ML20207J010
| ML20207J010 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 12/26/1986 |
| From: | Gucwa L GEORGIA POWER CO. |
| To: | NRC OFFICE OF ADMINISTRATION (ADM) |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737 SL-1761, NUDOCS 8701080254 | |
| Download: ML20207J010 (1) | |
Text
.-.
Georgia Fbwer Company 333 Piedmont Avanue
' Atlanta, Georgia 30308 Telephone 404 526-6526 i
Mailing Address:
A Fbst Office Box 4545 Atlanta, Georgia 30302 g
i Georgia Power
- L T. Gucwe the southem e4x.tnc system Manager Nuclear Safety and Licensing SL-1761 1001C December 26, 1986 U. S. Nuclear Regulatory Comission ATTN: Document Control Desk Washington, D. C.
20555 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57, NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNITS 1, 2 EMERGENCY OPERATIONS PROCEDURES IMPLEMENTATION Gent 1emen:
The following is provided for your information pursuant to requirements contained in NUREG-0737.
The _ symptom-based Emergency Operating Procedures (EOPs) are complete and were implemented at Plant Hatch as of December 1,
1986 The committed completion date for 4
implementation of the E0Ps was December 31, 1986.
If you have questions in this regard, please contact this office at any time.
Sincerely, L. T. Gucwa GKM/lc c: Georc ia Power Company U. S. Nuclear Regulatory Commission Mr. s. P. O'Reilly Dr. J. N. Grace, Regional Administrator Mr. J. T. Beckham, Jr.
Mr. P. Holmes-Ray, Senior Resident Mr. H. C. Nix, Jr.
Inspector - Hatch GO-NORMS Mr. G. Rivenbark, Licensing Project Manager 8701080254 e61226 DR ADOCK 0500 1
1001C
.