ML20207L015
| ML20207L015 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 09/30/1986 |
| From: | Loignon G, Nauman D SOUTH CAROLINA ELECTRIC & GAS CO. |
| To: | Barry L NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| References | |
| NUDOCS 8701090589 | |
| Download: ML20207L015 (5) | |
Text
.
Director, Office of Resource Management September Monthly Operating Report Page 1 ATTACHMENT I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE 10/07/86 COMPLETED BY G. A. LOIGN0N TELEPHONE (803) 345-5209 MONTH AUGUST 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1.
885 17.
882 2.
885 18.
882 3.
885 19.
851 4.
885 20.
429 5.
883 21.
827 6.
884 22.
876 7.
882 23.
878 8.
883 24.
879 9.
883 25.
878 10.
884 26.
880 11.
883 27.
880 12.
883 28.
880 13.
880 29.
881 14.
881 30.
881 15.
881 16, 881 Nk 00!K b56bbh9 W#0 R
Pon
'b (;
\\\\\\
Director, Office of Resource Management September Monthly Operating Report Page 2 ATTACHMENT II OPERATING DATA REPORT DOCKET NO. 50/395 UNIT V. C. SUMER I DATE 10/07/86 COMPLETED BY G. A. LOIGNON TELEPHONE (803) 345-5209 OPERATING STATUS 1.
Reporting Period:
September 1986 Gross Hours in Reporting Period: 720 2.
Currently Authorized Power Level (MWt):
2775 Max. Depend. Capacity (MWe-Net):
885 Design Electrical Rating (MWe-Net):
900 3.
Power Level to which restricted (If Any)(MWe-Net):
N/A 4.
Reasons for Restrictions (If Any):
N/A THIS MONTH YR TO DATE CUMULATIVE 5.
Number of Hours Reactor Was Critical 720.0 6322.8 18.316.1 6.
Reactor Reserve Shutdown Hours 0.0 0.0 0.0 7.
Hours Generator on Line 720.0 6261.9 17.902.2 8.
Unit Reserve Shutdown Hours 0.0 0.0 0.0 9.
Gross Thermal Energy Generated (MWh) 1.957.929 17.013.383 46.850.949
- 10. Gross Electrical Energy Generated (MWh) 648.090
- 5.655.920 15.586.579
- 11. Net Electrical Energy Generated (MWh) 621.873 5.418.840 14.841.478
- 12. Reactor Service Factor 100.0 96.5 76.0
- 13. Reactor Availability Factor 100.0 96.5 76.0
- 14. Unit Service Factor 100.0 95.6 74.3
- 15. Unit Availability Factor 100.0 95.6 74.3
- 16. Unit Capacity Factor (U:ing MDC) 97.6
%ji 69.6
- 17. Unit Capacity Factor (Using Design MWe) 96.0 91.9 68J
- 18. Unit Forced Outage Rate 0.0 4.4 7.0 l
- 19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refuelina. March 6. 1987. 60 Days 20.
If Shut Down at End of Report Period. Estimated Date of Startup:
N/A
- 21. Units in Test Status (Prior to Commercial Operation):
N/A FORECAST ACHIEVED Initial Criticality N/A 10-22-82 Initial Electricity N/A 11-16-82 Commercial Operation N/A 01-01-84 i
i
}
Director, Office of Resource Management S ptember Monthly Operating Raport Page 3 d
ATTACHMENT III UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE 10/07/86 COMPLETED BY G. A. LOIGNON TELEPHONE (803) 345-5209 Method of TYPE Shutting F or S Duration Down the Corrective Actions /
No.
Date Reason Forced or (Hours)
Reactor or Comments Scheduled Reducing Power 7
860919 S
0.0 B
5 TURBINE CONTROL VALVE TESTING l
Director, Office of Resource Management September Monthly Operating Report Page 4 ATTACHMENT IV NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO. 50/395 UNIT V. C. SUMMER I DATE 10/07/86 COMPLETED BY G. A. LOIGN0N TELEPHONE (803) 345-5209 1
The V. C. Summer Unit operated at 100% power throughout the month of September with the exception of approximately 27 hours3.125e-4 days <br />0.0075 hours <br />4.464286e-5 weeks <br />1.02735e-5 months <br /> on September 20 & 21, 1986, when power was reduced fcr turbine control valve testing.
A.
sggga Electric & Gas Company n
ti Co umt a, 29218 Nockar Operations SCE&G
~~
October 8, 1986 Director, Office of Resource Management U. S. Nuclear Regulatory Commission MNBB 7602 Washington, DC 20555 ATTN: Mr. Learned W. Barry
SUBJECT:
Virgil C. Summer Nuclear Statior Docket No. 50/395 Operating License No. NPF-12 September Monthly Operating Report f, y
Dear Mr. Barry:
SeprolBa A. V4NO /
Please find enclosed the ^"g" t 1986 Monthly Operating Report for the Virgil C.
Sumer Nuclear Station Unit No.1.
This submittal is made in accordance with the requirements of Technical Specification 6.9.1.10.
If there are any questions, please call us at your convenience.
Very trul g ours, f
a N
\\
N '.>. Nauman D
PDL: GAL: DAN /bjh Attachment pc:
- 0. W. Dixon, Jr./T. C. Nichols, Jr.
R. M. Campbell, Jr.
l E. H. Crews, Jr.
K. E. Nodland E. C. Roberts R. A. Stough J. G. Connelly, Jr.
G. O. Percival W. A. Williams, Jr.
R. L. Prevatte H. R. Denton J. B. Knotts, Jr.
J. Nelson Grace S. D. Hogge
- 0. S. Bradham INPO Records Center O. R. Moore ANI Library Group Managers L. N. Carter C. A. Price R. E. Rainear C. L. Ligon (NSRC)
NPCF File Y->M
\\
i
. _ _ _ _ _ _ _ _ -, ~,.. _ _ _.. _ _. _ _ _. _. _ _ _. _ _. _ _ _. _ _ _ - _,