ML20207G990

From kanterella
Jump to navigation Jump to search
Notification of 880705 SALP Board Meeting 88-094 W/Licensee in King of Prussia,Pa
ML20207G990
Person / Time
Site: Pilgrim
Issue date: 06/17/1988
From: Blough A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8808240323
Download: ML20207G990 (2)


Text

.

'3-JUN U IBB A

/

No.88-094 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF BOARD MEETING Name of Licensee: Boston Edison Company

- Name of Facility: Pilgrim Nuclear Power Station

- Docket No.: 50-293 '

Time and Date of Meeting: 10:00 A.M. , July 5,1988 Location of Meeting: NRC Region'I, King of Prussia, Pennsylvania.

Division of Reactor Projects-(DRP) Conference Room Purpose of Meeting: Systematic Assessment of Licensee Performance (SALP)

Board Meeting NRC Attendees: W. Kane, Director, Division of Reactor Projects (DRP)

5. Collins, Deputy Director, DRP G. Sjoblom, Acting Director, Division of Radiation Safety and Safeguards (DRSS)

W. Johnston, Acting Director, Division of Reactor Safety (DRS) ,

J. Wiggi.1s, Chief, Reactor Projects Branch No. 3, DRP R. Bellamy, Chief, Facilities Radiological Safety and Safeguards Branch, DRSS R. Gallo, Chief, Operations. Branch, DRS J. vurr, Chief, Engineering Branch, DRS-R. Blough, Chief, Reactor Projects Scction No. 38, DRP L. Doerflein, Project Engineer, RPS 3B, ORP C. Warren, Senior Resident Inspector J. Lyash, Resident Inspector T. Kim, Resident Inspector R. Wessman, Director, Project Directorate I-3, Office-of Nuclear Reactor Regulation (NRR) ,

D. Mcdonald, Licensing Project Manager, NRR  ;

Note: Attendance by NRC personnel at this meeting should be made known by 4:00 p.m., June 29, 1988, via telephone call to R. Blough, Region I, I

at FTS 8-346-5146 or (215) 337-5146  !

Prepared By: #dN1'*1 Glaced 3F4 l A. Randy Blough, Chief l Reactor Projects Section No. 3B '

i OFFICIAL AECORD COPY MEETING NOTICE NO.88-094 - 0001.0.0

(- p J l

06/1//88 8808240323 880617 / g y ;l PDR ADOCK 05000293 ,4. 1 o PDC ,

__ _ _ _ _ _ _ ______x___ . - - _ _ _ _ _ _ _ _ _ _

s s'

,' Meeting Notice No.88-094 2 JlJN 171988.

Distribution:

V. Stello, Jr. , Executive Director for Operations J. Taylor, Deputy Executive Dir3ctor for Regional Operations B. Grimes, Acting Director, Division of Reactor Inspection &. Safeguards, NRR J. Lieberman, Director, Office of Enforcement-L. Chandler, Assistant General Counsel for Enforcement T. Murley, Director, Office of Nuclear Reactor Regulation T. Martin, Acting Associate Director for Inspection & Techn: cal Assessment, NRR S. Varga, Director, Division of Reactor Projects, NRR

-B. Boger, Assistant Director for Region I Reactors, NRR R. Wessman, Project Directorate, I-3, NRR D. Mcdonald, Project Manager, NRR B. Clayton, Regional Coordinator, ED0 Public Document Room (POR)

Local Public Document Room (LPDR) bec:

Regional Administrator Deputy Regional Administrator Divisica Directors Branch Chiefs Section Chiefs Region I Receptionist PA0 DRMA Files DRP Files Bulletin Board M. J. DiDonato, DRP C. Warren, SRI - Pilgrim b RI:DRP RI:DRP RI:DRP LDoerflein/mjd RBlough JWiggins 6//7/88 6//788 6/b/88 0FFICIAL RECORD COPY MEETING NOTICE NO.88-094 - 0002.0.0 06/17/88