ML20207J942

From kanterella
Jump to navigation Jump to search
Forwards Rev 12 to Wolf Creek USAR & Revised Trm,Per 10CFR50.71(e)(4).TRM Replaces Relocated TS Contained in Operational Requirements Manual,Chapter 16,of Usar. Commitment Changes,Encl
ML20207J942
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 03/11/1999
From: Muench R
WOLF CREEK NUCLEAR OPERATING CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20207J946 List:
References
ET-99-012, ET-99-12, NUDOCS 9903160443
Download: ML20207J942 (29)


Text

.h, LF CREEK WG) NUCLEAR OPERATING g

Rchard A. Muonch Vce President Engineering -

MAR 111999 ET 99-0012 U. S. Nuclear Regulatory Commission ATTN:

Document Control Desk Mail Station P1-137 Washington, D. C.

20555

Subject:

Docket No. 50-482:

Revision 12 of the Wolf Creek Updated Safety Analysis Report Gentlemen:

P'

' Enclosure 1 to this letter provides the submittal of the Wolf Creek Updated Safety Analysis Report (USAR), Revision 12.

This submittal satisfies the Final Safety Analysis Report -(FSAR) updating requirement of 10 CFR 50.71 (e) (4).

Ten additional copies of the USAR, Revision 12, have been shipped to the Document Control Desk as required by 10 CFR 50.4, 10 CFR 50.34, 10 CFR

- 50. 54 (a) (3), and 10 CFR 50.71(e). to this letter provides the Wolf Creek Technical Requirements Manual (TRM),

Revision 1.

The TRM replaces the Relocated Technical Specifications contained in the Operational Requirements Manual, Chapter 16, of the USAR.

The TRM is incorporated in the USAR by reference.

The removal of the Relocated Technical Specifications to the TRM was perforr.ed by USAR Change Request Number 98-101, as described in Attachment 2 to this letter.

Attachment 1

provides information relative to changes in regulatory j

commitments.

Thir. information is provided in accordance with the guidance of

. Nuclear Energy Institute, " Guideline for hanaging NRC Commitments," Revirion 2, December 19, 1995.

Specific technical changes that have been processed since issuance of the USAR, Revision 11, are described in Attachment 2 to this letter.

In addition to these technical changes, several editorisi changes have been made and are included in this revision.

Many of the changes are the result of heightened j

awareress of USAR compliance and the USAR validation effort.

If you. have~

ny questions concerning this matter, please contact me at (316) 364-8831, extension 4034, or Mr. Michael J. Angus at extension 4077.

Very truly yours, l

l ILG h A

9903160443 990311

@~)

Richa.i A. Muench (D

PDR ADOCK 050004B2 K

PDR i

i l

PO. Box 411/ Burhngton. KS 66839 / Phone: (316) 364-8831

{

An Equal Opportun#ty Employer M FMC/VE T j

u.

l0*~?

... (Commitment Changes)

' Attachment 2 - (USAR Change Reg'...ts)

' Enclosure 1 (Updated Safety Analysis Report)

- Enclosure 2. (Technical Requirements Manuol-)

cc:

W. D. Johnson (NRC), w/a, w/e E. W. Merchoff (NRC), w/a, w/e K. M. Thomas (NRC), w/a, w/e Senior Resident Inspector (NRC), w/a, w/e

j..

i

[:

lA

j i

)

9 STATE OF KANSAS

)

)

SS COUNTY OF COFFEYl

)

j Richard A. Muench, of lawful age, being first duly sworn upon oath says that he is Vice President Engineering of Wolf Creek Nuclear Operating Corporation; j

that he has read the foregoing document and knows the content thereof; that he has executed that same for and on behalf of said Corporation with full power and authority to do so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief.

1 By Richard

. Muench Vice Pr sident Eng!.neering J

l SUBSCRIBED E d sworn to before me this day of [

d

, 1999.

JL972rlt1r fJD./) MNML M Notary Public [ j My Asst Eqs. f-// #MM9 Expiration Date h (11/ //, r$[]()] (I { l

O 1 ) Attachmsnt 1 to ET 99-0012 Paga 1 of 5 ~ CCEGGTHENT CHANGES Commitment 85-127 KANSAS GAS AND ELECTRIC (KG&E) COMMITS TO THE FOLLOWING TO CLOSE OUT NUREG-0881 OPEN ITEM I.A.I.1 Change and Justification NUREG-0737 REQUIRED EACH LICENSEE TO PROVIDE AN ON-SHIFT TECHNICAL ADVISOR (STA) TO THE SHIFT SUPERVISOR. THE PERSONNEL HOLDING THE STA POSITION ARE REQUIRED TO HAVE A BACHELOR'S DEGREE OR EQUIVALENT IN A SCIENTIFIC OR ENGINEERING DISCIPLINE AND HAVE RECEIVED SPECIFIC TRAINING IN THE RESPONSE AND ANALYSIS OF THE PLANT FOR TRANSIENTS AND ACCIDENTS. NUREG-0737 PROVIDED THE l LICENSEES WITH TWO METHODOLOGIES FOR ACCOMPLISHING THIS REQUIREMENT. OPTION 1 (THE OPTION INITIALLY IMPLEMENTED AT WCGS) WAS TO UPGRADE THE LEVEL OF QUALIFICATIONS OF THE SENIOR REhCTOR OPERATORS, BY PROVIDING THEM WITH THE 'NECESSARY ACADEMIC TRAINING. OJTION 2 (THE OPTION CURRENTLY IMPLEMENTED AT WCGS) WAS TO ASSIGN TO EACH OPERATING CREW AN ADDITIONAL INDIVIDUAL WHO HAS BACHELOR'S DEGREE OR EQUIVALENT IN A SCIENTIFIC OR ENGINEERING DISCIPLINE AND HAS RECEIVED SPECIFIC TRAINING IN THE RESPONSE AND ANALYSIS OF THE PLANT FOR TRANSIENT AND ACCIDENTS. IN THIS RESPONSE WCNOC COMMITTED TO IMPLEMENTING THE ENGINEER ON-SHIFT PROGRAM. THIS COMMITMENT FURTHER STATED THE ENGINEER WOULD FULFILL THE ROLE OF STA UPON COMPLETION OF THE PREREQUISITE TRAINING. Commitment 91-038 WCNOC WIL7, IMPLEMENT PROCEDURES TO EVALUATE FAILURES OF ENGINEERED SAFETY FEATURES ACTUATION SYSTEM (ESFAS) AND REACTOR TRIP SETPOINTS (RTS) CHANNELS WITH QUARTERLY ACOTs FOR COMMON CAUSE. IF COMMON CAUSE FAILURES ARE FOUND, ADDITIONAL TESTING WILL BE REQUIRED. Change and..stificatien COMMITMENT 91-038 CAN BE DELETED BASED ON COMMITMENT REQUIREMENTS BEING COMPLETED. AMENDMENT 43 TO TECHNICAL SPECIFICATIONS REQUIRED THAT A PROCESS BE IN PLACE TO EVALUATE FAILURES ASSOCIATED WITH REACTOR PROTECTION SYSTEM (RPS) l-AND ESFAS ANALOG CHANNEL OPERATIONAL TESTS (ACOTs) FOR COMMON CAUSE FAILURE l CONCERNS WHEN THE ACOT FREQUENCY WAS EXTENDED FROM MONTHLY TO QUARTERLY. THE REQUIREMENT WAS TO MONITOR AND COLLECT DATA FOR A ONE YEAR PERIOD WHICH BEGAN WITH THE FIRST QUARTER OF 1994. THE PROCESS WAS CONTROLLED BY ADM 08-807 AND HAS SHOWN NO COMMON CAUSE FAILURE CONCERNS TO DATE. ADM 08-807 IS BEING DELETED AND CONTINUED " GOOD PRACTICE" MONITORING SHOULD NOT BE CLASSIFIED AS A COMMITMENT BASED ON THE INITIAL ONE YEAR MONITORING REQUIREMENT BEING SATISFIED. i i i Commitment 91-041 AS FOUND AND AS LEFT DATA FOR THOSE ESTAS CHANNELS WITH INCREASED SURVEILLANCE TEST INTERVALS (STIs) WILL BE COLLECTED OVER A ONE YEAR PERIOD AFTEn QUARTERLY TESTING IS BEGUN. WCNOC WILL REVIEW DATA TO VERIFY THAT SETPOIJT DRIFT l REMAINd WITHIN ALLOWANCE IN ESFAS SETPOINT CALCS. Change and Justification COMMITMENT 91-041 CAN BE DELETED BASED ON COMMITMENT REQUIREMENTS BEING COMPLETED, AMENDMr.NT 43 TO TECHNICAL SPECIFICATIONS REQUIRED THAT A PROCESS i BE IN PLACE TO EVALUATE SET POINT DRIFT DATA ASSOCIATED WITH REACTOR PROTECTION SYSTEM (RPS) AND ESFAS ANALOG CHANNEL OPERATIONAL TEST (ACOT) I SETPOIUTE TO VERIFY THAT SETPOINT DRIFT REMAINS WITHIN THE EXISTING ALLOWANCE IN THE INSTRUMENT SETPOINT CALCULATION WHEN THE ACCT FREQUENCY WAS EXTENDED FROM MONTHLY TO QUARTERLY. THE REQUIREMENT WAS TO MONITOR AND COLLECT, DATA FOR -j e

