MONTHYEARML20217G4461999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pingp.With ML20216E7151999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pingp,Units 1 & 2. with ML20210Q4891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pingp,Units 1 & 2. with ML20209F9811999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20195G5181999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With . Page 3 in Final Rept of Incoming Submittal Was Not Included ML20206L6191999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Pingp,Units 1 & 2. with ML20205N1081999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pingp,Units 1 & 2. with ML20207J6951999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Prairie Island Nuclear Generating Plant ML20207L2811999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Pingp,Units 1 & 2 ML20206P7861998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Prairie Island Nuclear Generating Plant.With ML20206N2731998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20155K6301998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20154H4061998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Prairie Island Nuclear Generating Plant.With ML20153B0761998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Prairie Island Nuclear Generating Plant.With ML20236X8531998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Prairie Island Nuclear Generating Plant ML20236R0771998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Prairie Island Nuclear Generating Plant ML20249A5751998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Prairie Island Nuclear Generating Plant ML20247G2921998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Prairie Island Nuclear Generating Plant ML20216C6361998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Prairie Nuclear Generating Plant Units 1 & 2 ML20216E2051998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Prairie Island Nuclear Generating Plant ML20216E2121998-01-31031 January 1998 Revised MOR for Jan 1998 for Prairie Island Nuclear Generating Plant for Unit 2 & Narrative Summary of Operating Experience ML20202E7761998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Prairie Island Nuclear Generating Plant ML20198P1541997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Prairie Island Nuclear Generating Plant,Unit 1 & 2 ML20203H4341997-11-30030 November 1997 Monthly Operating Repts for Nov 1996 for Prairie Island Nuclear Generating Plant,Unit 1 ML20199D0701997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Prairie Island Nuclear Generating Plant ML20198J7281997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Prairie Island Nuclear Generating Plant,Units 1 & 2 ML20210S5911997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Prairie Island Nuclear Generating Plant,Units 1 & 2 ML20217J0681997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Prairie Island Nuclear Generating Plant ML20148K3871997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Prairie Island Nuclear Generating Plant,Units 1 & 2 ML20141A9581997-04-30030 April 1997 Monthly Operating Repts for April 1997 for Prairie Island Nuclear Plant ML20137T2891997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Prairie Island Nuclear Plant ML20135F6841997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Praire Island Nuclear Generating Plant ML20134L8831997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Praire Island Nuclear Generating Plant ML20133F8611996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Praire Island Nuclear Generating Plant ML20135E8811996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Prairie Island Nuclear Generating Plant ML20134L7091996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Prairie Island Nuclear Generating Plant ML20128G1741996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Prairie Island Nuclear Generating Plant ML20117N1521996-08-31031 August 1996 Monthly Operating Rept for Aug 1996 for Prairie Island Nuclear Generating Plant ML20116J6451996-07-31031 July 1996 Monthly Operating Rept for Jul 1996 for Prairie Island Nuclear Generating Plant ML20115A8321996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Prairie Island Nuclear Generating Plant Units 1 & 2 ML20117K5811996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Prairie Island Nuclear Generating Plant ML20111B2801996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Prairie Island Nuclear Generating Plant ML20101N8931996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Prairie Island Nuclear Generating Plant Units 1 & 2 ML20101D0671996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for Praire Island Nuclear Generating Plant Units 1 & 2 ML20097D5411996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Prairie Island Units 1 & 2 ML20096E9631995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Prairie Island Nuclear Generating Plant ML20095G4371995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Prairie Island Nuclear Generating Station ML20094L7491995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Prairie Island Nuclear Generating Plant ML20098D0101995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Prairie Island Nuclear Generating Plant ML20092D0091995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Prairie Island Nuclear Plant 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G4461999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pingp.With ML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML20217A1691999-09-22022 September 1999 Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers ML20216E7151999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pingp,Units 1 & 2. with ML20211D3981999-08-24024 August 1999 Safety Evaluation Supporting