ML20207K961

From kanterella
Jump to navigation Jump to search
Deficiency Rept Re Chemical & Vol Control Sys Centrifugal Pump hold-down Bolts.Results of Evaluation Will Be Submitted by 860819
ML20207K961
Person / Time
Site: Vogtle  
Issue date: 07/11/1986
From: Foster D
GEORGIA POWER CO.
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
GN-992, NUDOCS 8607300148
Download: ML20207K961 (1)


Text

Georgin Power Compmy yqg Post Offics Box 282 Waynesboro, Georgia 30830 Telephone 404 554-9961. Ext. 3360 404 724-8114. Ext. 3360 GCOrgiaPbwer D. O. Foster V e r s en

,i 2k*I9 tre south (Yn ehrftc Sgfem y

July 11,1986 United States Nuclear Regulatory Commission Region II File: X7BG03-M111 Suite 2900 Log:

GN-992 10111arietta Street, Northwest Atlanta, Georgia 30323

Reference:

Vogtle Electric Generating Plant-Units 1 and 2; 50-424, 50-425; CVCS Centrifugal Pump Hold-Down Bolts; Letter GN-901 dated May 6,1986 Attention: Mr. J. Nelson Grace Georgia Power Company is continuing its review of the condition concerning the CVCS centrifugal charging pump hold-down bolts.

Georgia Power Company now expects to inform the NRC of the results of the evaluation of this condition on or before August 19, 1986.

This response contains no proprietary information and may be placed in the NRC Public Document Room.

Yours truly, D. O. Foster l

PAH/DOF/tdm xc:

U. S. Nuclear Regulatory Commission Document Control Desk Washington, D. C.

20555 J. H. Miller R. A. Thomas L. T. Gucwa J. P. O'Reilly D. R. Altman C. W. Hayes G. F. Head P. R. Bemis G. A. McCarley R. E. Conway J. A. Bailey D. S. Read J. T. Beckham

0. Batum Sr. Resident (NRC)

R. H. Pinson G. Bockhold C. S. McCall (OPC)

P. D. Rice C. E. Belflower J. E. Joiner (TSLA)

B. M. Guthrie J. F. D'Amico D. C. Teper (GANE)

D. E. Dutton E. D. Groover NORMS R

D g2 s

,