F I to ET 99-0012 Page 2 of 5 l. l ~ CCteETMENT CHANGES A ONE YEAR PERIOD WHICH BEGAN WITH THE FIRST QUARTER OF 1994. THE PROCESS WAS CONTROLLED BY ADM 08-807 AND HAS SHOWN NO SETPOINT DRIFT CONCERNS TO DATE. ADM [ 08-807 IS BEING DELETED AND CONTINUED " GOOD PRACTICE" MONITORING SHOULD NOT BE l CLASSIFIED AS A COMMITMENT BASED ON THE INITIAL ONE YEAR MONITORING l REQUIREMENT BEING SATISFIED. l Commitment 91-080 l' THE PROCEDURE GOVERNING THE ISSUANCE OF GOVERNING SECURITY SYSTEMS WORK REQUESTS (SSWRs) WILL BE REVISED TO ENHANCE THE APPROVAL AND REVIEW PROCESS. THIS REVISION WILL PROVIDE A MEANS FOR DOCUMENTING WORK ACTIVITIES UNDER A SSWR FOR POWER BLOCK EQUIPMENT. Change and Justification COMMITMENT 91-080 CAN BE DELETED. THE PROCEDURE SSWRS, SEC 01-109, IS BEING DELETED. THEREFORE, THERE WILL BE NO MORE SSWRS WRITTEN AND THIS COMMITMENT IS NOT NEEDED TO CONTROL SSWRS. THE ORIGINAL COMMITMENT WAS MADE BECAUSE SSWRS WERE OUTSIDE OF THE NORMAL WORK REQUEST PROCESS, WHICH WAS CONTROLLED AT l THAT TIME BY ADM 01-057, " WORK REQUESTS." WITH DELETION OF SEC 01-109, WORK l REQUESTS INITIATED BY SECURITY WILL BE REQUIRED TO USE THE PLANT WORK REQUEST l SYSTEM, WHICH IS NOW GOVERNED BY PROCEDURE AP 16C-006, "MPAC WORK CONTROLS." l AP 16C-006 CONTAINS REQUIREMENTS FOR SHIFT SUPERVISOR AUTHORIZATION AND REVIEW EQUAL TO OR GREATER THAN THOSE REQUIRED BY SEC 01-109. THEREFORE, THERE IS NO REDUCTION IN COMMITMENT ASSOCIATED WITH DELETION OF SEC 01 -109. Coenitment 93-107 A PROCEDURE WAS INITIATED REQUIRING TESTING OF EACH CARD READER EVERY SIX MONTHS. Change and Justification INC L-3321, " CARD READER FUNCTIONAL TEST PREVENTIVE MAINTENANCE," REVISION 5, CHANGED COMMITMENT 93-107. THE ORIGINAL COMMITMENT WAS MADE IN WCNOC LETTER l WO 93-0090, FIRST QUARTER SAFEGUARDS EVENT LOG, WHICH IDENTIFIED A PROBLEM OF l CARD READERS MISREADING ACADS. THE COMMITMENT WAS TO TEST ALL CARD READERS i SEMI-ANNUALLY (EVERY SIX MONTHS) TO IDENTIFY PROBLEM CARD READERS. CARD l READER TESTING F.AS BEEN PERFORMED SINCE THAT TIME. IN JULY, 1995, IN CONJUNCTION WITH TPE INSTALLATION OF A BIO-METRICS SYSTEM, NEW CARD READERS WERE INSTALLED, AND tIW ACADS REPLACED THE MAGNETICALLY READ ACADS. TESTING OF READERS SINCE JULY, 1995, HAS NOT REVEALED A MISREAD ACAD. BASED ON THIS EXPERIENCE AND VENDOR RECOMMENDATIONS, TESTING OF CARD READERS WILL BE CHANGED TO ONCE EVERY TWO YEARS (24 MONTHS). THE EQUIPMENT WHICH ORIGINALLY REQUIRED THE COMMITMENT ' TO TEST CARD READERS EVERY SIX MONTHS IS NO LONGER USED AT j WCNOC. THEREFORE, THE ORIGINAL NEED FOR TESTING IS NO LONGER A CONSIDERATION. BASED ON TESTINC EXPERIENCE AND VENDOR RECOMMENDATIONS, THE CHANGE FROM SIX MONTHS TO 24 MONTHS IN TESTING FREQUENCY IS NOT CONSIDEAED TO BE A REDUCTION IN COMMITMENT. Commitment 93-326 WCNOC IS IN THE PROCESS OF IMPLEMENTING THE ENGINEER-ON-SHIFT CONCEPT TO COMPLEMENT THE OPERATING CREWS. CANDIDATES FOR THESE iCSITIONS HAVE BEEN SELECTED. INITIAL TPAINING (EQUIVALENT TO SHIFT TECHNICAL ADVISOR TRAINING) HAS COMMENCED AND IS SCHEDULED TO BE COMPLETED WITH THE PERSONNEL FUNCTIONING ON SHIFT BY MARCH 31, 1994. IN THE LONG-TERM, IT IS WCNOC'S INTENT TO HAVE THESE INDIVIDUALS LICENSED AS SENIOR REACTOR OPERATCRS PERFORMING THE SHIFT TECHNICAL ADVISOR FUNCTIUN AND ADMINISTRATIVELY ASSISTING THE SHIFT SUPERVISOR TO RELIEVE UNDUE BURDEN.

r' Attachmsnt 1 to ET 99-0012 Pega 3 of 5 CCDMITNENT CHANGES ~ Change and Justification COMMITMENT 93-326 IS SUPERSEDED BY INFORMATION IN LETTER WO 98-0087 WHICH l COMMITS TO AN EXTRA ON-SHIFT POSITION TO PERFORM THE DUTIES OF THE SHIFT TECHNICAL ADVISOR, ELIMINATING THE NEED FOR THE DUAL ROLE POSITION. Commitment 93-379 VENDOR MANUAL.3 AT WCGS ARE CONTROLLED DOCUMENTS. CHANGES TO VENDOR MANUALS ARE GENERATED AS PART OF THE PERMANENT MODIFICATION AND CONFIGURATION CONTROL l PROCESS. WHEN A VENDOR MANUAL CHANGE ASSOCIATED WITH A DESIGN CHANGE IS l RECEIVED AT WCGS, THE DOCUMENT IS FORWARDED TO THE ENGINEERING GROUP WHERE IT UNDERGOES A TECHNICAL ADEQUACY REVIEW. IF IT IS DETERMINED THAT THE VENDOR MANUAL CHANGE SHOULD BE INCORPORAT D INTO THE MANUAL, THE CHANGE IS ACCOMPLISHED PER THE ABOVE PROCESS. DURING THE ABOVE PROCESS THE VENDOR MANUAL CHANGE IS FORWARDED TO THE APPROPRIATE GROUPS FOR REVIEW. EACH GROUP IS RESPONSIBLE FOR UPDATING INDIVIDUAL DOCUMENTS (I.E., SURVEILLANCE l PROCEDURE, OPERATING PROCEDURE, MAINTENANCE PROCEDURE, ETC.) REQUIRING CHANGES AND IDENTIFYING WHETHER OR NOT TRAINING IS REQUIRED. Change and Justification VENDOR TECHNICAL MANUALS (VTMS) AT WCGS ARE CONSIDERED TO BE COMPOSED OF INDIVIDUAL DOCUMENTS REFERRED TO AS VENDOR TECHNICAL DOCUMENTS (E.G., INSTRUCTIONS, - PROCEDUhES, DRAWINGS, CALCULATIONS, ETC.) OR VTDS. VTDS ARE ASSIGNED A UNIQUE DOCUMEN' NUMBER AND ARE REVIEWED AND PROCESSED BY ENGINEERING PER APPROVED PROCEDURAL GUIDANCE. DURING THIS

PROCESS, I

ENGINEERING DETERMINES WHETHER A VTD UPDATE CONSTITUTES A DESIGN-RELATED CHAN3E. IF A VTD CHANGE SUPPORTS AN EXISTING DESIGN CHANGE PACKAGE (I.E., DOES NOT ALTER THE EXISTING DESIGN) IT IS INCORPORATED INTO THE PACKAGE. IF THE VTD REQUIRES A DESIGN OR CONFIGURATION CHANGE AND THE APPROPRIATE CHANGE PACKAGE DOES NOT EXIST, A NEW PACKAGE IS INITIATED IN ACCORDANCE WITH THE CURRENT DESIGN CHANGE Prot SSS. IF THE VTD REVISION ALTERS THE DESIGN OF'AN EXISTING DESIGN CHANGE PtCKAGE, THE DESIGN CHANGE PACKAGE IS REVISED TO INCORPORATE THE VTD INFORtATION. VTD UPDATES THAT ARE DETERMINED TO NOT AFFECT THE PLANT DESIGN ARE REVIEWED AND APPROVED BY ENGINEERING

HOWEVER, THEY ARE NOT REQUIRED TO BE PROCESSED PER THE DESIGN CHANGE PROCESS.

DURING THE ABOVE PROCESS, NOTIFICATIONS OF VTD CHANGES ARE FORWARDED TO THE APPLICABLE GROUP'S) FOR THEIR INFORMATION AND REVIEW. BASED ON THE REVIEW OF l THE CHANGES TO THE VENDOR INFORMATION, EACH GROUP INITIATES REVISIONS TO THEIR CONTROLLING DOCUMENTS (I.E., SURVEILLANCE PROCEDURES, OPERATING PROCEDURES, MAINTENANCE PROCEDURES, ETC.) AND ALSO PERFORM TRAINING AS NECESSARY. THE DESIGN PROCESS CONTINUES TO MEET THE CRITERIA OF 10 CFR 50, APPENDIX B, " DESIGN CONTROL," BECAUSE THE COGNIZANT ORGANIZATION WILL REVIEW A VTD CHANGE PRIOR TO ISSUANCE TO ENSURE THE DESIGN BASIS / FUNCTION OF THE SYSTEM OR COMPONENT IS MAINTAINED. I Commitment 96-171 A CHECKLIST OF QUESTIONS AND CONSIDERATIONS WILL BE GENERATED THAT THE SHIFT 1 SUPERV SOR AND WORK CONTROL CENTER SHOULD ASK WHEN A TROUBLESHOOTING REQUEST, OR A - REQUEST TO PERFORM A PROCEDURE, IS RECEIVED TO HELP ENSURE COMPLETE COMMUNICATION TAKES PLACE, AND TO ADDRESS OPERABILITY QUESTIONS. THIS l CMECELI2T - WILL BE UTILIZED UNTIL SUCH TIME AS WCNOC DETERMINES THAT TFIS INTERIX MEASURE IS NO LONGER OF VALUE. THE CHECKLIST WILL BE COMPLETED BY 1 SEPTEMBER 16, 1996. i Change and Justification l-CORRECTIVE ACTIONS INCLUDED A SELF ASSESSMENT, SEL 96-003, TO DETERMINE IF THE L-

