ML20207L479

From kanterella
Jump to navigation Jump to search
Amend 100 to License NPF-58,revising TS Surveillance Requirement 3.6.1.3.4 to Permit Removal of Inclined Fuel Transfer Sys Primary Containment Blind Flange While Primary Containment Integrity Required
ML20207L479
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 02/24/1999
From: Pickett D
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20207L482 List:
References
NUDOCS 9903180151
Download: ML20207L479 (5)


Text

,

E84 t/.

  • g 1

UNITED STATES

s j

NUCLEAR REGULATORY COMMIS810N

~

\\...../

WASHINGTON, D.C. 30005 4 001 FIRSTENERGY NUCLEAR OPERATING COMPANY DOCKET NO. 50-440 PERRY NUCLEAR POWER PLANT. UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.100 License No. NPF-58 1.

The U.S. Nuclear Regulatory Corrmission (the Commission) has found that:

A.

The application for amendment by the Cleveland Electric illuminating Company (CEICO), Centerior Service Company, Duquesne L8ght Company, Ohio Edison Company, OES Nuclear, Inc., Pennsylvania Power Company, and Toledo Edison Company (the licensees at the time of the application; FirstEnergy Nuclear Operating Company became the sole licensed operator on January 1,1999) dated August 31, 1998, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in

~ 10 CFR Chapter I; B.

The facility wi:1 operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safaty of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

'Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, anJ paragraph 2.C.(2) of Facility Operating License No. NPF-58 is hereby amended to read as follows:

9903180151 990224 PDR ADOCK 05000440 P

PDR a

v +

1 i

(2). Technical Specifications J

i The Technical Specifications contained in Appendix A and the Environmental Protection Plan contained in Appendix B, as revised through Amendment No.100 are hereby incorporated into this license. FENOC shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

~

3.

This license amendment is effective as of its date of issuance and shall be implemented not later than 90 days after issuance.

i FOR THE NUCLEAR REGULATORY COMMISSION d

Douglas V. Pickett, Senior Prnject Manager Project Directorate ill-2 Division of Licensing Project Management Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications i

Date of Issuance: February 24,~ 1999 l

l

y ATTACHMENT TOllCENSF AMENDMENT NO.100 FACILITY OPERATING LICENSE NO. NPF-58 DOCKET NO. 50-440 Replace the following page of the Appendix "A" Technical Specifications with the attached page. The revised page is identified by Amendment number and contains a verticalline indicating the area of change.

Remove Insert TS 3.6-16 TS 3.6-16 TS 3.6-16a ww..m.mm.-e

o*

PCIVs 3.6.1.3 j

j 1

SURVEILLANCE FRE0VENCY SR 3.6.1.3.3


NOTES------------------

1.

Only required to be met in MODES 1. 2.

j and 3.

2.

Valves and blind flanges in high radiation areas may be verified by use i

of administrative means.

4 3.

Not required to be met for PCIVs that are open under administrative controls.

Verify each primary containment isolation 31 days manual valve and blind flange that is located outside primary containment, drywell, and steam tunnel and is required to be closed during accident conditions is closed.

(continued) q PERRY - LNIT 1 3.6-16 AiuMel No.100

PCIVs 5-3.6.1.3 SLRVEIUMCE REQUIREENTS (continued)

SURVEILLANCE FREQUENCY SR 3.6.1.3.4


NOTES------------------

1.

Only required to be met in MODES 1. 2.

and 3.

2.

Valves and blind flanges in high radiation areas may be verified by use of administrative means.

3.

Not required to be met for PCIVs that are open under administrative controls.

4.

Not required to be met for the Inclined Fuel Transfer System (IFTS) penetration when the associated primary containment blind flange is removed. provided that the Fuel Handling Building Fuel Transfer Pool water level is maintained 240' and the IFTS transfer tube drain valve remains closed. The IFTS transfer tube drain vahe may be opened under administrative controls.

Verify each primary containment isolation Prior to manual valve and blind flange that is entering located inside prin,ary containment.

MODE 2 or 3 drywell, or steam tunnel and is required from MODE 4.

1 to be closed during accident conditions is if not closed.

performed within the previous 92 days (continued)

PERRY - LNIT 1 3.6-16a Avdient No.100 L