Forwards Proposed Schedule for Implementing Inservice Testing Program,Per Open Item from Insp Rept 50-298/88-21
ML20207G369
Person / Time
Site: Cooper Entergy icon.png
Issue date: 08/12/1988
From: Trevors G
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CNSS887411, NUDOCS 8808240102
Download: ML20207G369 (2)


Text

-

a

'W GEMR4 Cf nCE Nebraska Public Power District

" "?S$ZWSM" ' ' '

< ' mm= n=== =mw=.=== z= w====== n x = n-CNSS887411 August 12, 1988 U.S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Inservice Test (IST) Program Cooper Nuclear Station NRC Docket No. 50-298, DPR-46 References NRC Inspection Report No. 50-298/88-21 dated August 8, 1988 Gentlemen:

The refereaced inspection of the Cooper Nuclear Station (CNS) Inservice Test (IST) Program was conducted during June 20-24 and July 11-15.

At the exit meeting held on July 15, 1988, one of the open items identified by the inspectors was the submittal of a proposed echedule for implementing the IST procedures necessary to conform to Revision 5 of the IST Program.

This does not include those items still under negotiation with the NRC staff.

The District committed to submit the schedule to Region IV within 30 days.

However, the referenced inspection report, received August 11, 1988, indicated the schedule would be submitted by July 31, 1988.

The District regrets thi-misunderstanding.

Accordingly, a schedule for ptocedure update and implementation is provided (Attachment 1) with 33 procedures identified for revision and 7 new procedures to be written.

If you have any questions, please contact E. M. Hace. CNS Engineering Manager (402-825-5420).

Sincerely,

/N 81-G. A. Trevors Division Manager 8800240102 $$h90 Nuclear Support PDR ADOCK pgy CAT:KCWarg g

Attachment cc:

U.S. Nuclear 'agulatory Commission Region Office - Region IV h

I lI I NRC Resident Inspector Cooper Nuclear Station if,y l l f

}D.l A% *l ?% Y 5$5$[Y[$')]((]l[?}."[?WhS[&$1?[f&,.[

.y.

  • F ATTACHMENT 1 SCHEDULE FOR PROCEDURE UPDATE AND IMPLEMENTATION The following existing procedures (17) are currently. undergoing revision and will be. issued by October, 1988.

The' revised version will be'used during the next required performance of the associated test.

6.2.2.2.6

6. 3. 5.1' 6.3.16.2 6.2.6.3 6.3.5.2' 6.3.18.2 6.3.1.4 6.3.9.4 6.3.18.3 6.3.1.5 6.3.10.5 6.3.20.1 6.3.3.2 6.3.10.7 6.4.8.5 6.3.4.2 6.3.10.15 Approximately four_new procedures with a test frequency of each refueling outage will be issued by April, 1989 (the estimated start date of the next refueling outage). They will be performed during that outage.

The following existing procedures (8), which have a test frequency of each refueling outage or are only performed during a refueling. outage, will be revised and issued by -pril, 1989 (next refueling outage). They will be performed during that outage, as applicable.

6.3.1.1 6.3.10.19 6.3.2.1 7.2.55 6.3.8.4 7.5.2.13 6.3.9.1 10.9 Three new procedures, which have a quarterly' test frequency, will be issued by December, 1988 and performed during the first quarter of 1989.

The following existing procedurac (4). will he revised, issued, and' performed by January, 1989.

6.3.12.1 6.3.12.8 6.3.12.2 6.3.16.1 The following existing procedures (2) will be revised, issued, and performed by December, 1988.

6.3.6.1 6.3.6.4 The following existing procedures (2) will be revised, issued, and performed by November, 1988.

6.3.4.1 6.3.10.13 l

.