Requested Actions to Licenses DPR-42 & DPR-60,respectively ML20211C2531999-08-0404 August 1999 Unit 1 ISI Summary Rept Interval 3,Period 2 Refueling Outage Dates 990425-990526 Cycle 19 971212-990526 ML20210Q4891999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pingp,Units 1 & 2. with ML20211B5971999-07-31031 July 1999 Cycle 20 Voltage-Based Repair Criteria 90-Day Rept ML20209J1131999-07-15015 July 1999 Safety Evaluation of Topical Rept NSPNAD-8102,rev 7 Reload Safety Evaluation Methods for Application to PI Units. Rept Acceptable for Referencing in Prairie Island Licensing Actions ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML20209F9811999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20196F4081999-06-23023 June 1999 Revised Pages 71,72 & 298 to Rev 7 of NSPNAD-8102, Prairie Island Nuclear Power Plant Reload Safety Evaluation Methods for Application to PI Units ML20195G5181999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With . Page 3 in Final Rept of Incoming Submittal Was Not Included ML20207B5931999-05-26026 May 1999 SER Accepting Licensee Proposed Alternative to ASME Code for Surface Exam (PT) of Seal Welds on Threaded Caps for Unit 1 Reactor Vessel Head Penetrations for part-length CRDMs ML20196L2501999-05-13013 May 1999 Rev 0 to PINGP Unit 1 COLR Cycle 20 ML20206L6191999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Pingp,Units 1 & 2. with ML20205N1081999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pingp,Units 1 & 2. with ML20205Q5101999-03-15015 March 1999 Inservice Insp Summary Rept Interval 3,Period 1 & 2 Refueling Outage Dates 981109-1229 Cycle 19,970327-981229 ML20207J6951999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Prairie Island Nuclear Generating Plant ML20202J7711999-02-0404 February 1999 Simulator Certification Rept for Prairie Island Plant Simulation Facility,1998 Annual Rept ML20202G3761999-01-31031 January 1999 Non-proprietary Rev 7 to NSPNAD-8102-NP, Prairie Island Nuclear Power Plant Reload SE Methods for Application to PI Units ML20207L2811999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for Pingp,Units 1 & 2 ML20202J1731999-01-22022 January 1999 Safety Evaluation Concluding That NSP Proposed Alternative to Surface Exam Requirements of ASME BPV Code for CRD Mechanism Canopy Seal Welds Will Provide Acceptable Level of Quality & Safety ML20206P7861998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Prairie Island Nuclear Generating Plant.With ML20205H0561998-12-31031 December 1998 Northern States Power Co 1998 Annual Rept. with ML20198J6441998-12-17017 December 1998 Rev 0 to PINGP COLR Unit 2-Cycle 19 ML20206N2731998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20196D7341998-11-20020 November 1998 Third Quarter 1998 & Oct 1998 Data Rept for Prairie Island Isfsi ML20155K6301998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Prairie Island Nuclear Generating Plant,Units 1 & 2.With ML20154H4061998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Prairie Island Nuclear Generating Plant.With ML20202J7991998-09-30030 September 1998 Non-proprietary Version of Rev 3 to CEN-629-NP, Repair of W Series 44 & 51 SG Tubes Using Leaktight Sleeves,Final Rept ML20198P0571998-09-0303 September 1998 Rev 1 to 95T047, Back-up Compressed Air Supply for Cooling Water Strainer Backwash Valve Actuator ML20153B0761998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Prairie Island Nuclear Generating Plant.With ML20237A3961998-08-11011 August 1998 Safety Evaluation on Westinghouse Owners Group Proposed Insp Program for part-length CRDM Housing Issue.Insp Program for Type 309 Welds Inadequate from Statistical Point of View ML20237A8171998-08-0505 August 1998 SER Related to USI A-46 Program GL 87-02 Implementation for Prairie Island Nuclear Generating Plant,Units 1 & 2 ML20236X8531998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Prairie Island Nuclear Generating Plant ML20236R6481998-07-15015 July 1998 Metallurgical Investigation & Root Cause Assessment of Part Length CRDM Housing Motor Tube Cracking at PINGP Unit 2 - Preliminary Summary Rept ML20236R0771998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Prairie Island Nuclear Generating Plant ML20249A5751998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Prairie Island Nuclear Generating Plant ML20247G7011998-05-31031 May 1998 Metallurgical Investigation & Root Cause Assessment of Part Length CRDM Housing Motor Tube Cracking at Prairie Island Nuclear Generating Plant,Unit 2 ML20248M0561998-05-31031 May 1998 Rev 5 to CEN-620-NP, Series 44 & 51 Design SG Tube Repair Using Tube Rerolling Technique ML20247E2671998-05-0505 May 1998 Rev 0 to Pingp,Units 1 & 2,Pressure & Temp Limits Rept (Effective Until 35 Efpy) ML20247G2921998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Prairie Island Nuclear Generating Plant ML20217M6901998-04-29029 April 1998 Safety Evaluation Accepting Methodology for Relocation of Reactor Coolant Sys P/T Limit Curves & LTOP Sys Limits Proposed by NSP for Pingp,Units 1 & 2 ML20216C6361998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Prairie Nuclear Generating Plant Units 1 & 2 ML20216H0341998-03-31031 March 1998 Cycle-19 Voltage Based TSP Alternate Repair Criteria 90-Day Rept ML20217D2041998-03-13013 March 1998 Rev 1 to 28723-A, Intake Canal Liquefaction Analysis Rept for Pingp,Welch,Mn ML20236P9801998-03-12012 March 1998 Rev 0 to 97FP02-DOC-01, Compliance Review of 10CFR50,App R, Section Iii.O RCP Lube Oil Collection Sys ML20248L3931998-03-10010 March 1998 ISI Summary Rept Interval 3,Period 1 & 2 Refueling Outage Dates 971018-971212 Cycle 18,960303-971212 ML20216D0911998-03-0606 March 1998 Rev 0 to Prairie Island Generating Plant,Units 1 & 2, Pressure & Temp Limits Rept 1999-09-30
[Table view] |
Text
r. - .'
