Ltr Contract:Mod 2 to Task Order 1 Under Contract NRC-04-97-039
ML20207M259
Person / Time
Issue date: 03/10/1999
From: Pool S
NRC OFFICE OF ADMINISTRATION (ADM)
To: Aufmuth M
SCIENTECH, INC.
References
CON-FIN-F-6122, CON-NRC-04-97-039, CON-NRC-4-97-39 NUDOCS 9903190035
Download: ML20207M259 (3)


Text

..

n =tou p

'4 UNITED STATES g

j NUCLEAR REGULATORY COMMISSION e

WASHINGTON, D.C. 20066 4 001

'%g*

' R8 l5 gg Scientech, Inc ATTN: Shirley Afable 11140 Rockville Pike Suite 500 Rockville, Maryland 20852

Dear Ms. Afable:

SUBJECT:

MODIFICATION NO. 2 TO TASK ORDER NO.1 UNDER CONTRACT NO. NRC-04-97-039 In accordance with Section G.5, Task Order Procedures, of the subject contract, this letter definitizes Task Order No.1 Modification No. 2. This effort shall be performed in accordance with the enclosed Statement of Work.

The period of performance for Task Order No.1 remains December 18,1998 through October 31,1999. The total estimated cost for full performance of this task order is increased by

$89,983 from $935,425 to $1,025,408 of which $958,325 represents the estimated costs and

$67,083 represents the fixed fee. Funds in the amount of $89,983 are hereby obligated for performance of this task order modification. The total funds obligated on this task order is thereby increased from $827,860.59 to $917,843.59 of which $857,797.50 represents the funded estimated costs and $60,046.09 represents the funded fixed fee. All other terms and conditions remain unchanged. Accounting data for Task Order No.1 Modification No. 2 is as follows:

B&R No.: 960-60-40-171-0 Job Code: F6122.

BOC Code: 252A RES ID: RES-C99-391 Appropriation No.: 31X0200 Obligated Amount This Action: $89,983 FY NRC 99 Obligations: $612,860.59 FY 99 Foreign Fund (F job Code) Obligations $364,983

/

n

/g o /

g 31 g 990310 NRC-04-97-039 pon s

-j

a i,Lv

2 l

{

Scientech NRC-04-97-039 TO#1 MOD 2

~

Page 2 of 2

~

l l

Please indicate your acceptance of this task order by having an official, authorized to bind your organization, execute three copies of this document in the space provided and retum two copies to the Contract Specialist. You should retain the third copy for your records.

Sincerely, l

/

tephen ool, Cont, eting Officer Division of Contracts and Proiprty Management

Enclosure:

. As stated ACCEPTED: TASK ORDER NO.1 NAME Melissa. Aufmuth Cer.tr: cts Manager TITLE 3ltol9 %

DATE

l MOD 2 TO TASK ORDER #1 UNDER NRC-04-97-039 t

9.

RELAP5/SCDAP Coupling Under this subtask, the RELAPS/SCDAP code will be decoupled and then recoupled using the PVM approach. SCDAP currentlyis embedded in the RELAPS/SCDAP code.

SCDAP needs to be decoupled to an independent code prior to future thermal-hydraulics code coupling. Decoupling of RELAPS/SCDAP will mainly be performed by the SCDAP contractor. ' Scientech needs to provide support and monitor the decoupling effort to ensure that the decoupled SCDAP code meets certain standards for the PVM coupling.

After decoupling of SCDAP, a RELAPS specific interface, a SCDAP specific interface and a general interface routines shall be' developed in the same manner as those for

ARCS /RELAP5 coupling.

The RELAP5 Specific Interface communicates with the General interface through PVM calls. It processes the control buffers and data for PVM, sending to and receiving from SCDAP. A process control for the coupled code also needs to be designed.

The SCDAP specific interface communicates with the General Interface through PVM calls, it processes the.:ontrol buffers and data for PVM, sending to.and receiving from RELAP5. A process control for the coupled code also needs to be designed.

RELAP5 and SCDAP communication will be through the General Interface. A current available General interface for PARCS/RELAPS coupling can be modified to meet the present needs.

Completion Date:

9/30/99 i

e