Discusses 1986 Updated FSAR Changes,Including Descriptions of RCS Gas Vent,Containment Radiation Monitoring & Emergency Operation Procedures.Revised FSAR Pages Sent Under Separate Cover
ML20207H982
Person / Time
Site: Point Beach  
Issue date: 07/21/1986
From: Fay C
WISCONSIN ELECTRIC POWER CO.
To: Harold Denton, Lear G
Office of Nuclear Reactor Regulation
References
CON-NRC-86-70 VPNPD-86-323, NUDOCS 8607250154
Download: ML20207H982 (2)


Text

1 Wisconsin Electnc eom couem 231 W. MICHIGAN, P.O. BOX 2046. MILWAUKEE, WI 53201 VPNPD-86-323 NRC-86-70 July 21, 1986 Mr. H. R. Denton, Director Office of Nuclear Reactor Regulation U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C.

20533 Attention:

Mr. George Lear, Project Director PWR Project Directorate 1 Gentlemen:

DOCKETS 50-266 AND 50-301 PERIODIC UPDATING OF FINAL SAFETY ANALYSIS REPORT POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 In accordance with 10 CFR 50.71(e), Wisconsin Electric Power Company, Licensee for Point Beach Nuclear Plant, Units 1 and 2, submits the 1986 revision to the Point Beach Nuclear Plant Final Safety Analysis Report (FSAR).

As requested, one original and twelve copies of these revised pages are being furnished under separate cover.

Each copy contains revised FSAR pages that are to be inserted in accordance with the accompanying instructions.

The information contained within the updated FSAR pages represents those changes made since our 1985 submittal which was necessary to reflect information and analyses submitted to the Commission or prepared pursuant to Commission requirements.

All changes made under the provisions of 10 CFR 59 which are included in this update have been previously identified to the Commission in the Annual Results and Data Report.

The most significant changes included in this update are listed below:

1.

Description of the NCS Gas Vent System.

2.

Updated description of the Containment Radiation Monitoring System.

8607250154 860721 L

PDR ADOCK 0S000266

'(p 1

\\

P PDR l ()

T Mr. H. R. Denton July 21, 1986 Page 2 3.

Description of the Auxiliary Safety Instrument Panel (ASIP) and associated systems.

4.

Updated description of station batteries, 125 DC system, and instrument bus power distribution.

5.

Updated description of plant Emergency Operating Procedures (EOP'G).

6.

Revisions to Section 1.8, Quality Assurance Program (detailed justification of these changes were provided in our June 27, 1986 submittal to the NRC Office of Inspection and Enforcement, Region III).

Copies of the 1986 update to the Point Beach FSAR will be submitted to the following state and local organizations.

1.

Public Service Commission of Wisconsin 2.

State of Wisconsin Department of Natural Resources 3.

State of Wisconsin Department of Health and Social Services 4.

Town Chairman, Town of Two Creeks Very truly yours,

.J' hd 'af'.

C. W.

ay Vice President Nuclear Power Copy to Resident Inspector Subscribed and sworn to before me this 21st day of July 1986.

\\

lh

)-

L 1o94v

/u gosAct(m es Notary Public, State ofiWisconsin My Commission expires May 27, 1990.

,<,---.--,,r

,e-

-,. - -.., - - - ~ - -. - - - - - - - -

.