ML20207H881
| ML20207H881 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 08/24/1988 |
| From: | Gridley R TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| NUDOCS 8808300079 | |
| Download: ML20207H881 (3) | |
Text
n.
I TENNESSEE VALLEY AUTHORITY CH ATTANOOGA. TENNESSEE 374o1 SN 157B Lookout Place AUS 241988 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C.
20555 Gentlemen:
In the Matter of
)
Docket Nos. 50-327 Tennessee Valley Authority
)
50-328 SEQUOYAH NUCLEAR PLANT (SQN) - TVA NUCLEAR ENGINEhRING (NE) CALCULATION EFFORT
Reference:
TVA letter to NRC dated January 19, 1988, "TVA Division of Nuclear Engineering (DNE) Calculation Effort" In the referenced letter, TVA committed to complete the calculation associated with NRC observation EEB-9 by August 1, 1988. TVA agreed to revise the calculation, "Containment Electrical Penetration Protection,"
to address current ambient temperature and changes in resistance in the conductor because of temperature changes, including assessment of heat dissipation; geometry of the penetration; wind effects; and heating, ventilating, and air conditioning.
Because of emergent work and the emphasis on unit 1 restart commitments, this postrestart commitment will be completed by November 1,1988.
Summary statements of commitments contalad in this submittal are provided in the enclosure. Please direct questions concerning this issue to M. J. Burzynski at (615) 870-6172.
Very ttrly yours, 1
TENNESSEE VALLEY AUTHORITY R. Grid ey, Manager Nuclear Licensing and Regulatory Affairs j
Enclosure cc:
See page 2 l
G3 F
P An Equal Opportunity Employer
'U.S. Nuclear Regulatory Commission cc (Enclosure):
Ms. S. C. Black, Assistant Dicoctor for Projects TVA Projects Division U.S. Nuclear Regulatory Commission one White Flint, North 11555 Rockville Pike Rockville, Maryland 20852 Mr. F. R. McCoy, Assistant Director for Inspection Prograns TVA Projects Division U.S. Nuclear Regulatory Commission Region 11 101 Marietta Street, NW, Suite 2900 Atlants, coorgia 30323 Sequoyah Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, Tennessee 37379 1
l l
ENCLOSURE REVISED COMMITMENT LIST SQN TVA NE '
CALCULATION EFFORT TVA will revise the calculation identified in EEB-9 by November 1,1988.
l
_