HeBBeIIVE_SuddeBX_DE_DEEEeIING_EXEEEIENCE
{
DOCKET NO. 50-282 UNIT PRAIRIE ISLAND HQ 1_
DATE JANUARY 5, 1987 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121 dDUIU1__ DECEMBER __1286__
THE UNIT WAS BASE-LOADED THIS MONTH. ON THE 4TH POWER WAS REDUCED TO 99.5% TO ASSURE THAT IT WOULD NOT EXCEED THE LICENSE THERMAL LIMIT.
AT 1553 0F THE.12TH THE UNIT WAS TRIPPED Wii!LE TRYING TO FIND A PROBLEM WITH THE TURBINE CONTROL SYSTEM. THIS ENDED A CONTINUOUS RUN OF 245 DAYS. THE PROBLEMS WERE CORRECTED AND THE UNIT RETURNED TO SERVICE ON THE 13TH AT 1004.
ON THE'27TH AT 0947 AN NUE WAS DECLARED ~.UE TO BOTH DIESEL COOLING WATER PUMPS BEING OUT OF SERVICE. ACTION WAS TAKEN TO BRING THE UNIT TO A HOT-SHUTDOWN CONDITION. TWENTY MINUTES LATER NUMBER 12 COOLING WATER PUMP WAS REPAIRED THUS ENDING THE NUE. THE UNIT THEN RETURNED TO NORMAL OPERATION. THERE WERE NO OTHER ITEMS TO REPORT.
1 i
$s9+
eVEEeGE_DeILY_UNII_EQWEB_ LEVEL DOCKET NO. 50-282 UNIT PRAIRIE ISLAND HQ.i_
DATE JANUARY 5,-1987 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121 j
HQHIBl__DECEMBEE__1286__
DeY eVEBeGE_DeILY_EDWEB_ LEVEL _idWE: HEIL 1 524 2 529 3 527 4 524 5 526 6 524 7 494 8- 525 9 521 10- 526 11 523 12 342 13 249 14 525 15 --
525 16 525 17 527 '
18 528 19 526 20 528 21 524 22 527 23 525 24 525 25 528
! 26 526 27 525 28 526 29 527 30 525 31 526 AVERAGE LOADS ABOVE 503 MWE-NET ARE DUE TO COOLER CONDENSER CIRCULATING WATER
DEEEGIING_DeIe_EEEDEI DOCKET NO. 50-282 UNIT PRAIRIE ISLAND N0.1 DATE JANUARY 5, 1987 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121 DEEBoIIH5_IIGIUS -
- 1. UNIT NAME: EEeIBIE_ISLeUD_NO._1 ______________________
- 2. REPORTING PERIOD:__DECEMBE8__1286___ l NOTES: l
- 3. LICENSED THERMAL POWER (MWT): 1650 l l
- 4. NAMEPLATE RATING (GROSS MWE)- 593 l l S. DESIGN ELECTRICAL RATING (NET MWE)? 530 l I
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 534 l 1
- 7. MAXIMUM DEPENDADLE CAPACITY (NET MWE): 503 1____________________1
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT GIVE REASON: NOME _______________________________
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE), _UQUE______________
- 10. REASONS FOR RESTRICTIONS, IF ANY:__UDNE_______________________________
IBIS _dQUIB YB:IO:DeIE CUdULeIIVE
- 11. HOURS IN REPORTING PERIOD 744 8760 114336
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 729.7 7898.1 95255.6
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 5571.1
- 14. HOURS GENERATOR ON-LINE 725.8 7871.3 93873.7
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1182969 12238355 147606968
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 399250 4060720 48261990
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 379216 3819563 45247397
- 19. UNIT SERVICE FACTOR 97.6 89.9 82.1
- 20. UNIT AVAILABILITY FACTOR 97.6 89.9 82.1
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 101.3 86.7 70.7
- 22. UNIT CAPACITY FACTOR (USING DER NET) 96.2 82.3 74.7
- 23. UNIT FORCED OUTAGE RATE 2.4 0.3 7.0
- 24. FORCED OUTAGE HOURS 18.2 24.3 7112.3
- 25. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH)
_ __ _ _ _ _ _ _ _ _ _ _ _ _ _8 E E U E L IE G _ Q U IG G E _ Q U _ e E B I L _ B i _12 0 I _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
- 26. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATE:________Ule_______________
[
UNII_SBUIDOWNS_eND_EDWEB_EEDUCIION DOCKET NO 50-222_
UNIT NAME EEGIBIE_ISLeND_ND.i DATE JeNueBY_5._1282___ ~
COMPLETED BY DELE _DUGSIeD TELLEPHONE 612-388-1121
'dQNIBl_ DECEMBER __1286______
DeIE IXEE UQUBS. BEeSON MEIUDD LER_NUMBE8 SYSIEd CadEONENI YY/MM/DD 000.0 06/12/07 S 0.0 B 5 N/A N/A N/A TURBINE VALVES TESTING.
