Amend 124 to License NPF-3,revising Tech Spec 3.3.2.2,Table 3.3-11, Steam & Feedwater Rupture Control Sys, to Reflect Design Mod That Simplifies Manual Initiation
ML20207L938
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 10/05/1988
From: Hannon J
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20207L942 List:
References
NUDOCS 8810180031
Download: ML20207L938 (5)


Text

.. _.

o cee UNITED 8TATEs o,'f NUCLEAR REGULATORY COMMISS!ON l

i wasmNGTON, D. C. 20666 I

\\...../

TOLEDO EDISON COMPANY A,[L f

THE CLEVELAND ELECTRIC ILLUMINATING COMPANY l

DOCKET NO. 50-346 i

DAVIS-BESSE NUCLEAR POWER STATION UNIT NO. 1 AMEN 0 MENT TO FACILITY OPERATING LICENSE i

Amendment No. 124 License No. NPF-3 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendment by the Toledo Edison Company and The Cleveland Electric illuminating Company (the licensees) dated January 30, 1988 complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Cocinission's r

rules and regulations set forth in 10 CFR Chapter I; I

B.

The facility will operate in conformity with the application, the l

provisions of the Act, and the rules and regulations of the 1

Comission; i

i C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and i

safety of the public, and (11) that such activities will be i

conducted in conpliance with the Comission's regulations; j

D.

The issuance of this amendment will not be inimical to the consnon j

defense and security or to the health and saisty of the public; and i

E.

The issuance of this amendnent is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied, i

2.

Accordingly, the license is amended by changes to the Technical f

Specifications as indicated in the attachment to this license amendment, j

aad paragraph 2.C.(2) of facility Operating License No. NPF-3 is hereby amended to read as follows:

i 8910180031 631005 PDR ADOCK 05000346 P

pnc

(a) Technical Specifications The Technical Specifications ccntained in Appendices A and B, as revised through Amendment No.124, are hereby incorporated in the license. The Toledo Edison Company shall operate the facility in accordance with the Technical Specifications.

3.

This license amendment is effective as of its date of issuance and shall be implemented not later than November 19, 1988.

FOR THE NUCLEAR REGULATORY COMMISSION l

l

.Lt-John N. Hannon, Director Project Directorate III-3 l

Division of Reactor Projects - !!!, IV, I

V, & Special Projects j

Attachment:

Changes to the Technical Specifications Date of Issuance: October 5,1988 i

l 4.

ATTACHMENT TO LICENSE AM,ENOMENT NO.124 FACILITY OPERATING LICENSE NO. NPF-3

, DOCKET NO. 50-346 j

i l

Replace the following pages of the Appendix "A" Technical Specifications with the attached pages. The revised pages are identified by amendment number and contain vertical lines indicating the area of change. The corresponding t

l overleaf pages are also provided to maintain document completeness, i

Remove Insert

]

1 3/4 3-26 3/4 3-26 l

[

1 i

r l

I t

r ll i

{

1 i

i 4

1

]

t i

i i

l I

J

]

I E.

f I

es a

t; 4,g TAltLE 3.3-1IJ C.ntinne.I)

E STEAM AND FEEDWATER RUPTifRE CONTROL SYSTEM INSTRtNElrTATION 9.

4 MINIMUtf TOTAL PO.

CMAlWfELS CHANNELS FUNCTIONAL UNIT OF CHANNELS TO TRIP OPERABLE ALTION 2.

Feedwater/ Steam Generator I

l Differential Press.are - High Instrument ChanacIs 2

1 2

13#

w m.

PDS 2685A Feedwater/ Steam Generator 2 Channel 2 4-PDS 2685B Feedwater/ Steam Generator 2 Channel 2 w

la b.

PDS 2685C Feedwater/ Steam Ocncrator 2 ChanncI 1 PDS 268SD Feedwater/ Steam Generator 2 Chanac1 I c.

PDS 2686A Feedwater/ Steam Generator I Channel 1 PDS 2686B Feedwater/ Steam Generator I ChanacI I l

l l

d.

PDS 2686C Feedwater/ Steam Cencrator 1 Channel 2 I

PDS 26860 Feedwater/ Steam Generator I Channel 2

(

g i

3.

Steam Generator Level - Low instrument Channels 2

1 2

13#

N a.

LSLL SP988 Steam Generator i Channel I y

LSLL SF999 Steam Generator I Channel 1 s-a.

LSLL SP9A6 Steam Generator 2 Channel I LSLL SP9A7 Steam Generator 2 Channel I l

a.

LSLL SP9AS Steam Generator 2 Channel 2 LSLL SP9A9 Steam Generator 2 Channel 2 I

(

(

52 M

N TARII 3.3-11 (Continued) g STEAM AND FEEIMdATER RtIPTURE CONTROL SYSTEM INSTRtWENTATION

3 MINIMUM TOTAL NO.

CHAIREELS CMANNELS FvNCTIONAL tlNIT OF CMANNELS TO TRIP OPERABIE ACTION

~!

3.

Steam Generator Level - Ima Instrument Channels (continued) d.

LSLL SP996 Steam Generator 1 Channel 2 y

)

LSLL SP987 Steme Generator 1 Channel 7 4.

Loss of RCP Channels 2

1 2

13s, 5.

Manual Initiation (Push buttons) a.

Initiate AFFT fl 1

1 1

14 i

b.

Initiate AFFT #2 1

1 1

14 c.

Initiate AFFT #1 and Isolate SG #1 1

1 1

14 d.

Initiate AFFT #2 and Isolate SG #2 1

1 1

14 i

1 i