ML20207M115
| ML20207M115 | |
| Person / Time | |
|---|---|
| Site: | Rancho Seco |
| Issue date: | 10/11/1988 |
| From: | Croley B SACRAMENTO MUNICIPAL UTILITY DISTRICT |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| RTR-REGGD-01.099, RTR-REGGD-1.099 AGM-NTS-88-267, GL-88-11, NUDOCS 8810180115 | |
| Download: ML20207M115 (1) | |
Text
- - - -
OSMUD l
SACRAMENTO MUNICt.*AL UTILITY DISTRICT O P. O. Box 15830, Sacramento CA 95852 1830,(916)45' 3211 AN ELECTRIC SYSTEM SERVING THE PEART OF CALIFCRNIA AGM/NTS88-267 October 11, 1988 U. S. Nuclear Regulatory Commission Attn: Document Control Desk HashirM 9n, DC 20555 Docket No. 50-312 Rancho Saco Nuclear Generating Station License No. DPR-54 NRC POSITION ON RADIATION IMBRITTLEMENT OF REACTOR VESSEL MATERIALS AND ITS IMPACT ON PLAllT OPERATIONS (GENERIC LETTER 88-11)
Attention: George Knighton Generic Letter 68-11 presents Revision 2 to Regulatory Guide 1.99, Radiation Embrittlement of Reactor Vest.el Materials.
Each licensee is required to provide a response within 180 days of the effective date (May 1988) of the Regulatory Guide.
The District, as a member of the B&W Owners Group, has had several discussions with members of the NRC Staff.
The District understands that an acceptable response time is 180 days from issuance of Genaric Letter 88-11 (July 12, 1988).
The District will submit the required response to Generic Letter 88-11 on or before January 9, 1989.
Members of your staff with questions requiring additional information or clarification may contact Mr. Dave Swank at (209) 333-2935, extension 4920.
Sincerely, s
B. G. Croley Assistant General Manager Nuclear Technical Services cc:
A. D'Angelo, NRC, Rancho Seco J. B. Martin, NRC, Halnut Creek 0l 0
8910180115 estogg f
{DR ADOCK 05000312
'iO PDC l
RANCHO SECO NUCLEAR GENERATING STATloN O ' 4440 Twin Cities Road, Herald, CA 95638 9799;(209) 333 2935 1
i
._ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _