Text
m
,Y
/b 9
January 5,1986 NRC/THI-87-001 REMOPANDUi! FOR:
Harold R. Denton, Director Office of Nuclear Reactor Regulation Frank J. lif raglia, Director Division of PUR Licensing-B FR0it:
llillian D. Travers, Director THI-2 Cleanup Project Directorate
SUBJECT:
NRC TMI-2 CLENiUP PROJECT DIRECT 0PATE liEEKLY STATUS REPORT FOR DECEMBER 22, 1986 - January 4,1987 1.
DEFUELIhG Licensee efforts at renoving the drilled "hard crust" area continued using existing and nodified tooling. The spade bucket tool is noderately successf ul, achieving a fill rate of approximately one ccnister per two days.
The Defueling h'ater Cleanup Systen (DilCS) was tested with coagulant and body feed injection in operation. The test run was unsuccessful when the filter plugged af ter a throughput of less than 3,000 gallons of reactor coolant systen (RCS) water. This was the same filter that had previously successfully processed 120,000 gallons of water frora the reactor coolant blced tanks (RCBT's) using the same coagulant. Laboratory tests had shown that the coagulant nay not be as effective on RCS water as on the RCBI water. Preparations arc in progress to test another coagulant on the HCS that was successfully tested in the laboratory.
2.
!MSTE SHIPMDiT During the week of Decenber 14, 1986, a fuel debris shipncnt was made without incident with both fuel shipping casks. One fuel shipping cask has returned and is being loaded.
3.
iW:ACCtEf1T C!lAHGES Michael Slobodien, Radiological Controls Manager. GPU!!, was transferred to Oyster Creek fiuclear Power Station on January 1, 1937 to take the position of Radiological Controls Director, llis replacenant is D.il. Turner who wss at Cyster Crcek Nuclear Power Station in the corresponding position.
8701080585 870106 PDR ADOCK 05000320 OP PtC E >
.u E >
C:3E >
rcc roau sie no soi nacu ono OFFICIAL RECORD COPY
Ilarold R. Denton 2
January 5,1987 Frank J. Miraglia i;RC/TMI-37-001 4.
E.4 VIRO:U:EHTAL 1:0NITORJHG US Environnental Pratcctica "gency (EPA) sauple analysis results show that T;ll site liquid efflurmts are in accordance with regulatory linits, MRC requirerents, and the City of Lar. caster Agreecen.
THI water effluents are sanpled from the station (Units 1 and 2) discharge and analyzed by EPA.
Carm spectrun unalyses of the seven daily cocposited samples (Decenber 13 - 20, 1936) indicated no THI-2 relcted rndleactivi ty.
EPA's garr:0 spectrua analysis of tha :EC's TNI cutdoor uir sanple has r.o results available this reporting period.
The Lancaster water works intake conposited sevea daily sar:ples (Deceuber 14 - 30, 1965). The gama spectrun analyzed by EPA showed na reactor related radioactivity.
l 5.
AUXILIARY AND FUEL HANDLING DOILDING ACTIVITIES l
)
Rec 1.mation of D'.lCS filters continues.
l Charccal filters have been replaced in the fuel hurdling building (FM3) and will be tested. This uudification is in support or j
installatico of aa er;gi:,eering safety feature grade FH3 ventilation syston for T'il-1 as nandated by the T:!!-1 restart license l
conditiuns.
l l
6.
GLC EVALUATIOhS IN PROGRESS l
l Technical Spacification Changa Request nurbors 49, S1, 52, and 54.
l Rrecovery Operatien. Plan Change nunbers 31 and 33.
j Solid Uaste Facility Technical Evaluation Report.
!icavy Lcnd Safetj Eveluation Rrpart, Rcvision 3.
l Disp 1 sal of Procassed L'ater Report.
Safety Evaluation eport far Use of P1Lsna Arc Cutting Torch.
l Terporary Reactor Vessel Filtration systen Safety Evaluation Report.
R.,v 1 <. i a o 3.
Safety Evaluation fur the Addition of Coagulant to the F.CS.
l Prenurizer Defueling Safety Evaluation Report.
[
Revistd Defueling Canister Dewatering Criteria.
The Ex-Vcssel Nfueling SER for Def ueling of the Pressurizer Spray Line was appruvud on Uccmber 22,19C6.
7.
l[ETinG 1
l The next neeting Advisory Pcnel for the Dtcentc.uination of Three l
hile Island hnit 2 is tentatively scheduled for January 21, 1937 in Lancaster, PA.
The e:act da te, tine, location and aqen.fa will b2 l
confir,rd at a later date.
I i
l l omes)
.............l
! c= >
DATs) unc eanu aia no soi nncu o2" OFFICIAL RECORD COPY
o liarold l'..
De4iton 3
January 5,198/
Frar.k J. Mireglia t.RC/TNI-07-001 Persons desiring to speak before the fufvisory Panel are requested to contact Mr. Thucas Saithgall at 71/-291-1042, or urf te hin at 2122 lftirietta Avenue, Lancaster, PA 17603.
ORIONAL sooMap pr.
Wmiam D. Traveva tiillian D. Travers Director TMI-2 Cleanup l'roject Directorate l
i l
l l
i i
1 l
l l
OF FICE )
OJRNAMEk V
....e DOT E )
.ucc Fonu :na io nai sacu o2' OFFICIAL RECORD COPY
i Harold R. benton 4
January 5,1937 Frank J. Miraglia tmC/THI-87-001 INTERI:AL DISTRIUtITIOT tD N X IILE
~
fli!C POR LOCAL PDR EDO OGC EP/i DOE RI I:egiorial iunti.istrutor RI Division Directors Public Affuirs, RI State liaison, CI TiI i!C r/f Till SITE r/f TMI-2 Project Section File T.!I-1 Resident Office (5)
T.'!I Cleariup Project Director.ite (14)
,7 m
/
/
OF FICE >.T.M. I C,P D.....
.T.MI.GP.D..W.....
..T.M(QP.
.If CP.
wa= >.Lyft Mh..QQWgill.....4Irm.4.......y
>r....
1[h
...../.07 1/.[../.07 1[
...../.07 1
/.07 DAM) unc ronu ais ta soi nncu o2d OFFICIAL RECORD COPY