1 . to ET 99-0012 -Page 4 of 5 COtMITNENT CHANGES - " OPERATIONS EVOLUTION CHECKLIST" IS EFFECTIVE IN MEETING ITS INTENDED PURPOSE. THIS.SELF ASSESSMENT DETERMIJED A REVISION WAS NEEDED TO THE CHECKLIST TO MAKE IT MORE FUNCTIONAL. THE CHECKLIST WAS REVISED AND RENAMED THE " EVOLUTION SCREENING CHECKLIST." THIS CHECKLIST REPLACED ' THE " OPERATIONS EVOLUTION CHECKLIST" IN AP 21-001 AND IS REFERENCED IN AP 22C-004. THIS CHANGE DOES NOT AFFECT THE INTENT OF THE COMMITMENT OF LER 96-008-00. Commitment 97-123 TRAINING AND QUALIFICATION REQUIREMENTS WERE ADDED FOR REGULATORY SCREENINGS AND USQDs IN 1995 AND PERSONNEL PERFORMING THESE ACTIVITIES HAVE BEEN TRAINED. ADDITIONAL IMPROVEMENTS UNDERWAY INCLUDE ' INCREASING THE PROFICIENCY LEVEL OF PERSONNEL PERFORMING USQDs BY REDUCING THE NUMBER OF QUALIFIED PERSONNEL BY HALF BY THE END OF 1997 USODs WILL BE REVIEWED FOR PROFICIENCY LEVEL TO DETERMINE WHO SHOULD REMAIN QUALIFIED. Change and Justification AT THE TIME COMMITMENT 97-213 WAS MADL, WCNOC HAD 137 PERSONNEL AUTHORIZED TO PERFORM USQDS THE COMMITTED REDUCTION ESTABLISHED THAT 68 PERSONNEL WOULD BE THE MAXIMUM NUMBER OF PERSONNEL PERFORMING USODS. WCNOC ANTICIPATES A SIGNIFICANT INCREASE IN HORK LOAD ASSOCIATED WITH RESOLUTION OF DISCREPANCIES IDENTIFIED BY THE UPDATED SAFETY ANALYSIS REPORT FIDELITY REVIEW PROCESS, THE CONTINUING ENGINEERING BACKLOG REDUCTION EFFORT, AND IMPLEMENTATION OF IMPROVED TECHNICAL SPECIFICATIONS. BECAUSE OF THIS INCREASED WORK LOAD, WCNOC IS INCREASING THE MAXIMUM NUMBER OF PERSONNEL AUTHORIZED TO PERFORM USQDS FROM THE CURRENT MAXIMUM NUMBER OF 68 TO THE MAXIMUM NUMBER OF 98. THIS CHANGE WILL BE EVALUATED BY OCTOBER 1, 1999, TO DETERMINE IF WCNOC SHOULD RETURN TO THE PREVIOUS MAXIMUM NUMBER OF 68. Commitment 97-214 COFFEY COUNTY EMERGENCY PREPAREDNESS HAS AGREED TO MODIFY THE COFFEY COUNTY EMERGENCY PLAN, TO ENSURE THERE IS A FIRM COMMITMENT FOR THE COFFEY COUNTY SHERIFF'S DISPATCHER TO CONTACT THE WCGS CONTROL ROOM IN THE EVENT OF A LOSS OF POWER TO ANY OF THE WOLF CREEK SIRENS. Change and Justification WCNOC HAS EVALUATED THE BENEFITS OF INSTALLING A SIREN TELEMETRY SYSTEM WHICH WOULD ALLOW CONSTANT MONITORING OF THE EMERGENCY PLAN SIRENS. OUR EVALUATION HAS CONCLUDED THAT A SIREN. TELEMETRY SYSTEM WOULD ALLOW WOLF CREEK TO MONITOR SIF.EH STATUS CN A REAL-TIME BASIS. SHOULD A SIREN LOSE POWER, THE PLANT WOULD /NDW IMMEDIATELY AND NOT HAVE TO RELY ON OFF-S!TE POWER COMPANIES AND COUNTY 7ERSONNEL TO KEEP US INFORMED. THIS SIREN TELEMETRY SYSTEM WAS INSTALLED BY THE END OF 1998. THEREFORE, COMMITMENT 97-214 IS NO LONGER NECESSARY. Commitment 97-218 WCGS HAS PROVIDED TO THE COFFEY COUNTY EMERGENCY PREPAREDNESS ORGANIZATION A COMPLETE LIST OF ALL ELEVEN SIRENS' POWER SOURCES FOR USE BY THE SHERIFF'S DISPATCHER. Change and Justification COMMITMENT U-218 WAS INTENDED TO PROVIDE IMPROVED NOTIFICA'~.M METHODS IN THE EVENT CF A LOSS OF POWER TO WOLF CREEK SIREMS, WCNOC HAS EVALUATED THE BENEFITS OF INSTALLING A SIREN TELEMETRY SYSTEM WHICH WOULD ALLOW CONSTANT MONITORING OF THE EMERGENCY PLAN SIRENS. OUR EVALUATION HAS CONCLUDED THAT A SIREN TELEMETRY SYSTEM WOULD ALLOW WOLF CREEK TO MONITOR SIREN STATUS ON A to ET 99-0012 j Page 5 of 5 CCDMITNENT CHANGES HEAL-TIME BASIS. SHOULD A SIREN LOSE POWER, THE PLANT WOULD KNOW IMMEDIATELY AND NOT HAVE TO RELY ON OFF-SITE POWER COMPANIES AND COUNTY PERSONNEL TO KEEP US INFORMED. THIS SIREN TELEMETRY WAS INSTALLED BY THE END OF 1998. THEREFORE, COMMITMENT 97-218 IS NO LONGER NECESSARY. Commitment 97-219 i THE COFFEY COUNTY EMERGENCY PREPAREDNESS ORGANIZATION HAS AGREED TO REAFFIRM THE LETTERS OF AGREEMENT WITH EACH OF THE UTILITIES THAT PROVIDE POWER TO THE ALERT AND NOTIFICATION SYSTEM SIRENS. I Change and Justification COMMITMENT 97-219 WAS INTENDED TO PROVIDE IMPROVED NOTIFICATION METFuDS IN THE EVENT OF A LOSS OF POWER TO WOLF CREEK SIRENS. WCNOC HAS EV1.; EATED THE BENEFITS OF INSTALLING A SIREN TELEMETRY SYSTEM WHICH WOULD ALLOW CONSTANT MONITORING OF THE EMERGENCY PLAN SIRENS. OUR EVALUATION HAS CONCLUDED THAT A SIREN TELEMETRY SYSTEM WOULD ALLOW WOLF CREEK TO MONITOR SIREN STATUS ON A REAL-TIME BASIS. SHOULD A SIREN LOSE POWER, THE PLANT WOULD KNOW IMMEDIATELY AND NOT HAVE TO RELY ON OFF-SITE POWER COMPANIES AND COUNTY PERSONNEL TO KEEP US INFORMED. THIS SIREN TELEMETRY SYSTEM WAS INSTALLED BY THE END OF 1998. THEREFORE, COMMITMENT 97-219 IS NO LONGER NECESSARY. Commitment 98-052 THE APPROPRIATE ACTIONS WILL BE TAKEN TO EITHER REVISE THE USAR OR TO PURSUE PLANT MODIFICATIONS BASED ON THE NRC'S RESPONSE TO WCNOC'S PROPOSED COMMITMENT CHANGE RELATED TO THE POST-ACCIDENT SAMPLING SYSTEM (PASS). A SCHEDULE TO ACHIEVE FULL COMPLIANCE WILL BE GENERATED ONCE NRC INPUT IS RECEIVED ON LETTER WO 98-0047. Change and Justification USAR CHANGE REQUEST 98-117 WAS INITIATED 10/21/98 AND ASSOCIATED USQD 59 98-0071 WAS APPROVED BY PSRC ON 8/14/98. REFERENCE NRC LETTER DATED SEPTEMBER 4, 1998 TO OTTO L. MAYNARD FROM KRISTINE M. THOMAS WHICH DOCUMENTED REVIEW OF i WCGS POST ACCIDENT SAMPLING SYSTEM COMMITMENTS. i

- to ET 994012 l -. Page 1 of 21 USAR Change Request Description 97-202 REVISE THE USAR TO IMPROVE THE DESCRIPTION OF THE AMOUNT OF WATER MAINTAINED IN THE REFUELLING WATER STORAGE TANK (RWST) AND TO CLARIFY HOW MUCH OF THE WATER IN THE RWST IS AVAILABLE TO THE ECCS PUMPS. Page: 644 Page. 6.2-50 98402 CHANGE LOCATION SHOWN AS "Z" FOR ESSENTIAL SERVICE WATER (ESW) COMPONENTS IN USAR TABLE 3.21 ON SHEETS 8 AND 19 TO READ "O" FOR OUTDOORS. "Z"IS NOT DEFINED. TatWe: 3.21 Sheet 19 Table: 32-1 Sheet 6 98408 INCORPORATE CHANGES TO ALLOW SUPPLIER MATERIALS QUALITY AND QUAUTY CONTROL (QC) RADIOGRAPHY PERSONNEL TO ESTABLISH AND REMOVE RADIOLOGICAL BOUNDARIES AND POSTINGS. Page: 12.3-8 98412 REVISE ADDITIONAL PAGES TO REFLECT RESISTANCE TEMPERATURE DETECTOR (RTD) BYPASS MODIFICATION. Pege' 7.3-37 Table: 15 0-4 Sheet 1 i 98413 REVISE FIRE PROTECTION DISCUSSION TO REFLECT APPROVED USES OF FIRE SUPPRESSION SYSTER j rage: 9 5-26 Table: 9 5E 1 Sheet 2 Tatta: 9 SA-1 Sheet 44 98415 REVISE THE DESCRIPTION FOR THE ENCAPSULATIONS IN THE USAR TO CLARIFY THE FACT THAT IT IS THE AMBIENT INSIDE THE COMPARTMENTIENCAPSULATION THAT IS NOT CONNECTED WITH THE CONTAINMENT SUMP OR CONTAINMENT ATMOSPHERE. Page. 6246 Page. 5 4-37 98418 REVISE USAR TABLE 5.2-2 (SH 2) TO ADD MATERIAL SB437 (N07718) AND REVISE TABLE 5.4-1 FOR WEIGHT OF THE REACTOR COOLANT PUMP (RCP) WITH NO.1 SEAL HOUSING STUDS, NUTS & WASHERS. Tab 6e: 54-1 Sheet Tab 6e: 52-2 Sheet 2 98418 REVISE FIGURE TO CORRECT INSTRUMENTATION DESIGNATOR. Ficure 547 Sheet 00

m ! to ET 994012 l Pa9e 2 of 21 1 i USAR Change Request Description 98C7 REVISE USAR TO CLARIFY THAT THE NORMALLY CLOSED PARALLEL SET OF COMPONENT COOUNG WATER (CCW) l CONTAINMENT ISOLATION VALVES MAY BE OPENED TO RECOVER FROM A LOSS OF COOLANT ACCIDENT (LOCA) OR MAIN STEAM UNE BREAK (MSLB), BUT ARE NOT REQUIRED TO, EVEN THOUGH USAR TABLE 3.11(B)-3 REFLECTS THAT THEY ARE NOT ENVIRONMENTALLY QUAUFIED. PS: 9.2 16 i 98 038 CHANGE DRAWING M-12FCO2 (USAR FIGURE 10.4-10) WITH REPLACEMENT TO TACHOMETER RELAYS FCST0318A AND FCSSHL318A WITH A S;NGLE SPEED SWITCH (FCSAHLO318). i Figure: 10410 Sheet 1 I 98-039 REVISE THE USAR TO EXPAND THE UMITS FOR RELATIVE HUMIDl1Y AND TO MAKE THE USAR CONSISTENT WITH RESPECT TO THE EXPECTATIONS FOR THE HUMIDIFICATION SYSTEM. Page:. 9.49 Page: 94-3 Table: 3 11(8) 1 Sheet 5 Table: 3.11(B)-1 Sheet 4 98440 REVISE CERTAIN MINIMUM QUAUFICATIOfC FOR PLANT PERSONNEL CONTAINED IN CHAPTER 13 OF THE USAR. Page: 13.1 14 Table: 13.1 1 Sheet 2 Taole: 13.1 1 Sheet 1 l l l 98 041 CHANGE THE REFUEUNG MACHINE BRIDGE, TROLLEY AND HOIST SPEEDS TO 60 FPM,40 FPM, AND 40 FPM, RESPECTIVELY. l ( Page: 0.1 32 Table: 9.1-7 Sheet 1 98442 REPLACE EXISTING CARBON STEEL RUBBER SEATED BUTTERFLY VALVES USED FOR SERVICE WATER STFiAINER ISOLATION WITH STAINLESS STEEL METAL SEATED TORQUE CLOSE VALVES. l Figure: 92-1 Steet 3 l 98443 REVISE THE COMPUTER ALARM SETPOINTS FOR THE ROOM TEMPERATURE AT THE ESW PUMPHOUSE AND ALSO REVISE THE DESCRIPTION OF HOW THE ESW ROOM HEATERS OPERATE. Page: 9 4-88 Page-9 4-87 98448 REVISE ORGANIZATION TITLES. Page. 13 1-20 Page: 13 1-8 Page. 13 1-7 Page. 13.1 20 Page: 13117 I L..

