarification of Certain Requirements for Exclusive Use Shipments of Radioactive Matls. W/O Encl ML20039A2431981-12-0202 December 1981 Responds to NRC 811103 Ltr Re Violations Noted in IE Insp Rept.Corrective Actions:Maint Request Form & Log Revised to Necessitate Accurate Recording of Snubber Mods & Installation 1991-06-18 Category:EDUCATIONAL INSTITUTION TO NRC MONTHYEARML20005E3671989-12-21021 December 1989
[Table view]Forwards Executed Amend 7 to Indemnity Agreement E-58, Terminating OL R-124 for L-77 Research Reactor at Univ of California at Santa Barbara ML19327B4971989-10-26026 October 1989 Resubmits Matl Balance Rept for Period Ending 890331 & 0930 to Clarify Pu-Be Neutron Source Status at Reactor. Inconsistency in 890330 Ltr to NRC Resulted from Bookkeeping Error ML20248E6841989-03-30030 March 1989 Requests Termination of License R-124 for 10-watt L-77 Nuclear Training Reactor.Fuel Returned to DOE & Reactor Decommissioned.Final Radiation Survey Performed in Sept 1986.Pu/Be Neutron Source Transferred to State of CA ML20207N1761987-01-0505 January 1987 Forwards Proprietary Final Survey Rept for Univ of California,Santa Barbara,L-77 Reactor Dismantling. No Contamination Noted.Permit for Burial of Radioactive Core vessel-shield Assembly Needed.Encl Withheld ML20202D3931986-06-27027 June 1986 Forwards Response to NRC 860613 Request for Clarification of Earlier Replies to NRC Questions on Decommissioning of L-77 Training Reactor.Expedited Action Requested,As Other Groups Await Release of Space ML20205L0841986-03-24024 March 1986 Forwards Responses to NRC 860220 Followup Questions Re License R-124.Matl W/Radioactivity Below Limits of Reg Guide 1.86 Will Be Disposed of as Radwaste or Released for Unrestricted Use Following NRC Confirmatory Survey ML20214C5251986-02-0707 February 1986 Advises That Defueling Equipment Will Be Setup & Predefueling Radiation Survey Performed on 860218.Shipment of Final Two Containers Will Be Made on 860226 ML20137G4841986-01-0303 January 1986 Advises That Motion Detector Repaired on 860102 & Security Alarm Sys Back to Normal ML20137G6031985-12-31031 December 1985 Informs That Review of Defueling Procedures Delayed Until 860102.Motion Detector in Reactor Area Discovered Inoperative on 851227.Campus Police Increased Patrols of Facility.Detector Will Be Repaired by 860103 ML20136J4211985-12-11011 December 1985 Forwards Answers to Questions Raised in Re Defueling Procedure for License L-77.Approval Requested as Registered User of Fuel Shipping Packages.Final Procedure Will Be Submitted Following Rev & Review ML20138F7921985-12-0909 December 1985 Forwards Reply to 851115 Request for Addl Info Re Decommissioning of L-77 Research Reactor ML20136H6491985-11-20020 November 1985 Responds to 851011 Request for Addl Info Re L-77 Research Reactor Decommissioning Plan ML20136H5111985-10-25025 October 1985 Forwards Rockwell Intl Defueling Procedure to Be Included in Licensee Operations Manual as Section 4.6 ML20138L9141985-10-14014 October 1985 Responds to 850927 Order to Show Cause Re Removal of Spare Highly Enriched U to More Secure Storage Environ.Storage of Spare Fuel Solution in Locked Cabinet in Facility Requested Until Entire Fuel Inventory Returned to DOE ML20138C5831985-10-0707 October 1985 Responds to 850927 Order to Show Cause Re Removal of Spare Highly Enriched U to Locked Storage Environ.Reactor Scheduled to Be Decommissioned.Less than 20 G Spare Fuel Solution Exists Outside Reactor Core ML20132B2741985-09-0909 September 1985 Forwards Decommissioning Plan for L-77 Research Reactor, Per Request ML20132B2631985-09-0909 September 1985 Forwards Decommissioning Plan for L-77 Research Reactor, Per Request.Notarized Ltr Sent on 850827 ML20135A5061985-08-23023 August 1985 Forwards Decommissioning