86/12/12 F -
18.2 B 3 86-010 TA N/A TRIP CAUSED BY A GROUND SHORT OF THE EH SYSTEM.
86/12/27 F 0.0 A 5 86-011 BI N/A NUE DUE TO LOSS OF BOTH DIESEL COOLING WATER PUMPS.
IXEE BEeSON -- dEIUDD SXIIEd_ CODE F-FORCED A-EQUIPMENT FAILURE 1-MANUAL DRAFT IEEE STD S-SCHED D-MAINTENANCE OR TEST 2-MANUAL TRIP 805-1984(P805-D5)
C-REFUELING 3-AUTO TRIP D-REGULATORY RESTRICTION 4-CONTINUED E-OPERATOR TRAINING & 5-REDUCED LOAD C0dEONENI_ CODE LICENSE EXAMINATION 9-0THER F-ADMINISTRATIVE IEEE STD 803A-1983 G-OPERATOR ERROR H-0THER
HeBB&IIVE_SuddeBY_DE_DEEEeIING_EXEEBIENCE DOCKET NO. 50-306
^
UNIT PRAIRIE ISLAND HQ 2 DATE JANUARY 5, 1987 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121 dOUIH1__DECEMBEE__1296__
THE UNIT WAS BASE LOADED THIS MONTH.
DURING THE FIRST FEW DAYS POWER WAS REDUCED TO 97% DUE TO FQ LIMIT.
ON THE 4TH POWER WAS REDUCED TO 99.5% TO ASSURE THAT IT WOULD NOT EXCEED THE LICENSE THERMAL LIMIT.
ON THE 27TH AT 0947 AN NUE WAS DECLARED DUE TO BOTH DIESEL COOLING WATER PUMPS BEING OUT OF SERVICE. ACTION WAS TAKEN TO BRING THE UNIT TO A HOT SHUTDOWN CONDITION. TWENTY MINUTES LATER NUMBER 12 COOLING WATER PUMP WAS REPAIRED THUS ENDING THE NUE. THE UNIT THEN RETURNED TO NORMAL OPERATION.
ON THE 31ST AT 0259 POWER WAS REDUCED TO 75% TO ALLOW WORK ON THE REHEATER STOP VALVE. THE WORK WAS COMPLETED AND THE UNIT RETURNED TO 99.5% POWER AT 1143 0F THE SAME DAY. THERE WERE NO OTHER ITEMS TO REPORT.