[ l l-to ET 99-0012 -- Pa9e 3 of 21 i USAR Change Request Description i i 98446 REVISE USAR TABLES TO CHANGE THE FIRE PROTECTION FOR THE TURBINE GENERATOR BEARINGS FROM MANUAL WATER SPRAY TO AUTOMATIC PRE-ACTION SPRINKLER SYSTEM. Tatie: 9.5.1-2 Theet 2 Figure-. 9.3-1 Sheet 2 Figure: 9.5.1-1 Sheet 1 98447 REVISE TABLE AND NUREG 0737 RESPONSE TO CORRECT TABLE REFERENCE TO TECHNICAL SPECIFICATION AND UPDATE COMMITMENT BASED ON LATER SUBMITTALS. Page: 18.3 18 Page: 18.3-17 Page: 18312 Page: 18.3 11 l Tatne: 5.4A 1 Sheet 8 98448 CLARIFY THE 20 HOUR COOLDOWN OF THE PLANT DESCRIBED IN SECTION 9.2. Page: 9218 l 98449 REVISE USAR TABLE 3.11(B)-3 TO REFLECT REMOVAL OF REL!EF VALVES. Tates: 3.11(B)-3 Sheet 107 98460 REVISE USAR TO RESTATE THE ANALYSIS POINT FOR RADIONUCLIDES WILL BE PERFORMED BY EITHER AN IN LINE ANALYZER OR AN ANALYZER LOCATED AT ANOTHER LOCATION,IN ACCORDANCE WITH NUREG 0737 SECTION 11.B.3. ( Page: 18.2 23 98451 REVISE USAR FIGURE 8.3-2 TO INCREASE THE EMERGENCY DIESEL GENERATOR (EDG) LOCA LOADS FOR THE INJECTION PHASE AND THE REClRCULATION PHASE BY 24 KW, AND TO INCREASE THE EDG BLACK OUT LOADS FOR HOT STANDBY AND COLD SHUTDOWN BY 12 KW. I . Figure: 8.3-2 Sheet l 98462 REVISE THE USAR TO REFLECT THE ORGANIZATION CHANGE OF COMBINING THE POSITIONS OF SUPERINTENDENT l RADIATION PROTECTION AND SUPERINTENDENT CHEMISTRY INTO A NEW POSITION OF MANAGER CHEMISTRY / RADIATION PROTECTION. i Page: 13 5-9 Page: 13 5-8 Page: 13 5-7 Page. 1354 l Page: 13.1-20 Page. 13.1-11 Page. 12.5 8 Page: 12.5 C fage: 12.5 4 Page: 12.5-1 Page. 12.1-9 Page. 12.1 2 i TatWe-13.1-1 Sheet 2 TatW9: 13.1-1 Sheet 1 TatWe: 12.5-2 Shoot 1 Fgure: 1312a Sheet 984C3 REVISE USAR FIGURE 8.3-2-00 (DRAWING E-11005) TO CORRECT INACCURATE LOAD TOTALS. Figure 832 Sheet I l r f I-

m 9 - Atlachment 2 to ET 964012 - Page 4 of 21 USAR Charige Request Description. 96454 REVISE TITLE OF VICE PRESIDENT ENGINEERING TO VICE PRESIDENT ENGINEERING AND INFORMATION SERVICES. Page: 17.2 30 Page: 13.1 8 Page: 13.1 4 Page: 13.14 98 065 DELE 11 COMPONENTS ON TABLE 3.11(B)-3 AND TABLE 9.68-2 DUE TO INAVERTENT INCORPORATION OF CALLAWAY j PLANT SPECIFIC INFORMATION INTO WOLF CREEK'S USAR. TetWe: 3.11(B)-3 Sheet 89 Totne-9 $(B) 2 Sheet 19 Totne: 3.11(B)-3 Sheet 59 98465 ADO CORARIENTS FOR THE ALARM SETPOINTS FOR SJRE42 AND GERE-92 TO DESCR18E CHANGES TO THE SEPOINTS MAY BE MADE DURING MONi10 RED STEAM GENERATOR (SIG) TUBE LEAKS IN ORDER TO PROVIDE PROBIPT INDICATION OF INCREASES IN LEAK RATE. TetNo: 11.5 3 Sheet 1 TetWe 11.5 1 Shoot 2 9846T CHANGE DESCRIPTION OF 1CWOO2 FROM RAOTOR OPERATED VALVE TO MANUAL OPERATED VALVE. Figues. 10.4-1 Sheet 2 Fgwe: 11.2 1 Sheet 5 i 98488 REVISE USAR FIGURE 9.2-6A TO CORRECT DRAFTING ERRORS. i Figwe: 9.2-5A Sheet 98480 CHANGE THE USAR TO SUPPORT IMPROVED PROFICIENCY AND EFFICIENCY IN THE WAY NONCONFORIAANCES AHD SL3NIFICANT NON44ARDWARE PROBLEMS ARE PROCESSED. Page: 17.243 Page 17.2 42 Page: 17.241 Page: 17.240 Page: 17.2 39 Page: 17.2 13 98461 CHANGE THE USAR TO REFLECT A DESIGN CHANGE FOR THE DEMtNERALIZED WATER MAKEUP SYSTEM TO BE SUPPLIED BY THE SERVICE WATER SYSTEM AND NOT FROM THE JOHN REDMOND RESERVOIR. Page: 9.2 24 Page. 9223 Page: 9 2-22 fego: G.'. Tetpe. 921 Sheer. 2 Totne: 921 Sheet 1 Fours: 925 Sheet 2 Figure: 92-1 Sheet 1 98482 REVISE CHAPTER 6, CHAPTER 9, CHAPTER 16. AND CHAPTER 18 OF THE USAR TO ACCURATELY REFLECT THE CURRENT CONTAINMENT LEAK RATE TESTING PROGRAM. Dage: .9476 Page: 6 2-95 Pe0s: 6244 Totne: 18 2-2 Sheet 4 L.

F ! to ET 99-0012 Pa9e 5 of 21 USAR Change Request Description 98467 REVISE THE USAR TO CORRECT THE VOLUMETRIC INFORMATION FOR THE REACTOR COOLANT PUMP LUBE OIL DRAIN TANK. Page: 9 58 173 Page: 9.5-25 Tath 9 SE.1 Sheet 36 Table: 9 SE-1 Sheet 35 Tabie: 9.5E 1 Sheet 34 ~ Table: 9 5A 1 Sheet 56 98468 CHANGE THE REPORTING RESPONSIBILITY OF THE SHIFT SUPERVISORS FROM THE MANAGER OPERATIONS TO THE SUPERINTENDENT OPERATIONS. AND ADD PLANT PERSONNEL INFORMATION FOR THE SUPERINTENDENT OPERATIONS SUPPORT. Page: 13.1-17 Page: 13.1-9 Figure: 1312c Sheet 98469 REVISE THE USAR TO RECONCILE THE DIFFERENCES BETWEEN VARIOUS CALCULATIONS AND SYSTEM DESCRIPTIONS OF THE CCW AND RESIDUAL HEAT REMOVAL (RHR) SYSTEMS. Page. 5444 Page: 5 4-33 Page: 5 4-32 Table. 924 Sheet 2a Table: 92-3 Sheet 2a Table: 9.2-3 Sheet 2 Table: 92-3 Sheet 1 Table: 92-2 Sheet 2 Table: 9.2-2 Sheet 1 Table: 54-7 Sheet 1 Table: 9 2-11 Sheet 2 Table: 9211 Sheet 1 Table: 9 2-10 Sheet 2 Table: 9210 Sheet 1 Table-92-9 Sheet 2 Table: 92-9 Sheet 1 Tobie: 92-4 Sheet 2 Table: 9.24 Sheet 1 98470 ADD NOTE TO CLARIFY THE MEANING OF THE INJECTION FLOW RATE DESIGN PARAMETER USED AS INPUT TO THE CONTAINMENT ANALYSIS-Table: 62.1-3 Sheet 2 Table: 62.1-3 Sheet 1 98471 REVISE TA3tE TO REFLEC1 nw2l18 REACTOR VESSEL MATERIAL SPECIMEN WITHDRAWAL TIMES. Table: 5 3-11. Sheet 1 h 98472 REVISE CONDENSATE DEMINERALIZER DESCRIPTION IN THE USAR TO REFLECT MINOR CHANGES WHICH CLARIFY THE GENERAL DESCRIPTION, SYSTEM OPERATION, AND COMPONENT DESCRIPTION SECTION. j Page. 10420 Page: 10419 Page: 10 4-18 Page: 10 4-17 Yable-10 4-4 Sheet 1 1 98473 REMOVE OUALITY EVALUATIONS FROM PERFORMING AN IN-LINE REVIEW OF ADMINISTRATIVE PROCEDURES. Page 17.2 31 Page: 17.2-29 Page. 17.2-28 Page: 17.2 23 Page. 17719 Page. 17217 I Vable. 17 11 Sheet 2 Table: 17.2 1 Sheet i noe,e 1314 S,.et

