| To: | Fadden D INSTITUTE OF NUCLEAR POWER OPERATIONS |
| References | |
| REF-GTECI-099, REF-GTECI-B-56, REF-GTECI-EL, REF-GTECI-NI, TASK-099, TASK-99, TASK-B-56, TASK-OR GL-87-11, IEIN-87-033, IEIN-87-33, NUDOCS 8808300135 | |
| Download: ML20207H949 (5) | |
Text
.
AUG 2 31988 Dennis L. Fadden Institute of Nuclear Power Operations Suite 1500, 1100 Circle 75 Parkway Atlanta, Georgia 30339-3064
Dear Mr. Fadden:
Enclosed for your information is our biweekly listing of generic comuni-cations being considered or under development by the NRC staff. These include Bulletins (type coded BL on the list), Information Notices (IN) and Generic Letters (GL). This listing includes all proposed generic comunications that had been reported to us by August 17, 1988.
Sincerely, Isl Carl H. Berlinger, Chief Generic Comunications Branch Division of Operational Events Assessment Office of Nuclear Reactor Regulation
Enclosure:
As stated DISTRIBUTION w/ enclosure All NRC Division Directors All NRC Branch Chiefs CERossi, NRR
)
CHBerlinger, NRR l
DCKirkpatrick, NRR PDR Central Files DCS DOEA R/F 0GCB R/F DKirkpatrick R/F LDerderian, DOE RBarber, DOE 6
ccc Acc ggp OGCB:00EA:NRR C/0GCB:00EA:NRR
/p )'-).
,p (I
DCKirkpatrick CHBerlinger 07/23/88 07/13/88 1
8808300135 080823 PDR ORG EPSI
Pago No.
1 08/19/88 PROPOSED GENERIC COMMUNICATIONS IN PREPARATION-WITHIN THE NRC TP ORIGIN.
SU8 JECT CONTACT PHONE ISSUE OFFICE DATE I
IN NRR/DRIS ENVIRONMENTAL QUALIFICATION Steve (301) 09/30/88 RVIB OF LIMITOROUE MOV ACTUATOR Alexander 492-0995 TERMINAL BLOCKS & MARATHON 1600 TERMINAL BLKS GL REGION HEAT EXCHANGER FOULING.
Vern Hodge (301) 09/01/88 II 492-1169 IN NRR/DOEA BWR VESSEL OVERFILL EVENTS.
Pat (301) 09/15/88 EAB Baranowski 492-1156 GL NRR/DOEA ELECTRIC POWER SYSTEMS-
- Schulten, (301) 09/15/88 EAB INADEQUATE CON 1ROL OVER Fields 492-1192 DESIGN PROCESS IN NRR/ DEST ERRORS IN CALIBRATION OF Joe Joyce (301) 09/01/88 SICB LEAD / LAG AND RATE CIRCUITS IN 492-3265 REACTOR PROTECTION SYSTEMS.
GL NRR/DLPD SAFETY PARAMETER DISPLAY Dick (301) 09/15/88 SYSTEM - ACCEPTABLE METHODS Eckenrode 492-1014 OF IMPLEMENTING REQUIREMENTS GL RES/DE SAFETY RELATED MOTOR OPERATED Owen (301) 10/01/88 EIB VALVE TESTING AND INSPECTION Rothberg 492-3815 IN RES/EME LIMITOROUE SMA SPRING Jerry (301) 09/01/88 DEFORMATION Weidenhamer 492-3839 IN NRR/DOEA CHANGE IN FORMAT FOR NRC Vern Hodge (301) 10/01/88 OGCB GENERIC COMMUNICATIONS 492-1169 GL RES/DE SIPPLEMENT TO GENERIC LETTER John (301) 12/01/88 SSEB 87-11 DEALING WITH ARBITRARY O'Brien 492-3928 INTERMEDIATE PIPE RUPTURE REQUIREMENTS GL NRR/ DEST REQUIREMENTS FOR RESOLUTION W C Lyon (301) 08/31/88 SRXB OF GI99 FOR OPERATION WITH 492-0891 LOWERED RCS INVENTORY AND FOR RELATED ISSUES GL NRR/ DEST INSERVICE INSPECTION OF WS (301) 01/30/89 j
EMTB PRESSURE RETAINING WELDS IN Ha r e.'. t o n 492-0911
)
THE REACTOR VESSEL GL AEOD LICENSEE COMMITMENTS FOR John (301) 08/30/88 EMERGENCY RESPONSE DATA Hickman 492-4155 SYSTEM (ERDS) IMPLEMENTATION L
Page No.
