I Georgia Fbwer Company
~ Fbst Offica Box 282 Waynesborn Georg',3 30830 Telephone 404 554-9961 404 724-8114 Southern Company Services, Inc.
Fbs' Office Box 2625 Birmingham, Alabama 35202 reiepnone 205 " "
Vogtle Project January 2, 1987 Director of Nuclear Reactor Regulation Filet X7BC35 Attentiont Mr. B. J. Youngblood Logt GN-1282 l
PWR Project Directorate #4 Division of PWR Licensing A U. S. Nuclear Regulatory Commission Washington, D.C.
20555 l
NRC DOCKET NUMBERS 50-424 AND 50-425 l
CONSTRUCTION PERMIT NUMBERS CPPR-108 AND CPPR-109 l
V0GTLE ELECTRIC GENERATING PLANT - UNITS 1 AND 2 SER OPEN ITEM 14at CONTROL ROOM DESIGN REVIEW (CRDR) PRELIMINARY SURVEYS Dear Mr. Denton During a telephone conversation with your Staff on December 29, 1986 additional information was requested on the status of certain CRDR preliminary surveys. Attached in the requested information on the (1) environmental surveys, (2) plant safety monitoring system (PSMS) and the automatic turbine supervisory instrumentation (ATSI) computer surveys, and (3) the communication survey.
If your staff requires any additional information, please do not hesitate to contact me.
Since rely, J. A. Bailey Project Licensing Manager JAB /caa Attachment xc R. E. Conway NRC Regional Administrator R. A. Thomas NRC Resident Inspector J. E. Joine r, Esquire D. Feig B. W. Churchill, Esquire R. W. McManus M. A. Miller (2)
L. T. Cucwa B. Jonen Esquire Vogtle Project File G. Rockhold, Jr.
10gjh h [
0
r-_
f 6' --
STATUS OF CREE PRELIMINARY SURVEYS I.
Environmental Surveys to be completed prior to exceeding 5% power:
a.
Humidity and Temperature Survey; b.
Air Velocity Survey.
II.
Computer Surveys previously completed:
a.
PSMS computer Survey (no HEDs identified);
b.
ATSI computer Survey (no HEDs identified).
III.
Preliminary Communication Survey (Two HEDs identified):
a.
HED #1325 - Fixed Base UHF Transceiver - Unit gain is adjustable, but the gain control is not limited so that when set to the lowest setting an audible signal is still present.
b.
HED #1326 - Fixed Base UHF Transceiver - Procedures are not established or posted for the use of the system.
The Fixed Base UHF Transceiver is planned to be replaced in April 1987.
0975V L
.