l l l' Attaawnent 2 to ET 99 0013 l .. Page 6 of 21 USAR Change Request Description I 98474-CORRECT DISCREPANCIES ASSOCIATED WITH USAR SECTION 10.4.1 CONCERNING THE CONDENSATE SYSTEM DESCRIPTION, M-10AD, FOUND DURING SEL 97 044, USAR FIDEUTY REVIEW. Page: 1044 Page: 10.4-3 . Page: 10.4 1 98075 REVl8E TABLE TO IDENTIFY YARD LOOP ISOLATION VALVES WHICH ARE NOT ELECTRONICALLY SUPERVISED i l Tetde: 9.5A 1 Sheet 51 I 98 076 REVISE THE USAR TO INCORPORATE CHANGES TO THE ADMINISTRATIVE UMIT IMPOSED ON THE CONOENSER PRESSURE BY THE TURBINE-GENERATOR MANUFACTURER. Page: 10.4-11 90477 CORRECT A TYPOGRAPHICAL ERROR ASSOCIATED WITH TABLE 1.3-1 OF THE USAR. l l Tatne: 1.3-1 Sheet 3 [ I 90478 CLARIFY STATEMENTS ADDRESSING INDICATION AND ALARMS ASSOCIATED WITH LIFTING OF CERTAIN REUEF VALVES IN THE SAFETY INJECTION AND RHR SYSTEMS. l Page: 5.2 34 i 98479 RELOCATE OF TECHNICAL SPECIFICATION SURVEILLANCE REQUIREMENT 4.5.1.2 PERTAINING TO THE 1 l ACCUMULATORS IN THE EMERGENCY CORE COOUNG SYSTEMS TO CHAPTER 16 OF THE USAR (NOW THE TECHNICAL REQUIREMENTS MANUAL). l Page: 1651 Page: 16.04 98400 ADO DEGASIFIER VACUUM PUMPS TO LIST OF COMPONENTS COOLED BY CLOSED COOLING WATER SYSTEM IN TABLE 9 2-24; CORRECT CLOSED COOLING WATER PUMP NORMAL FLOW VALUE IN SECTION 9.2.8.2.2. l Pope. 9 2-49 Vatne:. 9 2-24 Sheet 1 i 98481 REVISE TABLE 10.4-9 (SHEET 3) TO REFLECT INFORMATION ABOUT HEAT TRANSFER VALUE IF MORE THAN 6% OF l STEAM GENERATOR TUBES ARE PLUGGED. j Table: 10 4-9 Sheet 3 I i t to ET 994012 l _ Page 7 of 21 l USAR Change Request Description 98482 REMOVE OF NOTE 18 OF TABLE 3.11(B)-2; CORRECT CONT AINMENT DESIGN TEMPERATURE NOTE 4 OF TABLE 3.11(8)-2. I Table: ' 3.11(B)-2 Shoot 6 TatWe: 3.11(B) Sheet 1 98483 ADO INFORMATION TO 8.2.1.2.3 FOR CORRECTION REGARDING THE REPLACEMENT OF WATER-FILLED SHIELD BAGS WITH A PERMANENT REACTOR CAVITY SEAL RING. Page: 6.2 17 98484 CORRECT HARD COPY TABLE 11.4A-3A TO INCLUDE MISSING LINES IN NOTE THAT HAVE BEEN WRAPPED TO THE NEXT LINE ON ELECTRONIC COPY, TatWe: 11.4A 3A Sheet 1 -98486 CORRECT TYPOGRAPHICAL ERRORS ASSOCIATED WITH THE TABLE OF CONTENTS AND TEXT OF CHAPTER 11 OF THE USAR. Page: 11.4-8 Page-1127 Page: 11 042 Page: 11.0 4 98488 CORRECT TYPOGRAPHICAL ERRORS ASSOCIATED WITH THE TEXT OF CHAPTER 7 OF THE USAR. Page: 7.6-2 Page: 7.2-32 Page: 7.2-23 Page: 7.2-21 Page: 7.2-20 98487 REVISE THE USAR TO REFLECT 49CFR178 AND 179 CHANGES TO THE DEPARTMENT OF TRANSPORTATION REQUIREMENTS FOR APPROVED CONTAINERS USED FOR PACKAGING, STORAGE, AND TRANSPORTING OF RADIOACTNE MAT ERIALS. Page: 11.4A.1 Page: 11 4-9 98488 REVISE NOTE TO CLARIFY THAT AN OPERABLE SAFETY INJECTION PUMP MAY BE SUBSTITUTED FOR AN INOPERABLE CENTRIFUGAL CHARGING PUMP FOR A FLOW PATH FROM THE REFUEUNG WATER STOAAGE TANK. i 98489 REVISE FIGURE 10.2142 TO REFLECT CHANGE FROM CARBON STEEL PIPING COMPONENTS WITH LOW ALLOY STEEL WHICH IS MORE RESISTANT TO WEAR DUE TO FLOW ACCELERATED CORROSION (FAC). Fgure: 10.2 1 Sheet 2

p Allachment 2 to ET 994012 -._ Page 8 of 21 USAR Change Request Description i l l_ 98400 REVISE FIGURE 10.44 01 TO REMOVE RESTRICTION IMPOSED BY NOTE 9 THAT REQUIRES CONTINUOUS PRESENCE OF ( AUTHORIZED INDIVIDUALS WHENEVER VALVES AEV0341/2 ARE CLOSED TO ALLOW MAINTENANCE / REPAIR OF l THERMAL RELIEF VALVES AEV09781979. l F6gure: 10.4 4 Sheet 1 L 98 001 REVISE USAR TO REMOVE SPECIFIC PRODUCT IDENTIFICATICW FOR CARPET NYLON YARN (BRANO NAMES) AND REPLACE TH18 INFORMATION WITH TECHNICAL REQUIREMENT VALUES. Page: 9.58-140 != 98492 CORRECT TYPOGRAPHICAL AND FORMATTING ERRORS ON USAR SECTION 9.6 AS IDENTIFIED BY THE USAR FIDELITY REVIEW. Page. 9.5-73 PeDe. 9544 Page: 9 5-49 Page: 9.5 02 l Page: 9.5-36 Page. 9533 Page: 9 5-14 Page: 9.5-9 Page: 9.5-7 i i 98493 CORRECT EDITORIAL ERRORS IN USAR SECTIONS 9.0. 9.2,9.3 AND 9.4 AS IDENTIFIED BY THE USAR FIDELITY REVIEW. Page: 9441 Page: 9476 Peps: 9445 Page: 9 4 Page: 9 0 xxvd Page. 934 Page: 9.2-2 PeGe: 9.2-46 Dage: 9.24 l l 98494 REVISE FIGURE 15.0 26 TO CHANGE THE EMERGENCY CORE COOLING SYSTEM (ECCS) HOT LEG RECIRCULATION SWITCHOVER TIME FROM 24 HOURS TO 10 HOURS FOLLOWING AN ACCIDENT. 1 Figure: '15.0-25 Sheet 98 095 REMOVE COMPONENTS EF HV-0006 AND EF-HV 0086 FROM TABLE 3C-1 AND CORRECT EXIT ESW TEMPERATURE FOR AIR COMPRESSOR AND AFTER COOLER. i Totne: '924 Sheet 2 TotWe 92-2 Shoot 2 Totne: 3C-1 Sheet 1 (1 98496 REVISE USAR FOR CONSISTENCY WITH USAR CR 94108 AND 97131. TEXT AND TABLE REVISION CHANGE VALVE INTERLOCK PRESSURE VALUE. Page: 5 4-33 . Tetso: 547 Sheet 1 Figure: NOTE 5 44 Sheet 3 Fgure: NOTE 5 4 8 Sheet: 1 l

I l (3 ET 994012 ..Pa9e 9 of 21 USAR Change Request Dacription I 98497 REVISE USAR FIGURE TABLE AND TEXT TO REMOVE THE POSITION OF ASSISTANT MANAGER MAINTENANCE AND CLARIFY SUPERINTENDENT ELECTRICAUl&C TO SUPERINTENDENT INSTRUMENTATION AND ELECTRICAL Page: 13 5-10 Tatne: 1311 Sheet 1 Figure: 13.1-2b Sheet 98498 REVISE THE USAR TO ENCOMPASS OTHER POSSIBLE REASONS THAT THE ESW PIPING IS CHANGED OUT TO STAINLESS STEEL Page: 92-7 98499 REVISE THE USAR TO CORRECT TYPOGRAPHICAL ERRORS IDENTIFIED BY THE USAR FIDEUTY REVIEW FOR SECTIONS 9.6,9.5B,15.4 AND 15.5. Page: 9584 Page: 15.5-4 Page: 9.5-7 Page: 9514 Fage-9 5-39 Page: 9547 Page. 9544 Page: 9541 (Page: 15 4-24 Page: 9581 Page: 9 5B-13 Page. 0.58 9 Page: 95819 Page: 9 58-58 Page. 0.5843 Page: 95845 Page: 96847 Page: 95848 Page: 9 58-73 Page. 9 58-27 Page: 9 68-195 Page. 9 5-30 Figure: 15 4-26 Sheet j 98-100 REVISE THE USAR TO CORRECT TYPOGRAPHICAL AND EDITORIAL ERRORS IDENTIFIED BY THE USAR FIDEUTY REVIEW FOR SECTIONS 15.0,15.3, AND 15.6. Page: 15 6-3 Page. 15314 Page: 15.3-13 Page: 15.3-12 Dage: < 5.3-11 Page-15.3-10 Page: 15.0-xxvu Fgure: 15638 Sheet Fig'se: 15 6-2 Sheet Fgure: 15 6-1 Sheet l l I l

