ML20207H092

From kanterella
Jump to navigation Jump to search
Notification of 880428 SALP Mgt Meeting 88-055 W/Util in Waterford,Ct to Discuss SALP
ML20207H092
Person / Time
Site: Millstone  
Issue date: 04/11/1988
From: Mccabe E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8808240348
Download: ML20207H092 (2)


Text

r p.

APR 1 1 O U.S. NUCLEAR REGULATORY. COMMISSION No.88-055 REGION I NOTICE OF SIGNIFICANT LICENSEE MEETING Licensee:

Northeast Nuclear Energy Company Facility:

Millstone Units 1 and 2 Docket Nos:

50-245; 50-336 Time and Date:

1:00 p.m., April 28, 1988 Location:

Training and Simulator Complex, Millstone Site, Waterford, CT

Purpose:

SALP Management Meeting NRC Attendees:

W. Kane, Director, Division of Reactor Projects (DRP)

L. Bettenhausen, Chief, Projects Branch No. 1, DRP

.E. McCabe, Chief, Reactor Projects Section 18, ORP J. Stolz, Director, Project Directorate I-4, NRR

0. Jaffe, M111sto:.a 2 Project Manager, PO-I4, NRR W. Raymond, Senior Resident Inspector L. Kolonauski, Resident inspector P. Habighorst, Resident Inspector i

Licensee Attendees: W. Ellis, Chairman and CEO J. Opeka, Executive Vice President - Engineering and Operations E. Mroczka, Senior Vice President - Nuclear Engineering and Operations Group W. Romberg, Vice President, Nuclear Operations S. Scace, Station Superintendent J. Stetz, Unit 1 Superintendent J. Keenan, Unit 2 Superintendent Note: Attendance by NRC personnel at this meeting should be made known by 4:00 p.m.,

April 27, 1988 via telephone call to E. McCabe, Region I, at FTS 8-346-5231.

8 Prepared by: #

Ebe C. McCabe, Chief, RPS 18 i

1 1

0FFICIAL RECORO COPY LIC MTG NOTICE 88-055 - 0001.0.0 04/08/88 f4N(

i esos240348 88041i ADOCK 0500 45 gDR L

y A

4%

2 APR 111918 i

Distribution:

Victor Stello, Jr., Executive Director for Operations James M. Taylor, Deputy Executive Director for Regional Operations James G. Partlow, Directe, Division of Reactor Inspector and Safeguards, NRR James Lieberman, Director, Office of Enforcement Larry Chandler, Assistant General Counsel for Enforcement r

T, E. Murley, Director, Office of Nuclear Reactor Regulation T. T. Martin, Acting Associate Director for Inspection and Technical _ Assessment, NRR B. Boger, Assistant Director for Region I Reactors, NRR B. Clayton, Regional Coordinator, E00 M. Boyle, Millstone 1 Project Manager, NRR 4

J. Stolz, Director, Project Directorate I-4, NRR

0. Jaffe, Millstone 2 Project Manager, PC-14, NRR Public Document Room (POR)

Local Public Document Room (LPOR)

State of Connecticut bec:

Regional Administrator Deputy Regional Administrator Division Directors Branch Chiefs Section Chiefs Public Affairs Officer M. Miller; RI Region I Receptionist DRMA Files ORP Files Bulletin Board M. 010onato, ORP i

i i

l 1

i RI:0RP McCabe eo 4/8/88 i

,1 J'

j OFFICIAL RECORD COPY LIC MTG NOTICE 88-055 - 0002.0.0 04/08/88 I

4

- i

- -