Plan for L-77 Research Reactor & Environ Rept in Support of Decommissioning Plan for L-77 Research Reactor. Application Made to Decommission L-77 Nuclear Training Reactor & Terminate License R-124 ML20135A4731985-08-23023 August 1985 Forwards Duplicate of Rj Kroes Per NRC Request Re Decommissioning Plan & Environ Rept ML20126E2791985-06-0606 June 1985 Forwards Updated Revised Physical Security Plan.Plan Withheld (Ref 10CFR2.790) ML20094F8271984-07-13013 July 1984 Responds to NRC Re Violations Noted in IE Insp Rept.Corrective Actions:Application for Operator Requalification Submitted & Written & Operating Exam Will Be Administered in Aug ML20091B4301984-05-14014 May 1984 Responds to NRC Re Violations Noted in IE Insp Rept.Corrective Actions:Review & Audits by Reactor Operations Committee Accomplished.Items Under D Written Procedures & Records, Completed by 840701 ML20084D2081984-04-18018 April 1984 Forwards Response to NRC Re Violations Noted in Insp on 840123-25.Corrective Actions:Calibr Procedures Revised to Apply to Eberline Area Radiation Monitors & Technical Assoc Monitor ML20080Q7621984-01-26026 January 1984 Forwards 1982 Annual Rept of Reactor Operations ML20069K8401982-10-28028 October 1982 Forwards Public Version of Revised Emergency Plan ML20039A2431981-12-0202 December 1981 Responds to NRC 811103 Ltr Re Violations Noted in IE Insp Rept.Corrective Actions:Maint Request Form & Log Revised to Necessitate Accurate Recording of Snubber Mods & Installation ML19343C7691981-03-17017 March 1981 Forwards Figure 2 to Revised Physical Security Plan.Page Withheld (Ref 10CFR2.790) ML19345F3221981-02-0909 February 1981 Forwards Annual Rept of Operations,1980 ML19318A6301980-06-18018 June 1980 Forwards Revised Physical Security Plan for L-77 Educational Nuclear Reactor.Plan Withheld (Ref 10CFR2.790) ML19312E1801980-05-27027 May 1980 Informs That Revised Physical Security Plan Has Been Completed,Except for Internal Review.Plan Should Be Submitted in Approx 1 Wk ML19309B9091980-03-31031 March 1980 Forwards Annual Rept of Operations,1979. ML19260D9181980-02-0505 February 1980 Requests That All Amends Re Indemnity Agreements E-15,E-16, E-53 & E-58 Be Forwarded to Univ of CA for Approval ML19261D7881979-06-21021 June 1979 Forwards Executed Amend 8 to Indemnity Agreement E-16,Amend 4 to Indemnity Agreement E-58,Amend 8 to Indemnity Agreement E-53 & Amend 13 to Indemnity Agreement E-15 ML19270G8091979-06-15015 June 1979 Forwards Rept on Alterations to Reactor Facility.Physical Security Plan Being Revised to Reflect Rept.Rept Withheld (Ref 10CFR2.790) ML20062G7901979-02-0606 February 1979 Forwards 1978 Annual Rept of Operations for L-77 Reactor, License R-124.Encl Withheld (Ref 10CFR2.790) 1989-03-30 Category:INCOMING CORRESPONDENCE MONTHYEARML20073B9901991-06-18018 June 1991
[Table view]Forwards Rept Summarizing Findings of Orau Review of 59 Docket Files for Terminated Research & Test Reactors ML20070U0301991-03-0606 March 1991 Forwards Ltr from Constituent Je Loder,Requesting Info as to Tightened Security at Nuclear Power Plants,Particularly at Seabrook Station in Light of Middle East Crisis & Accompanying Threats of Terrorism ML20005E3671989-12-21021 December 1989 Forwards Executed Amend 7 to Indemnity Agreement E-58, Terminating OL R-124 for L-77 Research Reactor at Univ of California at Santa Barbara ML19327B4971989-10-26026 October 1989 Resubmits Matl Balance Rept for Period Ending 890331 & 0930 to Clarify Pu-Be Neutron Source Status at Reactor. Inconsistency in 890330 Ltr to NRC Resulted from Bookkeeping Error ML20248E6841989-03-30030 March 1989 Requests Termination of License R-124 for 10-watt L-77 Nuclear Training Reactor.Fuel Returned to DOE & Reactor Decommissioned.Final Radiation Survey Performed in Sept 1986.Pu/Be Neutron