I i 4 l ~ to ET 99 0012 l Page 10of 21 USAR Change Request Description 98 101 REMOVAL OF CHAPTER 16 OPERATIONAL REQUIREMENTS MANUAL, FROM THE USAR TO THE TECHNICAL REOUIREMENTS MANUAL (TRM) PAGE 16.0-0 OF USAR WILL REMAIN AS REFERENCE TO THE TRM-Page: 16.3 11 Page: 16.11 4 Page: 16.3-2 Page: 16.34 Page: 16 34 Page: 16.3-5 Page: 16.34 Page: 16.2 Page: 16.3-6 Page: 16.2-1 Page-16.3-10 Page: 16.1 11 Page: 16.3-12 Page: 16.3-13 Pay: 16.314 Page: 16 3-15 Page. 16.3-16 Page: 16317 Page: 16 3-10 Page: 16.3 19 Page: 16 0-0 Page: 16.3-21 Page: 16.3-9 Page: 16.04 Page: 16 04 Page: 16 04i Page: 16 04ii Page: 16 04v Page: 16 0-v Page: 16 0-vi Page: 16 0-vli Page. 10 O Page. 16.3 1 Page: 16 0-3 Page: 16.3-22 Page: 16.04 Page: 161-1 Page: 16.1-2 Page: 16.1 3 Page: 16.1-4 Page: 1615 Page: 16.1 4 Page. 16.1 7 Page: 10.14 Page: 1610 Page: 16110 Page 16 0-2 Page: 1662 Page: 16,3 20 Page: 16.74 Page: 16.7 9 Page: 16.7 10 Page-16.7 11 Page. 16712 Page: 16713 Page: 16.7 14 Page: 16.7 4 Page: to 6-1 Page: 16.7 5 Page: 16 6-3 Page: 16 6-4 Page: 16 9-1 Page: 16.9-2 Page: 16 9-3 Page: 1694 Page: 16 9-6 Page: 16.10-1 Page: 16.11-1 Page: 16.11 2 Page: 16715 Page: 16 6-1 Page: 1641 J Page. 1642 Page: 16 4-3 Page: 16.44 Page. 1645 I Page: 1644 Page: 16 4-7 Page: 1644 Page. 16.7 7 Page: 16.5-1 Page: 16.3-23 Page: 16 6-2 Page: 1664 Page: 1664 Page: 16 6-6 Page: 1664 Page: 16 6-7 Page: 1664 Page: 16.7 1 Page: 1672 Page: 16.7 3 Page: 16.74 Page: 16.44 98 103 REVISE THE USAR TO CORRECT AN EDITORIAL DISCREPANCY IDENTIFIED BY THE USAR FIDELITY REVIEW FOR A TABLE IN USAR SECTION 7.2. Table-7.24 Sheet 5 98-104 REVISE THE USAR TO CORRECT TABLE OF CONTENTS INCONSISTENCIES AND A FIGURE TITLE IN CHAPTER 2 OF THE USAR. Page: 2.0-xxxvi Page: 2.0-xxiv Page: 2.0-xxui Page. 2 0-xxii Page: 2 0-xix Page: 2.0-xiii Page: 2 0-whi Page. 2 0-vi Page: 2 04 Page 2 04 I Figure. 2 5-360 Sheet 2 98-105 REVISE USAR SECTION 8.3 TO INDICATE THAT, DURING DIESEL GENERATOR TESTS, THE SWITCH IN THE CONTROL ROOM THAT ALLOWS PARALLEL OPERATION WITH THE PREFERRED SYSTEM IS PRIOR TO SYNCRONIZATION, AS l OPPOSED TO SUBSEQUENT TO DIESEL GENERATOR START. Page. 6 3-13 i l 1 L to ET 99-0013 Page 11 of 2* USAR Change Request Description E106 REVISE THE USAR TO CLARIFY THE RADIOACTIVE WASTE PROCESS AND CORRECT A TYPOGRAPHICAL ERROR IN POWER GENERATION DESIGN BASIS FOUR-i Page: 10 4-54 Page: 10453 98-107 REVISE USAR TABLE 9.216 TO CHANGE THE MAXIMUM ALLOWED VALUE OF CHLORIDES, FLUORIDES, CALCIUM. AND MAGNESIUM CONCENTRATIONS AND REMOVE THE TOLERANCE ASSOCIATED WITH BORIC ACID CONCENTRATIONS. i Table: 9.14 Sheet Table: 9216 Stwet 96-109 REVISE THE USAR TO CORRECT SECTION 11.2 TO REFLECT THAT THERE IS ONLY ONE DECON SHOWER. Page-11.2-14 Page: 11.2-5 98-110 REVISE THE USAR TO REFLECT ACCURATE INFORMATION CONCERNING PLANT EQUIPMENT AND A COMPUTER CODE. Page: 3.11(8) 1? Page: 311(B)-7 Page: 3.11(B)-4 98-111 REVISE THE USAR TO C.ORRECT DISCREPANCIES BETWEEN FIGURES T.6-4 AND T.21. Figure: 7.64 Sheet - 3 Figure. 76-4 Sheet 2 F(ure-76-4 Sheet 1 96 112 REVISE THE USAR TO REFLECT THE CORRECT POWER LEVEL USED IN THE ORIGINAL CONTAINMENT P/T ANALYSIS AND TO REFLECT THE CORRECT HEAT TRANSFER COEFFICIENT FOR CCW HEAT EXCHANGER. Page: 9 115 Page: 62-7 Tatne: 6.2.1-56 Sheet 98 113 REVISE THE USAR TO ENABLE UTERAL COMPLIANCE CONSISTENCY BETWEEN THil USAR. FLANT PROCEDURES AND FIELD WORK. Page: 91 51 Page: 9150 / age. 9146 98-114 REVISE THE USAR TO REMOVE A DUPLICATED PARAGRAPH AND TO CLARIFY CHANGES TO SECTION 13.1.2.4. Page: 13.1 14 Page: 13 1-13 i 98-116 REVISE THE USAR TO CORRECT REFERENCES TO THE P&lD FOR THE CCW FROM FIGURE 9.2 3 TO FIGURE 9.2-15. Page: 6271 Page: 7610 Table. 3.21 Sheet 6 l l l

Attachment a to ET 990012 .. Page 12 of 21 USAR Change Request Description 98 117 ELIMINATE FROM THE USAR THE REQUIREMENT TO PERFORM A SAMPLE AND ANALYSIS OF RCS DISSOLVED HYDROGEN OR TOTAL GAS IN ACCORDANCE WITH NUREG4737, SECTION 11.B.3. Cage: 18224 Page. 18.2 23 Table. 7A-3 Sheet 13.1 98-119 REVISE THE USAR TO CLARIFY TESTS BEING P2RFORMED TO DEMONSTRATE THE CAPABILITYlRELIABILITY OF THE ECCS AND TO CORRECT THE CONTAINMEV 0ESIGN TEMPERATURE LISTED ON TABLE 3.11(B). Page. 3.142 Table: 311(B)-2 Sheet 6 Table: 31*G)-2 Sheet 98 120 REVISE THE USAR TO CHANGE SCREENHOUSE TO PUMPHOUSE, PERTAINING TO ESSENTIAL SERVICE WATER SYSTEM l (ESWS), AND TO MORE ACCURATELY DESCRIBE THE CONDENSATE STORAGE TANK (CST) LEVEL Al. ARMS IN THE MAIN CONTROL ROOM. @ age: 9.2 42 Page. 1222 Page: 9211 Page: 9 2-10 Page: 924 Page: 924 Page: 9 2-32 98-121 REVISE A USAR FIGURE TO INDICATE THE REMOVAL OF THE FIRE PROTECTION TEST HEADER VALVES. Fogure: 951 Sheet 1 98-122 REVISE A USAR FIGURE TO CORRECTLY IDENTIFY THE HAND SWITCH FOR THE INLET AIR DAMPER GDTZ11 A AS HIS11 A. Figure. 948 Sheet 00 98-123 REVISE USAR FIGURES TO SHOW THE REMOVABLE HANDRAIL AND GRATING INSTALLED IN THE RADWASTE BUILDING HIGH INTEGRITY CONTAINER LID STORAGE PLATFORM. Fegure-124 Sheet i Figure 124 Sheet 1 98-124 REVISE THE USAR TO CORRECT TYPOGRAPHICAL AND EDITORIAL ERRORS IDENTIFIED BY THE USAR FIDELITY REVIEW FOR SECTIONS 3.0,3.11(B) AND 3.11(N). Page: 30xM Page. 3 0-xhi Page 3 0 xh Pags. 3 0-xxxiv Page: 30.xxv Page' 3 0. xxiv Page: 3 0-rvu Page: 3 04x Page: 3 0 viil Page: 3 0-6v Page: 3 0-6h Page: 3 04 Page: 311(N)-1 Page. 3.11(B)4 Table: 3.11(8) Sheet 1 Table: 3 11(3)-12 Sheet i

R Altschment 2 to ET 99-0012 _ Page 13of 21 USAR Change Request De8cription 98-125-REVISE THE USAR TO CLARIFY SPECIFIC METHODS OF ANALYSIS REGARDING RETRAN AND VIPRE 01 AND TO CLARIFY INFORMATION REGARDING STEAMLINE BREAK TRANSIENTS. PaBe:

  • 4 t-21 Page:

15.119 Page: 15.1 11 Page: 15.1 7 Page: 15.1 4 TatWe: 15 0-2 Sheet 98-127 REVISE THE USAR TO REFERENCE THE NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY FOR TRACEABLE STANDARDS AND TO REVISE ACTIONS TAKEN WHEN THE VALIDITY OF RESULTS ARE SUSPECT. Page: 13.5-10 Page: 13.5 9 Page: 12.5 4 Page. 12.5 3 Page: 12.3 31 Page: 12.3-23 Page: 11.5 4 Page: 9533 96 128 ADD THE RESPONSIBluTY OF " DAILY SCHEDULING" TO THE RESPONSIBILITY OF THE MANAGER INTEGRATED PLANT SCHEDULING. Page: 13112 98 129 REVISE THE USAR TO REFLECT THE ACTUAL APPROVED METHOD OF SYSTEM OPERATION FOR THE CENTRAL CHILLED WATER SYSTEM AND TO CHANGE THE PHRASE

  • NORMAL CHARGING PUMP ROOM COOLER" TO " NORMAL CHARGING PUMP FAN COIL UNIT" FOR ACCURACY AND CONSISTENCY WITHIN THE USAR.

Page. 9 4-93 Page: 9441 98-131 REVISE THE USAR TO CORRECT EDITORIAL ERRORS IDENTIFIED BY THE USAR FIDELITY REIVEW. Page. 9444 Page: 9443 Page: 6.2M 98-132 REVISE THE USAR TO CORRECT EDITOitlAL AND TYPOGRAPHICAL ERRORS IDENTIFIED BY THE USAR FIDELITY REVIEW FOR CHAPTER 9. Page: 9 2-11 Page: 9 58 105 Page: 9 58-97 Page: 95889 Pag 3 9 58-76 Page: 9 0-vni Page. 9 0-vii Page: 9 0-v6 Page-9 0-iv Page. 9 0 nl Page: 9.1-50 Page: 9 0 xxiv 98-133 REVISES DISCUSSION TO CLARIFY CONTAINMENT TESTING PROCESS. Page: - 6293 Page: 6 2-91 98-135 REVISE THE USAR TO ACCURATELY DESCRIBE THE OPERATION OF THE REACTOR COOLANT SYSTEM, THE REGULATED PRESSURE DURING STARTUP AND SHUTDOWN OPERATIONS, AND THE SHUTDOWN OPERATIONS FOR THE CONTROL RODS. Page. 4 3-27 Page 7718 Page-7.72

