r

(

Organization 5.2 A

Il 5.2 Organization (continued)

~

5.2.2 Unit Staff The unit staff organization shall include the following:

a.

A non-licensed operator shall be on site wrien fuel is in the reactor vessel. and an additional non-licensed o shall be on site while the unit is in MODE 1. 2.perator or 3.

b.

At least one licensed Reactor Operator (RO) shall be present in the control room when fuel is in the reactor.

In addition, while the unit is in MODE 1. 2. or 3. at least one licensed Senior Reactor Operator (SRO) shall be present in the control room.

c.

Shift crew composition may be one less than the minimum j

requirements of 10 CFR 50.54(m)(2)(1) and Specifications 5.2.2.a and 5.2.2.g for a period of time not i

to exceed two hours in order to accommodate unexpected absence of on-duty shift crew members, provided immediate action is taken to restore the shift crew composition to within the minimum requirements.

d.

A health physics technician shall be on site when fuel is in the reactor. The position may be vacant for not more than 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />, in order to provide for unexpected absence, provided immediate action is taken to fill the required position.

e.

Administrative procedures shall be developed and implemented to limit the working hours of unit staff who perform safety related functions (e.g., licensed SR0s, licensed R0s, health physicists auxiliary operators, and key maintenance personnel). The procedures shall include guidelines on working hours that ensure that adequate shift coverage is maintained without routine heavy use of overtime.

Any deviation from the working hour guidelines shall be authorized in advance by the Plant Manager or his designees, in accordance with approved administrative procedures, or by higher levels of management. in accordance with established procedures and with documer.tation of the basis for grantirj the deviation.

Controls shall be included in the procedures such that the individual overtime shall be reviewed monthly by the Plant Manager or his designees to ensure that excessive hours have not been assigned. Routine deviation from the working hour guidelines is not authorized.

f (continued)

I PERRY-LNIT1 5.0-3 Arenuit ib. 98 9906140042 990607 PDR ADOCK 05000440 P

PDR

p Organizatim 5.2 I

5.2 Ortjanizatim 5.2.2 thit Staff (continued)

I f.

The operations nanager or at least one operations middle nanager shall hold an SR0 license.

g.

The shift technical advisor (STA) shall provide advisory technical stoport to the shift stpervisor (SS) in the areas of thental Feiraulics, reactor engineering, and plant analysis with regard to the safe operation of the mit.

In addition the STA shall meet the qualifications specified by the Cmmission Policy Statement on Engineering Expertise on shift. The STA position nay be filled by an on-shift SS or SRO provided the individual meets the Conmission Policy Statement on Engineering Expertise on shift.

i l

PERRY - LNIT 1 5.0-3a Aiu s eit No. 98

7 e

.I L. Myers Perry Nuclear Power Plant, Units 1 and 2 FirstEnergy Nuclear Operating Company cc:

James R. Williams Mary E. O'Reilly Chief of Staff

' FirstEnergy Corporation Ohio Emergency Management Agency 76 South Main St.

2855 West Dublin Granville Road Akron, OH 44308 Columbus, OH 43235-7150 Resident inspectors Office Mayor, Village of Perry U.S. Nuclear Regulatory Commission P.O. Box 100 P.O. Box 331 Perry, OH 44081-0100 Perry, OH 44081-0331 Radiological Health Program Regional Administrator, Region ill Ohio Departrt*nt of Health U.S. Nuclear Regulatory Commission P.O. Box 118 801 Warrenville Road Columbus, OH 43266-0118 Lisle, IL 60532-4531 Ohio Environmental Protection Sue Hiatt Agency OCRE Interim Representative DERR-Compliance Unit 8275 Munson ATTN: Mr. Zack A. Clayton Mentor, OH 44060 P.O. Box 1049 Columbus, OH 43266-0149 Henry L. Hegrat Regulatory Affairs Manager Chairman FirstEnergy Nuclear Operating Company Perry Township Board of Trustees Perry Nuclear Power Plant 3750 Center Road, Box 65 P.O. Box 97, A210 Perry, OH 44081 Perry, OH 44081 State of Ohio William R. Kanda, Jr., Plant Manager Public Utilities Commission FirstEnergy Nuclear Operating Company East Broad Street Perry Nuclear Power Plant Columbus, OH 43266-0573 P.O. Box 97, SB306 Perry, OH 44081 Mayor, Village of North Perry North Perry Village Hall 4778 Lockwood Road North Perry Village, OH 44081 1

Donna Owens, Director Ohio Department of Commerce Division ofIndustrial Compliance Bureau of Operations & Maintenance 6606 Tussing Road P. O. Box 4009 Reynoldsburg, OH 43068-9009 i

. _ _.. _