Source Transferred to State of CA ML20155B9841988-10-0404 October 1988 Forwards Responses to Issues Identified in FEMA 880901 Exercise Rept of Offsite Emergency Organization.Provides Listing of Activities Planned to Resolve Issues Identified in Rept & Intended Completion Schedule ML20207A3511987-02-19019 February 1987 Requests Review & Comment Re Interim Storage of Reactor Vessel in Secure,Isolated Area.Space Occupied by Vessel Required for Expansion of Free-Electron Laser Research Program ML20207N1761987-01-0505 January 1987 Forwards Proprietary Final Survey Rept for Univ of California,Santa Barbara,L-77 Reactor Dismantling. No Contamination Noted.Permit for Burial of Radioactive Core vessel-shield Assembly Needed.Encl Withheld ML20202D3931986-06-27027 June 1986 Forwards Response to NRC 860613 Request for Clarification of Earlier Replies to NRC Questions on Decommissioning of L-77 Training Reactor.Expedited Action Requested,As Other Groups Await Release of Space ML20205L0841986-03-24024 March 1986 Forwards Responses to NRC 860220 Followup Questions Re License R-124.Matl W/Radioactivity Below Limits of Reg Guide 1.86 Will Be Disposed of as Radwaste or Released for Unrestricted Use Following NRC Confirmatory Survey ML20153F2141986-02-14014 February 1986 Informs of Intent to Assist Univ of California Personnel in Performing Defueling of L-77 Research Reactor on 860218-21. Two Small Check Sources of Less than 0.01 Uci Tc-99 & Th-230 Each Will Be Used ML20214C5251986-02-0707 February 1986 Advises That Defueling Equipment Will Be Setup & Predefueling Radiation Survey Performed on 860218.Shipment of Final Two Containers Will Be Made on 860226 ML20137G4841986-01-0303 January 1986 Advises That Motion Detector Repaired on 860102 & Security Alarm Sys Back to Normal ML20137G6031985-12-31031 December 1985 Informs That Review of Defueling Procedures Delayed Until 860102.Motion Detector in Reactor Area Discovered Inoperative on 851227.Campus Police Increased Patrols of Facility.Detector Will Be Repaired by 860103 ML20136J4211985-12-11011 December 1985 Forwards Answers to Questions Raised in Re Defueling Procedure for License L-77.Approval Requested as Registered User of Fuel Shipping Packages.Final Procedure Will Be Submitted Following Rev & Review ML20138F7921985-12-0909 December 1985 Forwards Reply to 851115 Request for Addl Info Re Decommissioning of L-77 Research Reactor ML20137R2011985-11-26026 November 1985 Forwards Co Thomas to Ae Profio at Univ of California,Santa Barbara,Believed to Have Been Sent in Error to City of Santa Clara Rather than City of Santa Barbara ML20136H6491985-11-20020 November 1985 Responds to 851011 Request for Addl Info Re L-77 Research Reactor Decommissioning Plan ML20136H5111985-10-25025 October 1985 Forwards Rockwell Intl Defueling Procedure to Be Included in Licensee Operations Manual as Section 4.6 ML20138L9141985-10-14014 October 1985 Responds to 850927 Order to Show Cause Re Removal of Spare Highly Enriched U to More Secure Storage Environ.Storage of Spare Fuel Solution in Locked Cabinet in Facility Requested Until Entire Fuel Inventory Returned to DOE ML20138C5831985-10-0707 October 1985 Responds to 850927 Order to Show Cause Re Removal of Spare Highly Enriched U to Locked Storage Environ.Reactor Scheduled to Be Decommissioned.Less than 20 G Spare Fuel Solution Exists Outside Reactor Core ML20132B2631985-09-0909 September 1985 Forwards Decommissioning Plan for L-77 Research Reactor, Per Request.Notarized Ltr Sent on 850827 ML20132B2741985-09-0909 September 1985 Forwards Decommissioning Plan for L-77 Research Reactor, Per Request ML20135A5061985-08-23023 August 1985 Forwards Decommissioning Plan for L-77 Research Reactor & Environ Rept in Support of Decommissioning Plan for L-77 Research