ML20207H988

From kanterella
Jump to navigation Jump to search
Notifies of Planned Addition of Two Environ Sample Locations to Table 5 of Offsite Dose Calculation Manual by 860731,per Tech Spec 3.2.1, Monitoring Program Requirement
ML20207H988
Person / Time
Site: Crane 
Issue date: 07/22/1986
From: Standerfer F
GENERAL PUBLIC UTILITIES CORP.
To: Travers W
Office of Nuclear Reactor Regulation
References
0056P, 4410-86-L-0124, 4410-86-L-124, 56P, NUDOCS 8607250156
Download: ML20207H988 (2)


Text

9 GPU Nuclear Corporation g

gf Post Office Box 480 Route 441 South Middletown, Pennsylvania 17057-0191 717 944-7621 TELEX 84-2386 Writer's Direct Dial Number:

(717) 948-8461 4410-86-L-0124 Document ID 0056P

, July 22,1986 TMI-2 Cleanup Project Directorate Attn: Dr. W. D. Travers Director US Nuclear Regulatory Commission c/o Three Mile Island Nuclear Station Middletown, PA 17057

Dear Dr. Travers:

Three Mile Island Nuclear Station, Unit 2 (TMI-2)

Operating License No. DPR-73 Docket No. 50-320 TMI-2 Appendix B Technical Specification 3.2.1 Notification In accordance with TMI-2 Appendix B Technical Specification 3.2.1, " Monitoring Program Requirement", GPU Nuclear is providing notification of the addition of the following environmental sample locations to Table 5 of the Offsite Dose Calculation Manual (ODCM):

Station Code Location Distance and Direction P1-2 North of Unit 1 Screenhouse 0.2 Miles WNW 2840 M1-2 This station will be placed on the islands adjacent to TMI in the WSW sector. Due to uncertain access to island locations, the exact location cannot be pre-determined. The distance and direction of this sampling station will be provided following installation.

The above stations will be added to the Radiological Environmental Monitoring Program by July 31, 1986.

8607230156 860722 PDR ADOCK OSOO O

GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation g Q i

q-O Dr. Travers July 22,1986 4410-86-L-0124 Additionally, TLD station code D2-1, which was added on July 1, 1986, has been changed to D2-2 to avoid confusion with a previously existing Reuter-Stokes location.

Sincerely, h

F. R. Stande er Vice President / Director, TMI-2 FRS/RDW/eml l

i i

.I i

i i

l l

,. - -.. = _ _.. -. -_. _... -., _., _ _ _ _. - - - _