p i to ET 99-0013 Page 14of 21 USAR Change Request Description 98-138 REVISE THE USAR TO REFERENCE THE " TECHNICAL REQUIREMENTS MANUAL (TRM)" INSTEAD OF THE " TECHNICAL SPECIFICATIONS", Page: 7.3-39 Page: 7.3-36 98-137 REVISE FIGURES (P&lDs) TO PROPERLY REFLECT AS-BUILT CONDITIONS ASSOCIATED WITH REMOVAL OF COVERS OVER THE CASK LOADING POOL Fqure: 3 8-96 Sheet Fqure: 3 6-96 Sheet Fgure: 1.2 22 Sheet Fgure: 1.2-20 Sheet 98-141 REVISE THE USAR TO CLARIFY THE ROLE OF THE NUCLEAR STATION OPERATOR CONCERNING COMPONENT MA NIPULATION ACTIVITIES WITHIN THE CONTROL ROOM AND TO REVISE THE ORIGANIZATION CHART TO CORRECTLY SHOW REPORTING HIERARCHY FOR THE OPERATING CREWS. Page: 13110 Fqure-13.14e Sheet 98142 REVISE THE USAR TO CORRECT EDITORIAL ERRORS IDENTIFIED BY THE USAR FIDELITY RElVEW. l Page: 7.6-12 Page 744 j 98-143 REVISE THE USAR TO CLARIFY THE INSERVICE INSPECTION AND ASME CODE COMPLtANCE. Page: 665 Page: 664 Page: 66-3 Page. 662 Page: 661 Page: 5430 Page: 5 4-20 Pass: 5 2-32 Page: 5.2-31 Page: 5230 Page: 5.2-29 Page: 5.2-28 Page: 5227 Page: 5226 Page: 5.2-25 98-144 REVISE THE WORDING IN SECTION 15.6.5 3.1 TO ACCURATELY DESCRIBE THE POWER SHAPE CURVE THAT WAS ASSUMED IN THE CURRENT SMALL BREAK LOCA ANALYSl8 AND WHICH 1S DEPICTED IN FIGURE 15.6-47. Page: 15 6-24 98-145 CHANGE THE USAR INDICATED PROCESS OF HYDROSTATIC TESTING OF FIRE HOSES TO THE PROCESS OF j REPLACEMENT OF HOSE RACK HOSES EVERY 5 YEARS AS ALLOWED BY NFPA 14-1976. 1 TatWe: 9 5A 1 Sheet 52 Table: g SE 1 Sheet 4 i I 98-146 CORRECT CONSISTENCY ERRORS WITHIN THE USAR AND CORRECT PORTIONS THAT WERE NOT PROPERLY UPDATED WITH TECHNICAL SPECIFICATION AMENDMENTS 69 AND 99. Page: 15 5-7 Page: 1554 TatWe: 15 5-1 Sheet i Table-15 0-2 Sheet 3 i 4

f G ET 99-0013 -.Pa9e 15 of 21 ( USAR Change Request Description 98 148 CORRECT REFERENCE FROM USAR CHAPTER 18 TO TRM IN THE DISCUSSION PORTION OF REGULATORY GUIDE 1.133 IN APPENDIX 3A. Page: 3A-57. l 98-149 REVISE TABLE 5.11 TO CORRECT THE INDICATED THERMAL DESIGN FLOW FOR AN ACTIVE LOOP. I Vable: 5.11 Sheet 1 98-150 P.EVISE THE INDICATED APPROXIMATION OF THE NUMBER OF THERMOCOUPLES LOCATED AT THE OUTLET OF THE I CORE. Page: 15 4-25 98-152 REVISE THE USAR BASED ON FIDELITY REVIEW ITEMS INCLUDING REVISION OF PERSONNEL TITLES AS DESCRIBED IN CHAPTERS 14 AND 18 AND TO REFLECT THE IMPLEMENTATION OF THE SHIFT ENGINEER POSITION. PM: 18.1 24 Page: 18.1 4 Page: 18.1-5 Page. 14.2 11 Page. 1424 1 98-163 REVISE THE USAR TO INCORPORATE CHANGES TO PROCEDURE STN EF-020A CONCERNING ESW WARMING LINE FLOW RATE. Page: 9 2-10 Page: 92-9 i 98-154 CORRECT USAR CHAPTER 12 TABLE OF CONTENTS NUMBERING OF SEVERAL ITEMS, CORRECT A TYPOGRAPHICAL ERROR AND REMOVE AN UNNECESEARY WORD TO MORE ACCURATELY DESCRIBE THE POST AACCIDENT SAMPL!NG SYSTEM. Page: 12.2 3 Page: 12.2 4 Page: 12.0 66 Page' 12.01 i l 98-155 CORRECT THE USAR IN RESPONSE TO NUMEROUS CORRECTIVE ACT'ON DOCUMANTS GENERATED BY THE USAR FIDELITY REVIEW TEAM CONCERNING USAR CHAlaTER 15. Page 15.2 13 Page: 15 2-2 Page. 1523 Page: 15.2-4 Page 15.24 Page: 1526 P8ge: 1507 Page: 15 2-12 l Page. 1562 Page. 15 2-18 Page: 15.2 20 Page: 16222 Page: 15.2 23 Pat,a-15226 Page. 15 3-2 Page. 15 4-8 f Page: 15.2-11 TaWe-15.2-1 Sheet 4 Table-15.2 1 Sheet 3 l [.. r

r. to ET 99-0013

. Page 16 of 21 LISAR Change Request' Description 98 166 INCORPORATE CHANGES TO THE USAR RECOMMENDED BY THE FIDELITY REVIEW TEAM IN CHAPTERS 13 AND 18. Page. 13.2-12 Page: 13.2-2 Page: 13.2-3 Page: 1324 Page: 13 2-5 Page: 13 2-7 Page: 13 2-8 Page: 13.2-9 Page. 13.2 1 Page: 13 2-11 Page: 18.1 12 Page: 13.2-13 Page: 13.2-14 Page: 13 2-15 Page: 13 2-16 Page: 13.2 17 Page: 13.2 16 Page: 13.2 20 Page: 13.2-22 Page: 13 2-23 Page: 13.2 10 TatWe: 13.1 1 Sheet 2 Tatne: 13.1-1 Sheet 1 98-160 REVISE USAR TABLE 9.5.13 TO DELETE SPECIFIC SECTION NUMBER REFERENCES UNDER "SURVE!LLANCE REQUtREMENTS" COLUMN TO ALLOW FOR GENERIC REFERENCE TO AP 10-100. Vatne: 95,13 Sheet-4 Table 95.13 Sheet 3 Table 9513 Sheet 2 Table: 95.13 Sheet 1 i 98-161 ADD COMPONENETS TO EACH ACCUMULATOR TRAIN ON EACH MAIN STEAM ISOLATION VALVE AND ESTABLISH A NEW NITROGEN PRECHARGE CURVE. Page: 7.3-27 Page: 7 3-26 Figure: 10 3-1 Shoot 2 98-162 ADD INFORMATION TO FIGURE 8.3-2-00 CLARIFYING THAT IT WAS COMMON PRACTICE FOR THE SUPPLIER TO PROVIDE OVERSIZE MOTORS HOWEVER, NAMEPLATING REFLECTS OPERATING CONDITIONS. Figure: 83-2 Sheet 00 98 163 REVISE THE FIRE HAZARDS ANALYSIS TO CHANGE THE AMOUNT OF COMBUSTIBLES THAT WILL BE IN THE CONTROL ROOM PANTRY (ROOM 3602) AND TO STATE THAT THE PANTRY WILL HAVE A STAND ALONE HEAT DETECTOR THAT WILL AUTOMATICALLY CLOSE THE PANTRY DOOR ON ALARM. Page. 9 SB-143 98-165 REVISE THE USAR TO CHANGE THE NAME OF POSITIVE DISPLACEMENT PUMP TO NORMAL CHARGING PUMP AND TO CORRECT THE SPECIFICATION NUMBER FOR THE NORMAL CHARGING PUMP. Page: 14 2-50 Page. 12 3-5 Page: 9433 Page 5213 VatWe: 3B-1 Sheet 15A TatWe-38-1 Sheet 15 Tatne: 311(B)-3 Sheet 69 i Tatpe: 311(B) 3 Sheet 67 TatHe 311(B)-3 Sheet 48 Table-311(B)-3 Sheet 46 Tatne. 311(B) 3 Sheet 45 TatWe 311(BF3 Sheet 42 TatWe: 311(B)-3 Sheet 41 Tatne: 311(B)-3 . Sheet 39 Tat 8e 311(B)-3 Sheet 37 Table' 311(B),2 Sheet 1 Vatse: 311(B)-1 Sheet 1 Figure. 12 3-2 Sheet 1 Fgure 95.12 Sheet: 1 Figure. 3B 1 Sheet Fgure 36-1 Sheet 21 u.

i.- to ET 99 0012 l, Page 17 of 21 - L l USAR Change Request Description l 98-104 REVISE THE USAR TO INDICATE THAT FIELD ROUTED CABLES ARE AN EXEMPTION TO THE ELECTRICAL SEPARATION CRITERIA AND TO INCREASE THE COMBUSTI8LE LOADING DUE TO THESE CABLES. i l ' Page: 9 5(8)172 - Page. 9 $(8)-171 Page: '8341 Page: 9 58-172 ( Page: 9 58-171 Page: 8341 l l 98-$67 REVISE THE USAR TO DESCRl8E THE SWING BATTERY CHANGER MODIFICATION-l l Page. 9 58-131 Page' 9 58-122 Page: 9 58-120 Page: 9 58 117 l Page' 9 58-114 Page: 9.58 109 Page. 9 58-107 Page. 958 105 j Page. 9 58-78 Page. 95829 Page: 8 3-44 Page: 8.3./; ( - Page: 8341 Page. 8334 f Vates: 9 58-2 Sheet 21 Table: 9 58-2 Sheet 20 TatWe: 834 Sheet 34 TatWe. 834 Sheet 33

Table, 834 Sheet 2 TatWo.

