ML20207H336
| ML20207H336 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 08/18/1988 |
| From: | Gridley R TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| NUDOCS 8808250268 | |
| Download: ML20207H336 (2) | |
Text
- _ _ _ _ __ _
TENNESSEE VALLEY AIJTHORITY 5N 157B Lookout Place Aub 181000 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washingcon, D.C.
20555 Gentlemen:
In the Matter of
)
Docket Nos. 50-327 Tennessee Valley Authority
)
50-328 SEQUOYAH NUCLEAR PLANT (SQN) - NRC CONFIRMATORY MEASUREMENT PROGRAM
Reference:
TVA letter to NRC dated August 3, 1988 The results that were provided in the referenced letter were incorrectly reported in curie per milliliter (Ci/ml); the Iron-55, Strontium-89, and Stronitum-90 results should have been reported in microcurie per milliliter (pCi/ml).
The following are the results of radiochemical analyses performed by SQN personnel on the spiked sample received from Idaho Falls as part of the NRC Confirmatory Measurement Program.
Trith a 2.14E-05 pCi/ml Iron-55 2.12E-05 pCi/ml Strontium-89 1.36E-04 pCi/mi Strontium-90 3.03F.-0b pCi/ml D1 ease direct questions concerning this issue to M. J. Burzynski at (615) 870-6172.
Very truly yours.
TENNESSEE VAL Y AUTHORITY I
R. Gridley, Manal;er Nuclear Licensing and Regulatory Affairs O
cc: See page 2 l\\
8808250268 880918 FOR ADOCK 05000327 P
PDC An Equal Oppor tumt/ Employer t
F....I AUG 181988
~
i
) U.G. Nuclear Regulatory Comission cc:
Ms. S. C. Black, Assistant Director l
for Projects TVA Projects Division U.S. Nuclear Regulatory Ccmaission One White Flint, North 11555 Rochville Pike Rockville, Maryland 20852 Mr. F. R. McCoy, Assistant Director for Inspection Programs TVA Projects Division U.S. Nuclear Regulatory Comission i
Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Sequoyah Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy Daisy, Tennessee 37379 I
1 l
l.
j
_,