2 08/19/88 PROPOSED GENERIC COMMUNICATIONS IN PREPARATION WITHIN THE NRC TP ORIGIN.
SU8 JECT CONTACT PHONE ISSUE OFFICE DATE GL NRR/ DEST NRR RECOMMENDATION ON ISI OF Chen P Tan (301) 12/30/88 ESGB MARK I & II STEEL 492-0829 CONTAINMENTS, REFUELING CAVITIES & ASSOC DRAINAGE SYS GL RES/DRPS INDIVIDUAL PLANT EXAMINATION Farouk (301) 09/22/28 RHFB FOR SEVERE ACCIDENT Eitawila 492-3910 VULNERABILITIES - 10 CFR 50.54 GL NRR/ DEST RESOLUTION OF GENERIC ISSUE Om P Chopra (301) 10/30/88 SELB B-56, DIESEL RELIABILITY 492-0835 GL NRR/ DEST INSERVICE TESTING FOR PUMPS Ted (301) 09/03/88 EMEB AND VALVES Sullivan 492-0901 GL NRR/DOEA LINE ITEM TECHNICAL Tom Dunning (301) 09/01/88 OTSB SPECIFICATION IMPROVEMENT -
492-1189 REMOVAL OF CYCLE SPECIFIC PARAMETER LIMITS GL NRR/DOEA LINE ITEM TECH SPEC Wayne (301) 09/15/88 OTSB IMPROVEMENT-RELOCATION OF Meinke 492-3152 RADIOLOGICAL EFFLUENT REQUIREMENTS TO OFFSITE DOSE CALCULATION MANUAL GL NRR/DOEA LINE ITEM TECHNICAL Tom Dunning (301) 10/15/88 OTSB SPECIFICATION IMPROVEMENT -
492-1189 REMOVAL OF COMPONENT LISTS IN NMSS/AB EVALUATION OF EXTERNAL Harriet (301) 09/01/88 l
EXPOSURE READINGS OF LICENSEE Karagianni 492-0633 PERSONNEL DOSIMETERS IN NRR/DRIS INADEQUATE FIRE DAMPER Joe (3' >
09/30/88 VIB OPERABILITY TESTS UNDER AIR Petrosino 492-0979 FLOW CONDITIONS IN NRR/DRIS POTENTIAL MANUFACTURER Joe (301) 10/30/88 VIB DEFECTS IN CUTLER HAMMER E-30 Petrosino 492-0979 SWITCHER MANUFACTURED PRIOR TO A CERTAIN DATE IN NRR/ DEST RECENT DISCOVERY OF Jack (301) 09/01/88 SPLB PHENOMENON NOT PREVIOUSLY Kudrick 492-0871 CONSIDERED IN THE DESIGN OF SECONDARY CONTAINMENT PRESSURE CONTROL
.-vv e
-,-e----,.,y
Page No.
3 08/19/88 PROPOSED GENERIC COMMUNICATIONS IN PREPARATION WITHIN THE NRC TP ORIGIN.
SUBJECT CONTACT PHONE ISSUE OFFICE DATE IN REGION FAILURE OF AMP-KYNAR SPLICES A.
S.