l
eVEBeGE_DeILY_UNII_EQWEB_ LEVEL DOCKET NO. 50-306 UNIT PRAIRIE ISLAND N0.2 DATE JANUARY 5, 1987 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-ii21 dQUIBl__DECEMBEB__1286__
DeY eMEBeGE_DeILY_EQWEB_LEYEL_idWE:NEIl 1 509 2 526 3 526 4 523 5 526 6 528 7 --
529 8 528 9 524 10 530 11 526 12 528 13 526 14 527 15 527 16 526 17 527 18 528 19 528 20 527 21 528 22 528 23 528 24 529 25 485 26- 512 27 522 28 528 29 526 30 526 31 483 AVERAGE LOADS ABOVE 500 MWE-NET ARE DUE TO COOLER' CONDENSER CIRCULATING WATER
OEEBoIING_DoIo_EEEDEI DOCKET NO. 50-306_
UNIT PRAIRIE ISLAND HQ 2 DATE JANUARY 5, 1987 COMPLETED BY DALE DUGSTAD TELEPHONE 612-388-1121 QEEEoIING_SIGIUS
- 1. UNIT NAME: EEoIBIE_ISLoND_NO _2 ______________________
- 2. REPORTING PERIOD:__DECEdBEE__1286___ l NOTES: l
- 3. LICENSED THERMAL POWER (MWT)- 1650 l l
- 4. NAMEPLATE RATING (GROSS MWE): 593 l l S. DESIGN ELECTRICAL RATING (NET MWE): 530 I i
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 531 l l
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 500 1____________________1
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7)
SINCE LAST REPORT GIVE REASON: __NONE______________________________
~
~ ~ ~~
- 9. PUUER LEVEU TU UsiCA RESER56YED[~5F AU "iUET 5UEII~[UQUE((~_((((((~[_~__
- 10. REASONS FOR RESTRICTIONS, IF ANY:__NQUE_______________________________
IUIS_dQUIB YE:IO:DoIE CUbuLoIIVE
- 11. HOURS IN REPORTING- PERIOD 744 8760 105454
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 7972.1 91475.4
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1516.1
- 14. HOURS GENERATOR ON-LINE 744.0 7932.3 90434.8
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1202646 12326965 141999356
- 17. GROSS ELECTRICAL ENERGY GENERATED (MWH) 408450 4091000 45817080
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 389145 3860117 43349404
- 19. UNIT SERVICE FACTOR --
100.0 90.6 85.8
- 20. UNIT AVAILABILITY FACTOR 100.0 90.6 85.8
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 104.6 08.1 8 2 . '. '
- 22. UNIT CAPACITY FACTOR (USING DER NET) 98.7 83.1 77.6
- 23. UNIT FORCED OUTAGE RATE 0.0 0.5 3.5
- 24. FORCED OUTAGE HOURS 0.0 43.5 3253.1
- 25. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH)
________________________________U_2_o__________________________________
- 26. IF CURRENTLY SHUTDOWN ESTIMATED STARTUP DATEl_____N.Z_o_______________
p- 3 UNII_SBUIDOWHS_eUD_EDWEE_EEDUCIION DOCKET'NO 50-306_
UNIT NAME EEeIEIE_ISLeND_NO.2 DATE JeUUeEY_5 _12B2___ .
COMPLETED BY DELE _DUGSIeD TELLEPHONE 612-388-1121 dQUIBl_DECEMBEE__1286______
DeIE IYEE' UQUES EEeSON dEIUDD LEE _HudBEE SYSIEd CQdEQUENI YY/MM/DD 0A0.0 86/12/25 5 0.0 B 5 N/A N/A- N/A TURBINE VALVES TESTING.
'86/12/26 S 0.0 F 5 N/A N/A N/A LOAD FOLLOW PER SYSTEM DISPATCH.
86/12/27 F 0.0 A 5 86-011 BI N/A NUE DUE TO LOSS OF BOTH DIESEL COOLING WATER PUMPS.
86/12/31 S~ 0.0 B 5' N/A N/A N/A NEED-TO REPAIR REHEATER STOP VALVE.
IYEE EEeSON dEIHOD SYSIEd_ CODE F-FORCED A-EQUIPMENT FAILURE 1-MANUAL DRAFT IEEE STD S-SCHED B-MAINTENANCE'OR TEST 2-MANUAL TRIP 805-1984(P805-D5)
C-REFUELING 3-AUTO TRIP D-REGULATORY RESTRICTION 4-CONTINUED E-OPERATOR TRAINING & 5-REDUCED LOAD C0dEQUENI_ CODE LICENSE EXAMINATION 9-0THER F-ADMINISTRATIVE IEEE STD 803A-1983 G-OPERATOR ERROR H-0THER i
b ,
W Northern States Power Company 414 Nicollet Mall Minneapohs. Minnesota 55401 Telephone (612) 330-5500 January 7, 1987 Prairie Island Technical Specification Section 6.7.A.3 U S Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 PRAIRIE ISLAND NUCLEAR GENERATING PLAhf Docket No. 50-282 License No. DPR-42 50-306 DPR-60 Monthly Operating Report December. 1986 Attached is the Monthly Operating Report for December, 1986 for the Prairie Island Nuclear Generating Plant.
Od Mw s David Musolf Manager of Nuclear Support Se rvice s DMM/EFE/ dab c: Director Office of Resource Management Regional Administrator-III, NRC NRR Project Manager, NRC NRC Resident Inspector MPCA j Attn: J W Ferman Attachment l