3 11(8)-3 Sheet 151 l ' TatWe:' 3.10(8) 1 Sheet Figure 834 Sheet 1 Fgure B32 Sheet Fgure: 1.2 24 Sheet 98 148 REVISE USAR FIGURE AND TABLE TO REFLECT MODIFICATIONS TO THE STEAM DUMP LINE TO ATMOSPHERE ON AUXILLIARY STEAM. I l' TatWe: 17-2 Sheet 3 I Fgure: 959-1. Sheet 1 98-100 REVISE USAR FIGURE TO REFLECT CHANGE TO THE ESSENTIAL SERVICE WATER PRELUBE SYSTEM-Fgure: 92-2 Sheet 3 98-170 REVISE THE USAR TO CORRECT THE BATTERY SPECIFICATION AND TO REFLECT THE NEW FIRE LOAD VALUES FOR THE BATTERY ROOMS ( Pa0s: 9 58-117 Pa0s. 9 58 114 Tatde. 3 11(8)-3 Sheet 151 98 171 REVISE THE USAR TO REFLECT THE CORRECT INFORMATION FOR THE NEW TOTAL DISOLVED SOLID COLLECTOR TANK PUMPS, Vatne: 10415 Sheet 4

L I' ! to ET 994012 ~ Page 18of 21 USAR Change Request Description 98-172 REVISE THE USAR IN SUPPORT OF CYCLE 10 CORE RELOAD DESIGN CONFIGURATION. Page. 424 Page: 4 0-vei Page: 4214 Page: 4213 Page: 4212 Page: 4211 Page: 42-2 Page. 42-7 Page: 4216 Page: 425 Page: 4.2-4 Page: 4.2-3 Page: 42-2 Page: 42-1 Page; 4.1-3 Page. 4.11 Page: 4 2-10 Page: 4.3 16 Page: 4245 Page. 4 4-36 Page. 4 2-35 Page: 4 2-29 Page: 4 3-10 Page: 4215 Page: 43-7 Page. 4246 Page. 4228 Page: 4227 Page. 4 2-18 Page: 4217 Page' 4226 Page: 4 2-25 Page-4224 Page' 4.2-23 Page: 43-9 Table: 431 Sheet 2 Tatne: 43-1 Sheet 1 Table: 411 Sheet 4 Table-411 Sheet 3 Figure. 4 2-3C Sheet Figure: 4 2-2C Sheet 98-173 REVISE THE USAR: TO UPDATE YEARS OF REVISIONS INDICATED FOR SEVERAL IEEE EDITIONS RF,5ULTING FROM A NEW CONTAINMENT PENETRATION, TO REFLECT REVISED FIRE ZONE TABULATIONS, AND TO ACD ADDITIONAL INFORMATION ON FIBER,IEEE-317 (1983), AND FREE AIR CABLE. Page. 8 1-25 Page: 3 8-30 Page: 8 3-41 Pr.go. 8.1-24 Page: 9 58-51 Page: 958172 Table' 321 Sheet 2 98-174 REVISE THE USAR TO CHANGE SPECIFIC CONTROL VALVES DESCRIBED AS GLOBE TYPE TO BALL TYPE. Figure 1044 Sheet 3 98-175 REYlSE THE USAR DESCRIPTION OF THE SYSTEM WATER SUPPLY CAPABILITY OF THE FIRE PROTECTION PROGRAM BASED ON A REDUCTION OF THE POSTULATED HOSE STREAM DEMAND. Page. 957 Page: 956 Page: 95-5 Page: 952 Table. 9 5A 1 Sheet 47 98-178 REVISE THE USAR TO INDICATE THE ADDITION OF A NEW DRAIN LINE AND TO MAKE UPDATES RESULTING FROM THE ADDITION. Page-3A-23 Tabee 52-1 Sheet 1 Table: 3 7(N) 1 Sheet 1 Table-36-3 Sheet 68 F(ve 511 Sheet 3 l t to ET 99-0012 .. Page 19 of 21 USAR Change Request Description 981T7 REVISE THE USAR TO REFERENCE " OXYGEN CONTROL CHEMICAL" AND *PH CONTROL CHEMICAL" AS OPOOSED TO HYDRAZINE AND AMMONIA AS THE CHEMICALS ADDED TO THE CONDENSATE AND FEEDWATER CHEMICA.s. ADDITION SYSTEM. Page: 14 2 128 Page. 14.2-127 Page. 10 4-33 Page: 10.4-24 Page: 10423 Page-10.3-10 Page. 10.3-9 Th.- 9.3-5 Sheet 1 T6ble: 3.11(B)-3 Sheet 14 Table' 1.71 Sheet 13 Table: 1.71 Sheet 2 F$ure: 10 4-7 Sheet 2 Fgure: to 4-7 Sheet i Fgure: 1.2 30 Sheet: 0 98-101 REVISE THE USAR TO REFLECT CHANGES MADE TO THE RADIOLOGICAL CONTROLLED AREA FENCING AND THE CONCRETE MASONARY UNIT BLOCK WALL i Figure: 1.2-44 Sheet 1 98-182 REVISE THE USAR TO CLARIFY THE FUNCTION OF CHECK VALVES IN THE DEMINERALIZED WATER TRANSFER SYSTEM AND TO ADD THAT SUPPLY OF DEMINERALIZED WATER TO THE DEMINERAllZER STORAGE TANK CAN BE INITIATED MANUALLY. Page: 9.2-25 Page: 9223 98-183 REVISE THE USAP YO ;NDICATE THE CORRECT OUTPUT POWER OF THE MAIN GENERATOR DUE TO A CHANGE FROM POWER RE-RATE. Page: 10.2-5 g 1 Figure-6.31 Sheet 1 98 185 REVISE THE USAR TO PROVIDE EMERGENCY MAKEUP WATER REQUIREMENTS FROM THE ULTIMATE HEAT SINK TO THE AUXILLIARY FEEDWATER SYSTEM WHEN THE CONDENSATE STORAGE TANK IS UNAVAILABLE OR EXHAUSTED. Page: 9 2-35 Page: 9.2 34 Page 9.1-22 i l I l

. to ET 99-0013 -. Pace 20 of 21 USAR Char:ge Request Description 99402 REVISE THE USAR TO MAKE VARIOUS TYPOGRAPHICAL AND EDITORIAL CORRECTIONS TO THE USAR IDENTIFIED IN CORRECTIVE ACTION DOCUMANTS AS A RESULT FROM THE USAR FIDELITY REVIEW. Page: 9 0-rvu Page. 40-4 Page: 9.5B S4 Page: 9 0.xxix Page: 9.0-xxvm Page. 9 0.xxvu Page: 9 0-xxvi Page: 9.0-xxy Page: 9.0-xxiv Page: 10 0-viii Page: 9 0-xvm Page: 15 0 H j Page: 9.0-x Page: 9 0-ix Page: 904 Page: 8 0 -41 Page' 8H Page. 8 04 Page: 4 0-ot Page: 4 0 vsi Page. 4 0-vi Page: 4H Page: 9 0-mix Page: 15.0.xvu Page: 18.0 v Page: 18 04ii Page: 18 0-li Page: 15.0-xxv Page: 15 0-xon Page: 15 0 xxu Page-. 15.0-xxi Page: 15.0-xx Page: 10 0-vu Page. 15.0-xvm Page. 18.2-29 Page: 15 0-xxv Page: 15 0. xxiv Page: 14 0-xvi Page: 15.0-xv Page: 15.0.xiv 64ge: 150ax Page. 15 0-vid Page: 15 0-vil Page: 150-e Page: 15.0-v Page: 15 0-ni Page: 15 0-mix Table: 15 2-3 Sheet 1 TatWe. 7A 3 Sheet 5.2 Fgure 15 6-24a Sheet Figure 15 6-17 Sheet Fgure: 15 6-15 Sheet Figure: 15 6-12E Sheet Figure: 15 4-26 Sheet 99403 REVISE THE USAR TO CORRECT EDITORIAL ERRORS INCURRED DURING THE INCORPORATION OF USARCR 97-178 INTO I REVISION 11 OF THE USAR. Table: 9211 Sheet 2 Tatpe: 9 2-10 Sheet 2 Table-92-9 Sheet 2 99406 REVISE THE USAR TO MAKE ORGANIZATIONAL REPORTING CHANGES AND A TITLE CHANCE. Page: 18.1 17 Page: 18116 Page: 17.2 15 Page: 17.2 14 Page: 17.2 13 Page: 17.2-7 Page. 17.2-3 Page: 13.1 18 Page: 13.1 13 Page. 13.1 7 Figure: 13.1-4 Sheet i 99 014 REVISE THE USAR TO REFLECT THAT A REACH ROD FOR A VALVE HAS BEEN REMOVED AND A LOCAL HANDWHEEL WAS INSTALLED. Figure: 93-8 Sheet 2 99415 REVISE THE USAR TO CORECT ERRORS MADE BY IMPROPER INCORPORATION OF USAR CHANGE REQUESTS. Page: 15.2 11 Page: 13113 Page: 9.1 40 Table: 9 5A 1 Sheet 64 Table: 441 Sheet 2 Table: 441 Sheet 1 99416 REVISE THE USAR TO ADD A FIGURE THAT WAS INADVERTENTLY DELETED IN A OREVIOUS REVISION, Figure 10 4-3 Sheet

) to ET 99-0012 Pa9e 21 of 21 USAR Change Request Description 99 021 REVISE THE USAR TO REFLECT THE DESIGNATION OF THE PLANT MANAGER AS A MEMBER OF THE BOARD OF DIRECTORS FOR WOLF CREEK NUCLEAR OPERATING CORPORATION AND AS AN OFFICER OF THE COMPANY BY INCLUDING IN 't HE TITLE, VICE PRESl4ENT PLANT OPERATIONS. Page: 1J 5-1 Page: 12.5-1 Page: 13.1-9 Page: 13.1 10 Page;

  • 3.1 11 Page:

13.1 12 Page: 13.1-13 Page: 13.1 15 Page. 12.1-2 Page: 13.4-1 Page: 18.1 25 Pa0s. 13.5 2 Page: 13.5-6 Page. 13 5-7 Page: 17.2-3 Page: 17.2 17 Page: 17.2-28 Page. 17.2-32 Page: 17.2-34 Page: 17.2-38 Page: 1819 Page: 13.1 16 Table: 17.2 1 Sheet 2 99-025 EDITORIAL CHANGE TO UPDATE TABLES 1 T, TO CORRECT TYPOGRAPHICAL ERRORS DISCOVERED DURING FINAL EDITING OF REVISION 12 OF THE USAR AND TO DOCUMENT EEVERAL FIGURES WHERE THE DESIGN DRAWING WAS REVISED FOR CORRECTIONS TO DRAFTING ERRORS (TRUE ERRORS) OR TO REFLECT THE REMOVAL OF A TEMPORARY MODIFICATION. Page: 17.0-iv Page: 13.1 20 Page: 13.1-19 Page: 13.1 18 Page. 13 1-17 Page: 13.1 16 Page. 13.1-8 Page: 13.04 Page: 13 04 Page: 8 04 Page: 404 Page: 4 04 TatWe: 11 2 Sheet 2 Table: 11 1 Shoot 2 Tab 6e. 11 1 Sheet 3 Tatne 17-1 Sheet 4 Tab 6e: 1.71 Sheet 9 Table: 17-1 Sheet 1 Table: 17 2 Sheet 1 Table: 11 1 Sheet 12 Table: 11-2 Sheet 3 Table: 17 2 Sheet 4 Tabie: 17-2 Sheet 5 Table: 17-2 Sheet 7 Table: 11 3 Sheet 1 Table: 11-3 Sheet 2 Table: 11-3 Sheet 3 Table. 171 Sheet 10 Fgwe: 1.2-9 Sheet Fgure: 1.2-28 Sheet Fgure: 94-1 Sheet 1 Figwe: 9.2-5A Sheet Figure. 93-1 Sheet 1 Fgure-9.3-8 Sheet 3 Figure: 10 4-8 Sheet 1 Fgure: 10 4-1 Sheet i Figure-95.1-1 Sheet i Fgure: 92-1 Sheet 2 .. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _. _ _ _ _.}}