(312) 09/01/88 III AND THOMAS & BETTS NYLON WIRE Gautam 790-5523 CAPS DURING EQUIPMENT QUALIFICATION TEETING IN NRR/DREP IMPROPER IMPLEMENTATION OF Tom Essig (301) 09/15/88 RPB HIGH RADIATION AREA CONTROL 492 *146 REQUIREMENTS GL NRR/ DEST MINIMUM EDGE DISTANCE FOR J Ma & R (301) 11/01/88 ESGB INSTALLATION OF ANCHORS IN Lipinski 492-1376 CONCRETE IN NRR/ DEST PROBLEMS IN VARIOUS EJ (301) 09/01/88 EMEB LICENSEE'S CHECK VALVE Sullivan 492-0901 TESTING PROGRAMS IN NRR/ DEST THERMAL STRATIFICATION P T Kuo (301) 08/30/88 EMEB INDUCED OVERSTRESS CONDITION 492-0907 OF SURGE LINE PIPING AT TROJAN IN NRR/DRIS SUPP TO IN 87-33: 10CFR PART JJ (301) 09/30/88 VIB/PDRI 21 ISSUES REGARDING Petrosino 492-0979 S
INADEQUATELY PERFORMED EVALUATIONS OF DEVIATIONS &
NONCONFORMANCES IN NRR/DRIS VALVE FRICTION FORCE JJ (301) 10/30/88 VIB/PDRI CALCULATION METHODS IN REGARD Petrosino 492-0979 j
S TO VALVE OPERATOR SIZING IN NRR/ DEST DIRECTION DEPENDENT LEAK James (301) 08/31/88 SPLB CHARACTERISTICS OF Pulsipher 492-0877 CONTAINMENT PURGE VALVES IN NRR/DRIS DEFECTIVE MOTOR SHAFT KEYS IN Jeff (301) 09/30/88 RVIB LIMITOROUE MOTOR ACTUATORS Jacobson 492-0996
{
IN AEOD THE REPORTING OF SAFETY VALVE Mary S.
(301) 09/08/88 AND SAFETY-RELIEF VALVE Wegner 492-7018 EVENTS PURSUANT TG 10 CFR i
50.73 GL NRR/DREP CHANGE IN THE REGULATORY John (301) 10/03/88 PRPB LIMIT FOR OCCUPATIONAL Buchanan 492-1097 EXPOSURE OF THE SKIN TO BETA RADIATION FROM HOT PARTICLES
Paga No.
4
.08/19/88 PROPOSEC-GENERIC COMMUNICATIONS IN PREPARATION WITHIN THE NRC TP ORIGIN.
SUBJECT CONTACT FHONE ISSUE OFFICE DATE IN NMSS ACTIONS TAKEN TO DATE ON Michael (301) 10/01/88 DLLWD/TB TOPICAL REPORTS ON LOW LEVEL Tokar 492-0590 WASTE FORMS AND HIGH INTEGRITY CONTAINERS IN NRR/DRIS KAPTON INSULATION USED IN Richard C.
(301) 08/31/88 VIB ELECTRICAL CONTAINMENT Wilson 492-0997 FENETRATION CIRCUITS IN NMSS SHIPMENT OF CONTAMINATED A.
W.
(301) 11/15/88 SGTR/OB EQUIPMENT BE1 WEEN NUCLEAR Grella 492-3381 POWER STATIONS GL NRR/DOEA VOLUNTARY ENTRY INTO R.J.
(301) 11/15/88 OTSB TECHNICAL SPECIFICATION 3.0.3 Giardina 492-1188 IN NRR/DOEA INADEQUATE NET POSITIVE Peter Wen (301) 09/15/88 OGCB SUCTION HEAD FOR HIGH 492-1172 PRESSURE SAFETY INJECTION PUMPS AT PRESSURIZED WATER REACTORS IN NRR/ DEST CHECK VALVE FAILURES AT Horace K.
(301) 09/15/88 EMEB MCGUIRE AND OTHER PLANTS Shaw 492-0906 s