Reactor. Application Made to Decommission L-77 Nuclear Training Reactor & Terminate License R-124 ML20135A4731985-08-23023 August 1985 Forwards Duplicate of Rj Kroes Per NRC Request Re Decommissioning Plan & Environ Rept ML20126E2791985-06-0606 June 1985 Forwards Updated Revised Physical Security Plan.Plan Withheld (Ref 10CFR2.790) ML20094F8271984-07-13013 July 1984 Responds to NRC Re Violations Noted in IE Insp Rept.Corrective Actions:Application for Operator Requalification Submitted & Written & Operating Exam Will Be Administered in Aug ML20091B4301984-05-14014 May 1984 Responds to NRC Re Violations Noted in IE Insp Rept.Corrective Actions:Review & Audits by Reactor Operations Committee Accomplished.Items Under D Written Procedures & Records, Completed by 840701 ML20084D2081984-04-18018 April 1984 Forwards Response to NRC Re Violations Noted in Insp on 840123-25.Corrective Actions:Calibr Procedures Revised to Apply to Eberline Area Radiation Monitors & Technical Assoc Monitor ML20080Q7621984-01-26026 January 1984 Forwards 1982 Annual Rept of Reactor Operations ML20069K8401982-10-28028 October 1982 Forwards Public Version of Revised Emergency Plan ML20039A2431981-12-0202 December 1981 Responds to NRC 811103 Ltr Re Violations Noted in IE Insp Rept.Corrective Actions:Maint Request Form & Log Revised to Necessitate Accurate Recording of Snubber Mods & Installation ML19343C7691981-03-17017 March 1981 Forwards Figure 2 to Revised Physical Security Plan.Page Withheld (Ref 10CFR2.790) ML19345F3221981-02-0909 February 1981 Forwards Annual Rept of Operations,1980 ML19318A6301980-06-18018 June 1980 Forwards Revised Physical Security Plan for L-77 Educational Nuclear Reactor.Plan Withheld (Ref 10CFR2.790) ML19312E1801980-05-27027 May 1980 Informs That Revised Physical Security Plan Has Been Completed,Except for Internal Review.Plan Should Be Submitted in Approx 1 Wk ML19309B9091980-03-31031 March 1980 Forwards Annual Rept of Operations,1979. ML19260D9181980-02-0505 February 1980 Requests That All Amends Re Indemnity Agreements E-15,E-16, E-53 & E-58 Be Forwarded to Univ of CA for Approval ML19261D7881979-06-21021 June 1979 Forwards Executed Amend 8 to Indemnity Agreement E-16,Amend 4 to Indemnity Agreement E-58,Amend 8 to Indemnity Agreement E-53 & Amend 13 to Indemnity Agreement E-15 ML19270G8091979-06-15015 June 1979 Forwards Rept on Alterations to Reactor Facility.Physical Security Plan Being Revised to Reflect Rept.Rept Withheld (Ref 10CFR2.790) ML20062G7901979-02-0606 February 1979 Forwards 1978 Annual Rept of Operations for L-77 Reactor, License R-124.Encl Withheld (Ref 10CFR2.790) 1991-06-18 |
Text
-
L Ny y
>m.
UNIVERSITY OF CALIFORNIA, SANTA BARBARA HERKELEY
- DAVIS
- iRVINE
- LOS ANGELES
- HIVERSIDE * $AN DIEGO
- SAN FRANCISCO SANTA BARBARA
- SANTA CRUZ DEI *ARTMENT OF CllEMICAL AND SANTA BARBARA, CALIFORNIA 93106 NUCLEAR ENGINEERING January 5,1987 Mr. John Dosa Division of Licensing U.S. Nuclear Regulatory Commission Washington, DC 20555
Dear Mr. Dosa:
Enclosed is the report on the radiatiion survey of the UCSB L-77 Training Reactor Facility (License R-124), conducted by Rockwell International and checked by UCSB personnel. The survey was done after dismantling the reactor, with only the packaged empty core vessel and, inner shield assembly remaining in the room. We accept the report and note there is no significant contamination of the facility.
UCSB is still awaiting receipt of a variance to permit burial of the slightly radioactive core vessel-shield assembly. The variance is needed because the shield contains lead, although the lead is encapsulated in stainless steel.
Please advise if we should send additional copies of the Rockwell report.
Sincerely, DOM A. Edward Profio Reactor Director AEP:ajr Encl.
eg111So$k
[
h
.